Unit of competency details

ICTTEN5060A - Integrate new systems and equipment into the telecommunications network (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Supersedes and is equivalent to ICTTC060D - Integrate new systems and equipment into the telecommunications networkOutcomes deemed equivalent. Changes to elements, performance criteria and critical evidence. 14/Jun/2010
Is superseded by and equivalent to ICTTEN506 - Integrate new systems and equipment into the telecommunications networkUpdated to meet Standards for Training Packages. 13/Jan/2016

Releases:
ReleaseRelease date
1 1 (this release) 15/Jun/2010

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 031307 Communications Technologies  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 031307 Communications Technologies  15/Jun/2010 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not Applicable

Unit Descriptor

Unit descriptor 

This unit describes the performance outcomes, skills and knowledge required to integrate new telecommunications equipment into an existing installation over a number of phases. It involves procedures to ensure operability of the system while minimising impact on affected customers.

No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement but users should confirm requirements with the relevant federal, state or territory authority.

Application of the Unit

Application of the unit 

Field officers, technicians or technical supervisors from telecommunications carriers, contractors or other service providers apply the skills and knowledge in this unit.

It involves the installation of new, additional and replacement equipment in telecommunications systems and networks, including support and administrative infrastructures.

It particularly applies to integration of new and emerging internet protocol (IP) based technologies.

Licensing/Regulatory Information

Refer to Unit Descriptor

Pre-Requisites

Prerequisite units 

Employability Skills Information

Employability skills 

This unit contains employability skills.

Elements and Performance Criteria Pre-Content

Elements describe the essential outcomes of a unit of competency.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Plan integration strategy

1.1. Determine the nature and scope of the integration activity of the systems  from appropriate personnel 

1.2. Prepare an integration management plan  in agreement with appropriate personnel

1.3. Obtain outage management plan  if available otherwise prepare a contingency plan  to ensure the system integration according to plan

1.4. Identify affected systems, traffic  and customers 

1.5. Notify alarm management centre of action planned and obtain authority to proceed

1.6. Notify customers affected by the outage of time and likely duration

2. Integrate and test new system in the network

2.1. Plan and conduct activities over a set of integration phases in a safe manner and according to the integration management plan

2.2. Load operational software according to specification to ensure interoperability of new and existing system

2.3. Undertake tests  by simulating network traffic and ensure test results are recorded and stored according to enterprise requirements

2.4. Analyse test results and ensure that the parameters established have all been met

2.5. Evaluate problems during testing phase and rectify or escalate procedure

2.6. Analyse alarms  for fault conditions in conjunction with network management centre

2.7. Locate and detect faults within capability or escalate according to enterprise policy

2.8. Check operations administrative maintenance system and alarms are connected according to instruction manual

2.9. Activate new alarms and deactivate old alarms

3. Complete administrative tasks

3.1. Complete integration records according to manufacturer's specification and enterprise policy and make recommendations for improvement for planning

3.2. Notify project completion to appropriate personnel and obtain sign off

Required Skills and Knowledge

REQUIRED SKILLS AND KNOWLEDGE 

This section describes the skills and knowledge required for this unit.

Required skills 

  • analytical skills to interpret test equipment settings and readings
  • communication skills to liaise with customers to ensure requirements are known and can be met within timeframes
  • literacy skills to interpret technical specifications and related documentation
  • numeracy skills to make calculations and necessary calibration changes
  • planning and organisation skills to arrange site access and equipment delivery
  • problem solving skills to account for unexpected faults
  • safety awareness skills to:
  • apply precautions and required action to minimise, control or eliminate hazards that may exist during work activities
  • select and use required personal protective equipment conforming to industry and occupational health and safety (OHS) standards
  • work systematically with required attention to detail without injury to self or others, or damage to goods or equipment
  • technical skills to:
  • load software
  • locate and detect faults
  • simulate network traffic
  • test and diagnose faults in new technologies
  • undertake tests

Required knowledge 

  • connections to carrier infrastructure or customer interface units (CIU)
  • electrical and or optical properties to be measured
  • OHS considerations, including electrical, optical and electromagnetic radiation (EMR) safety
  • telecommunication network equipment and emerging technology networks
  • test equipment types suitable for tests to be made
  • typical performance parameters and faults that may be encountered in network equipment and related connection and transmission media

Evidence Guide

EVIDENCE GUIDE 

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment 

Critical aspects for assessment and evidence required to demonstrate competency in this unit 

Evidence of the ability to:

  • develop a contingency plan
  • implement an integration management plan
  • test systems and equipment and associated features being integrated
  • apply enterprise escalation and outage procedures
  • negotiate procedures and activity on the network and timing of integration
  • integrate new systems and equipment to plan and specifications.

Context of and specific resources for assessment 

Assessment must ensure:

  • a network and equipment for integration
  • equipment and systems manuals, specifications and enterprise policy.

Method of assessment 

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

  • direct observation of the candidate undertaking integration and testing of new systems and equipment
  • review of test results and records completed by the candidate
  • oral or written questioning to assess required knowledge.

Guidance information for assessment 

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:

  • ICTTEN5061A Cut over new and replacement network equipment.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.

Range Statement

RANGE STATEMENT 

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Systems  may include:

  • billing network
  • cabling network
  • computer network
  • control systems
  • network management
  • radio network
  • security network
  • switching
  • transmission
  • wireless access network.

Appropriate personnel  may include:

  • network manager
  • planning manager
  • project consultant
  • project manager
  • vendor contact.

Integration management plan  may include:

  • additional resources
  • deployment strategy in phases
  • integration activities:
  • address interoperability issues
  • install new system and equipment
  • test new system and equipment
  • integration processes
  • risks
  • roles and responsibilities of personnel
  • software tools
  • system outage
  • test hardware
  • vendor input
  • vendor support
  • vendor warranty.

Outage management plan  may include:

  • alternate transmission path
  • contingency plan
  • customers affected
  • emergency communications
  • integration plan
  • outage duration
  • outage times
  • parts of network affected
  • system back up
  • systems affected.

Contingency plan  may include:

  • network operations notified
  • redundancy backup solution
  • system expert on standby
  • vendor on standby.

Traffic  may refer to:

  • call attempts
  • call holding times
  • call volumes
  • circuit occupancy
  • data throughput in bits
  • frames, active sessions
  • packet volumes.

Customers  may include:

  • contractor
  • end users
  • other divisions of the company
  • small, medium or large organisations
  • vendor or supplier
  • wholesale service providers.

Tests  may include:

  • alarms
  • end to end tests
  • performance:
  • bit error rate (BER)
  • data transmission
  • quality of service (QoS)
  • regression
  • system recovery
  • traffic flow simulation:
  • congestion
  • delay
  • packet loss.

Alarms  may include:

  • audible alarms
  • on-screen alerts in computer-based performance monitoring systems
  • visual indicators.

Unit Sector(s)

Unit sector 

Telecommunications

Co-requisite units

Co-requisite units 

Competency field

Competency field 

Telecommunications networks engineering