Modification History
Not applicable.
Unit Descriptor
This unit covers the placing and forming of concrete kerbs, channels and fixtures in the civil construction industry. It includes planning and preparing, setting out and preparing for construction/installation, forming kerb and barrier strips, pouring concrete to installed formwork, finishing kerbs, channels and fixtures, installing pre-cast concrete units, repairing kerb, gutters and median barrier strips, and cleaning up. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and industry sectors. Relevant information must be sourced prior to application of the unit.
Application of the Unit
This unit is appropriate for those working in an operational role at worksites within:
- Civil construction
Licensing/Regulatory Information
Refer to Unit Descriptor.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan and prepare |
1.1. Access, interpret and apply compliance documentation relevant to the work activity 1.2. Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task 1.3. Identify, obtain and implement signage requirements from the project traffic management plan 1.4. Select tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults 1.5. Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task |
2. Set out and prepare for construction/ installation |
2.1. Identify and protect existing services to prevent damage 2.2. Set out location of kerb , channel and /or fixtures to dimensions from drawings and specifications or to pre-set pegs 2.3. Set out driveways and other inverts 2.4. Check grades to ensure correct fall 2.5. Construct formwork and check to ensure compliance with specifications 2.6. Complete services and conduit preparation in accordance with relevant procedures |
3. Form kerb and barrier strips |
3.1. Maintain vertical and horizontal alignment during concrete placement 3.2. Place concrete accurately to string line 3.3. Maintain concrete to specified standard 3.4. Mix and apply mortar at quality and quantity to achieve specified finish |
4. Pour concrete to installed formwork |
4.1. Place and compact concrete into formwork 4.2. Finish surface to alignment specifications 4.3. Remove face formwork without damage to concrete following concrete set |
5. Finish kerbs, channels and fixtures |
5.1. Finish job to shape in accordance with specifications or to the relevant Australian standard 5.2. Finish concrete to specified quality and texture 5.3. Position expansion, construction and dowel joints to specification 5.4. Cure and protect finished work during process |
6. Install pre-cast concrete units |
6.1. Prepare base section and finish to specification for pre-cast unit installation 6.2. Install and join pre-cast concrete units |
7. Repair kerb, gutters and median, barrier strips |
7.1. Identify damaged areas, assess repair requirements and carefully remove or repair damaged section 7.2. Set up formwork or slip form machine and use to replace removed section 7.3. Place concrete accurately to correct alignment using concrete to the specified mix 7.4. Finish concrete to specification matching the shape of the kerb or gutter in place 7.5. Clear, backfill and finish area |
8. Clean up |
8.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan 8.2. Clean, maintain, check and store tools and equipment |
Required Skills and Knowledge
This section describes the skills and knowledge required for this unit. |
Required skills |
Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to replace and form concrete kerb, channels and fixtures:
|
Required knowledge |
Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to replace and form concrete kerb, channels and fixtures:
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
|
Context of and specific resources for assessment |
|
Method of assessment |
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
|
Guidance information for assessment |
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Relevant compliance documentation may include: |
|
Safety requirements may include: |
|
Site locations may include: |
|
Tools may include: |
|
Environmental protection requirements may include: |
|
Kerb , channel and /or fixtures may include: |
|
Drawings may include: |
|
Services and conduits may include: |
|
Materials may include: |
|
Unit Sector(s)
Road and Pavements Construction and Maintenance (General)
Competency field
Refer to Unit Sector(s).
Co-requisite units
Not applicable.