Unit of competency details

RIICRC316D - Place and compact concrete (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Supersedes and is equivalent to RIICRC316 - Place and compact concrete 13/Nov/2013
Is superseded by and equivalent to RIICRC316E - Place and compact concrete 24/Jan/2021

Releases:
ReleaseRelease date
(View details for release 2) 07/Dec/2014
1 (this release) 14/Nov/2013


Replaced release

You are currently viewing the components related to release 1.
The current release is release 2View release 2 details.

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 030901 Construction Engineering  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 030901 Construction Engineering  02/May/2014 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Unit of competency

Modification History

Not applicable.

Application

This unit describes a participant’s skills and knowledge required to place and compact concrete in Civil Construction.

This unit is appropriate for those working in operational roles.

Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and Industry sectors. Relevant information must be sourced prior to application of the unit.

Unit Sector

Civil construction

Elements and Performance Criteria

1. Plan and prepare to place and compact concrete

1.1 Access, interpret and apply concrete compaction documentation and ensure the work activity is compliant

1.2 Obtain, read, interpret, clarify and confirm work requirements

1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4 Select and wear correct personal protective equipment appropriate for work activities

1.5 Identify, obtain, confirm and implement signage requirements

1.6 Select and check for faults all plant, tools and equipment to carry out tasks

2. Define and prepare work area

2.1 Check location of concrete placement is determined from plans and specifications and location for placement is free of debris and waste

2.2 Maintain safe working area around pour location using barriers and signage

2.3 Locate plant, tools and equipment to suit planned placement

2.4 Undertake pre-pour inspections before concrete arrives on site

3. Place concrete and compact

3.1 Place concrete in horizontal layers into location to levels indicated by markers, level pegs or lines

3.2 Minimise height of vertical drop of concrete to avoid segregation of concrete materials

3.3 Consolidate poured concrete during process using approved compaction or vibration method

3.4 Check finished levels against datum using levelling device

4. Screed/level concrete

4.1 Screed concrete to correct levels and grades using straight edged tool/formwork mounted screed

5. Clean up

5.1 Clear work area and dispose, reuse or recycle materials

5.2 Clean, check, maintain and store plant, tools and equipment

Foundation Skills

Foundation skills essential to performance are explicit in the performance criteria of this unit. Further information is available in the Resources and Infrastructure Industry Training Package Companion Volume.

Unit Mapping Information

RIICRC316A Place and compact concrete

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=88a61002-9a21-4386-aaf8-69c76e675272

 

Assessment requirements

Modification History

Not applicable.

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

  • locates and applies applicable documentation, policies and procedures
  • implements the requirements, procedures and techniques for the safe, effective and efficient placement and compaction of concrete including:
  • accessing, interpreting and applying documentation for placing and compacting concrete
  • identifying and applying relevant specifications to all work activities
  • identifying, addressing and reporting potential hazards and risks
  • identifying, obtaining, confirming and implementing signage requirements
  • selecting and checking for faults all plant, tools and equipment to carry out tasks
  • identifying, addressing and reporting environmental issues
  • works effectively with others to undertake the placement and compaction of concrete that meets all of the required outcomes including:
  • preparing for and organising work activities to meet all task requirements
  • communicating clearly and concisely with others to receive and clarify work instructions
  • using a range of communication techniques and aids to advise others of work activity and exclusion zones
  • monitoring movements and hazards and identifying and communicating changes to the work environment during the work process
  • demonstrates consistent, timely placement and compaction of concrete that safely, effectively and efficiently meet all of the required outcomes on a minimum of three (3) separate occasions including:
  • defining and preparing work, locating plant, tools and equipment to suit planned placement and undertaking pre-pour inspections
  • placing concrete using a minimum of two (2) of the following techniques
  • kibble
  • pumping equipment
  • shovelling
  • tremmies
  • truck placed
  • vibrating
  • wheelbarrows
  • using method/s used to avoid segregation of concrete
  • compacting or vibrating concrete to specifications
  • using techniques to finish concrete
  • screeding concrete to correct levels and grades
  • clearing work area and disposing of, recycling or storing materials
  • cleaning, checking, maintaining and storing plant, tools and equipment

Knowledge Evidence

The candidate must demonstrate knowledge in placing and compacting concrete through:

  • accessing, interpreting and applying the organisation and site requirements and procedures for:
  • identifying and managing risks
  • identifying, addressing and reporting environmental issues
  • setting up work activity
  • site isolation, signage, erecting barriers and traffic control
  • work health and safety
  • managing waste
  • selecting and checking for faults, all tools and equipment to carry out tasks
  • carrying out work to specifications
  • manufacturer’s design specifications
  • applying effective techniques for placing and compacting concrete

Assessment Conditions

  • An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,
  • this unit must be assessed in the context of this sector’s work environment; and,
  • this unit must be assessed using Resources and Infrastructure Industry sector specific policies, procedures, processes and operational manuals; and,
  • an assessor must demonstrate the skills and knowledge of this unit through five (5) years’ work experience in the Industry sector; and,
  • where the assessor does not have current experience a co-assessment or partnership arrangement needs to exist between the qualified assessor and an Industry technical expert/ subject matter expert. The Industry technical expert/subject matter expert must hold the unit being assessed and be currently working in the sector with a minimum of two (2) years’ of current work experience

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=88a61002-9a21-4386-aaf8-69c76e675272