Modification History
Not applicable.
Unit Descriptor
This unit covers the conduct of concrete road curing and texturing operations in the civil construction industry. It includes planning and preparing, setting up and maintaining texture curing and shut down and clean-up operations. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Application of the Unit
This unit is appropriate for those working in an operational role at worksites within:
Civil construction
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Not applicable.
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
1. Plan and prepare for operations |
1.1 Access, interpret and apply compliance documentation relevant to the work activity 1.2 Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task 1.3 Identify, obtain and implement signage requirements from the project traffic management plan 1.4 Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults 1.5 Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task |
2. Setup and maintain the texture and curer machine |
2.1 Set up paver width and settings in accordance with job specification and plans 2.2 Use paving drawings and survey markings to establish work area 2.3 Conduct pre-operational checks including prestart checks according to manufacturer’s instructions 2.4 Check filters and sprays for correct operation 2.5 Adjust stringline sensors within workplace specifications |
3. Operate the texture and curer machine |
3.1 Check for hazards around the texture curing machine 3.2 Make adjustments to sensors and controls while paving 3.3 Use communication systems and hand signals within workplace specifications 3.4 Check spray rates for correct operation 3.5 Check texture rake configuration for correct settings |
4. Shut down and clean up |
4.1 Secure machine with appropriate safety supports 4.2 Check and clean filters and nozzles according to worksite procedures and manufacturers specifications 4.3 Clean work area and dispose of, or recycle, materials in accordance with the project environmental management plan 4.4 Clean, check, maintain and store plant and tools 4.5 Safely park machine |
Required Skills and Knowledge
Required skills |
Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to conduct concrete road curing and texturing operations:
|
Required knowledge |
Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to conduct concrete road curing and texturing operations:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
|
Context of and specific resources for assessment |
|
Method of assessment |
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
|
Guidance information for assessment |
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues. |
Range Statement
Relevant compliance documentation may include: |
|
Safety requirements may include: |
|
Site may include: |
|
Task may include: |
|
Traffic may include: |
|
Plant, tools and equipment may include: |
|
Environmental protection requirements may include: |
|
Unit Sector(s)
Road and Pavements Construction and Maintenance (General)
Custom Content Section
Not applicable.