Unit of competency
Modification History
Release |
Comments |
Release 1 |
This version first released with ICT Information and Communications Technology Training Package Version 2.0. |
Application
This unit describes the skills and knowledge required to follow predetermined procedures to ensure operability of the system while minimising impact on affected customers.
It applies to individuals working as field officers, technicians or technical supervisors, for telecommunications carriers, contractors or other service providers, who install new, additional and replacement equipment in telecommunications systems and networks, including support and administrative infrastructures for integration of new and emerging internet protocol (IP) based technologies.
No licensing, legislative or certification requirements apply to this unit at the time of publication.
Unit Sector
Telecommunications – Telecommunications Networks Engineering
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Plan integration strategy |
1.1 Determine nature and scope of the integration activity of systems from appropriate personnel 1.2 Prepare an integration management plan in agreement with appropriate personnel 1.3 Obtain outage management plan if available, otherwise prepare a contingency plan to ensure the system integration goes according to a plan 1.4 Identify affected systems, traffic and customers 1.5 Notify alarm management centre of action planned and obtain authority to proceed 1.6 Notify customers affected by the outage of time and likely duration |
2. Integrate and test new system in the network |
2.1 Plan and conduct activities over a set of integration phases safely and according to the integration management plan 2.2 Load operational software according to specification to ensure interoperability of new and existing system 2.3 Undertake tests by simulating network traffic and ensure test results are recorded and stored according to enterprise requirements 2.4 Analyse test results and ensure established parameters have all been met 2.5 Evaluate problems during the testing phase and rectify or escalate procedure 2.6 Analyse alarms for fault conditions in conjunction with the network management centre 2.7 Locate and detect faults within capability, or escalate according to enterprise policy 2.8 Check operations administrative maintenance system and alarms are connected according to instruction manual 2.9 Activate new alarms and deactivate old alarms |
3. Complete administrative tasks |
3.1 Complete integration records according to manufacturer’s specification and enterprise policy and make recommendations for improvement for future planning 3.2 Notify appropriate personnel of project completion and obtain sign-off |
Foundation Skills
This section describes language, literacy, numeracy and employment skills incorporated in the performance criteria that are required for competent performance.
Skill |
Performance Criteria |
Description |
Reading |
2.2-2.4, 2.8, 3.1 |
|
Writing |
1.2-1.6, 2.3, 3.1 |
|
Oral Communication |
1.1, 1.2, 1.5, 1.6 |
|
Numeracy |
2.4 |
|
Navigate the world of work |
2.1, 2.7, 3.1 |
|
Interact with others |
1.1, 1.2, 1.5, 1.6, 3.2 |
|
Get the work done |
1.3, 1.4, 2.1, 2.2, 2.3, 2.5-2.9 |
|
Unit Mapping Information
Code and title current version |
Code and title previous version |
Comments |
Equivalence status |
ICTTEN506 Integrate new systems and equipment into the telecommunications network |
ICTTEN5060A Integrate new systems and equipment into the telecommunications network |
Updated to meet Standards for Training Packages. |
Equivalent unit |
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=a53af4e4-b400-484e-b778-71c9e9d6aff2