Unit of competency details
RIICCM207D - Spread and compact materials manually (Release 2)
Summary
Companion volumes:
Unit of competency
Assessment requirements
Replaced release
You are currently viewing the components related to release 2.
The current release is release 3.
View release 3 details.
Training packages that include this unit
Qualifications that include this unit
Classifications
Classification history
ASCED Module/Unit of Competency Field of Education Identifier | 030901 | Construction Engineering | 02/May/2014 | |
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form
Unit of competency
Modification History
Release
|
Comment
|
1
|
This unit replaces RIICCM207A Spread and compact materials manually.
|
2
|
Editorial corrections; amended Performance Evidence.
|
Application
This unit describes a participant’s skills and knowledge required to spread and compact materials manually in Civil construction.
This unit is appropriate for those working in operational roles.
Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Unit Sector
Civil construction
Elements and Performance Criteria
1. Plan and prepare for manually spreading and compacting materials
|
1.1 Access, interpret and apply spreading and compacting materials documentation, and ensure the work activity is compliant
1.2 Obtain, read, interpret, clarify and confirm work requirements
1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
1.4 Select and wear personal protective equipment appropriate for work activities
1.5 Identify, obtain and implement traffic signage requirements
1.6 Select, and check for faults, equipment and/or attachments for work activities
1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
|
2. Conduct compaction machine operational checks
|
2.1 Carry out pre-start, start-up and shutdown procedures
2.2 Check machine controls and functions for serviceability, and rectify or report any faults
|
3. Spread and compact materials
|
3.1 Conduct basic field identification test and identify material type
3.2 Direct trucks to required location for loading/dumping
3.3 Direct delivered/relocated materials to correct location
3.4 Check manufactured material for segregation
3.5 Conduct field test to ensure material moisture is suitable
3.6 Direct machine operator to spread materials to specified levels
3.7 Finish materials by hand to specified levels
3.8 Operate mechanical compaction equipment and consolidate materials into layers
3.9 Conduct field test to ensure compaction has been achieved in restricted locations
|
4. Conduct housekeeping activities
|
4.1 Clear work area and dispose of or recycle materials
4.2 Clean and maintain condition of equipment, ensure suitability for use, and address/report issues
4.3 Manage/report hazards, and maintain a safe working environment
4.4 Process written records
|
Foundation Skills
Foundation skills essential to performance are explicit in the performance criteria of this unit. Further information is available in the Resources and Infrastructure Industry Training Package Companion Volume.
Unit Mapping Information
RIICCM207A Spread and compact materials manually
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=88a61002-9a21-4386-aaf8-69c76e675272
Assessment requirements
Modification History
Release
|
Comment
|
1
|
This unit replaces RIICCM207A Spread and compact materials manually.
|
2
|
Editorial corrections; amended Performance Evidence.
|
Performance Evidence
Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:
- locates and applies applicable documentation, policies and procedures
- implements the requirements, procedures and techniques for the safe, effective and efficient completion of the manual spreading and compacting of materials including:
- selecting and using relevant tools/equipment
- carrying out equipment pre-start, start-up and shutdown
- conducting practical field tests for moisture content, shrinkage and compaction
- communicating effectively to direct operators
- works effectively with others to undertake and complete the manual spreading and compacting of materials that meets all of the required outcomes including:
- using a range of communications techniques and equipment to convey information to others
- complying with written and verbal reporting requirements and procedures
- demonstrates consistent timely completion of manual spreading and compacting of materials that safely, effectively and efficiently meets the required outcomes on a minimum of three (3) separate occasions including:
- completing the hand spreading and the mechanical (hand operated) compaction of two (2) different material types to site specification
Knowledge Evidence
The candidate must demonstrate knowledge of the following when spreading and compacting materials manually:
- accessing, interpreting and applying the organisation and site requirements and procedures for:
- using JSAs/JSEA/safe work methods
- achieving project quality outcomes
- identifying and reporting on hazards related to the worksite and work activity
- applying materials handling methods and using safety data sheets
- organising work activities
- using relevant tools and equipment safely
- identifying hand operated mechanical compaction machine types, characteristics, technical capabilities and limitations
- applying basic principles of soil technology for civil works
- identifying basic soil compaction theory including the effects of moisture and mechanical interlock
- identifying site isolation and traffic control responsibilities and authorities
- using civil construction terminology
- completing housekeeping activities
Assessment Conditions
- An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,
- this unit is best assessed in the context of this sector’s work environment;
- where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of this sector’s workplace performance, including environment, task skills, task management skills, contingency management skills and job role environment skills; and,
- this unit must be assessed using Resources and Infrastructure Industry sector specific policies, procedures, processes and operational manuals; and,
- an assessor must demonstrate the skills and knowledge of this unit through five (5) years’ work experience in the Industry sector; and,
- where the assessor does not have current experience a co-assessment or partnership arrangement needs to exist between the qualified assessor and an Industry technical expert/ subject matter expert. The Industry technical expert/subject matter expert must hold the unit being assessed and be currently working in the sector with a minimum of two (2) years’ of current work experience.
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=88a61002-9a21-4386-aaf8-69c76e675272