Modification History
NWP324B Release 2: Layout adjusted. No changes to content.
NWP324B Release 1: Primary release.
Unit Descriptor
This unit of competency describes the outcomes required to inspect and monitor river systems, coordinate river system operations and measure and report on river flows, including flood plains and river environments. The ability to collect data and samples, monitor and adjust regulatory systems, identify and investigate river system problems and to produce technical reports are essential to performance.
Application of the Unit
This unit supports the attainment of skills and knowledge required for field staff with a specific responsibility monitoring and coordinating river regulation operations.
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the required performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1 Inspect and monitor system performance and usage . |
1.1 Schedule routine inspections of rivers or waterways and monitor problem reporting according to organisational and statutory requirements . 1.2 Collect and report on data relating to the condition of the river system and usage according to organisational requirements. 1.3 Monitor the collection and recording of water samples according to organisational procedures and equipment used . 1.4 Monitor water quality according to organisational requirements. |
2 Regulate flows . |
2.1 Inspect flow regulating systems and determine and apply adjustments required to meet demand. 2.2 Regulate river flows according to organisational requirements. |
3 Operate and coordinate processes . |
3.1 Identify, address and report conditions of the river system according to organisational requirements. 3.2 Integrate processes to improve river system performance according to organisational and statutory requirements. 3.3 Receive, analyse and report flood plain data according to organisational requirements. |
4 Complete documentation . |
4.1 Review and action investigation results according to organisational requirements. 4.2 Compile reports from river system data to meet organisational requirements. |
Required Skills and Knowledge
This describes the essential skills and knowledge and their level, required for this unit. |
Required skills :
|
Required knowledge :
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package. |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The candidate should demonstrate the ability to inspect and monitor river systems, coordinate river system operations and measure and report on river flows including:
|
Context of and specific resources for assessment |
Access to the workplace and resources including:
Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required. Assessment processes and techniques must be culturally appropriate, and appropriate to the language and literacy capacity of the candidate and the work being performed. Validity and sufficiency of evidence requires that:
In all cases where practical assessment is used it will be combined with targeted questioning to assess the underpinning knowledge. Questioning will be undertaken in a manner appropriate to the skill levels of the operator, any cultural issues that may affect responses to the questions, and reflecting the requirements of the competency and the work being performed. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts. |
|
Inspection may require: |
|
Organisational and statutory requirements may include: |
|
Equipment used may include: |
|
Flow regulating systems may include: |
|
Unit Sector(s)
Not applicable.
Competency field
Collection and distribution.