Modification History
Release 1 - New unit of competency
Unit Descriptor
This unit involves the skills and knowledge required to conduct pre-movement checks on motive power units in accordance with relevant organisational practices, regulations and codes of practice.
It includes conducting pre-start checks, and starting and positioning motive power units in accordance with workplace requirements.
Licensing or certification requirements are not applicable to this unit.
Application of the Unit
This unit applies to people required to carry out these activities as part of a maintenance role within a defined location.
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the required performance needed to demonstrate achievement of the element. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
1 Carry out pre-start checks |
1.1 Allocation of motive power units is checked in conjunction with appropriate personnel 1.2 Motive power unit to be inspected and prepared is located 1.3 Completion of all maintenance activities is confirmed 1.4 Checks for safety controls are conducted in accordance with organisational procedures 1.5 Internal and external integrity checks are conducted in accordance with organisational procedures 1.6 Where required, fluid levels are checked and appropriate action is taken as required |
2 Start motive power unit |
2.1 Motive power unit is started in accordance with manufacturer instructions and/or organisational procedures, and any faults are recognised, diagnosed, reported and recorded in appropriate records for follow-up 2.2 For critical or serious equipment faults that cannot be readily rectified, motive power unit is shut down, faulty equipment is isolated and tagged, and problem is reported for rectification 2.3 All instruments and gauges are observed, readings are interpreted to confirm effective air and electrical operation, and where a problem is indicated action is taken to determine the cause and to rectify or report the situation 2.4 Where required, fluid levels are rechecked after starting and appropriate action is taken as required 2.5 Pre-movement checks are carried out to ensure motive power unit is braking and powering effectively and is safe to move |
3 Complete documentation |
3.1 All required documentation concerning inspecting the motive power unit is completed in accordance with organisational procedures and regulatory requirements 3.2 Logbook and other maintenance records on the motive power unit are completed in accordance with organisational procedures and regulatory requirements |
4 Position motive power unit |
4.1 Authority to move and position motive power unit is obtained and relevant personnel are advised of intention and procedures 4.2 Relevant personnel are made aware that motive power unit is about to be moved in accordance with organisational procedures 4.3 Motive power unit is operated in accordance with standard procedures and regulatory requirements, and within operating and operational constraints 4.4 Motive power unit is positioned in accordance with operational requirements and directions 4.5 Motive power unit performance is monitored during operation to confirm effective operation and/or to identify defects 4.6 Equipment defects are identified, reported, rectified and recorded or relevant personnel are advised for assistance 4.7 Relevant occupational health and safety (OH&S) and regulatory requirements are followed to ensure safety and to prevent injury and damage 4.8 Relevant personnel are advised that the motive power unit is secured in the required position and is ready for service |
Required Skills and Knowledge
This section describes the knowledge and skills required for this unit. |
Required knowledge: |
|
|
|
|
Required skills: |
|
|
|
|
|
|
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package. |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
|
Context of and specific resources for assessment |
|
Method of assessment |
|
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. |
|
Motive power units may include all motive power units in service within Australian rail systems and may include: |
|
Safety controls may include: |
|
Relevant personnel may include: |
|
Unit Sector(s)
Not applicable.
Competency Field
B – Equipment Checking and Maintenance