Unit of competency details

ICTPMG803 - Undertake a telecommunications project (Release 1)

Summary

Usage recommendation:
Deleted
The Deleted usage recommendation was implemented on 13 June 2017 to describe training components that have no replacement. Enrolments in training components and statements of attainment or qualifications issued before 13 June 2017 are valid. For any components marked as deleted after 13 June 2017, the applicable transition/teach-out periods apply. For specific questions regarding the enrolment, delivery or issuance of a statement of attainment/qualification, please contact your training regulator.
Mapping:
MappingNotesDate
DeletedDeleted from ICT Information and Communications Technology18/Jan/2021
Supersedes and is equivalent to ICTPMG7145B - Undertake a telecommunications projectUpdated to meet Standards for Training Packages New code to reflect change in AQF level13/Jan/2016

Releases:
ReleaseRelease date
1 1 (this release) 14/Jan/2016


Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 080315 Project Management  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 080315 Project Management  24/Jun/2016 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Unit of competency

Modification History

Release 

Comments 

Release 1

This version first released with ICT Information and Communications Technology Training Package Version 2.0.

Application

This unit describes the skills and knowledge required to research and plan a telecommunications project covering an extensive range of complexities and technologies.

It applies to telecommunications technical staff who undertake complex projects requiring high levels of planning and management, and combine technical and work health and safety (WHS) skills in planning and management work.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Unit Sector

Telecommunications – project management

Elements and Performance Criteria

Elements 

Performance Criteria 

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section

1. Prepare for telecommunications project

1.1 Obtain project plan from authorised personnel to identify nature of project and project specifications

1.2 Verify location of proposed project work according to appropriate plans

1.3 Critically analyse project specifications and research emerging telecommunications technology that may benefit project

1.4 Consult authorised personnel to finalise project specifications and obtain agreement

1.5 Source project resources required, including those for safe work practice

1.6 Prepare contingency plans, including any risks that could impact on project

1.7 Develop project implementation plan according to standards with minimal workplace disruption, and obtain agreement from authorised personnel

1.8 Notify authorised personnel of possible network outage where required

2. Carry out telecommunications project work

2.1 Follow work health and safety (WHS) and environmental requirements according to plan and manufacturer’s specifications

2.2 Inform appropriate personnel of existing and potential hazards on worksite

2.3 Perform project work phases according to agreed plan and accepted work practice

2.4 Implement project planning principles, including risks that may impact on project

2.5 Monitor project to completion to ensure that it is progressing according to plan and risks are minimised

2.6 Report on implementation phases

3. Clean up worksite and complete documentation

3.1 Remove and dispose of project waste and debris from worksite according to environmental requirements

3.2 Restore changes made to work area to client’s satisfaction

3.3 Complete all project documents and present to client

3.4 Declare asset ready for commissioning and integration if required

3.5 Notify client and obtain sign off

Foundation Skills

This section describes the Foundation Skills incorporated in the performance criteria that are required for competent performance.

Skill  

Performance Criteria 

Description 

Reading

1.1-1.3, 1.7, 2.1

  • Organises, evaluates and critiques ideas and information from a wide range of complex texts
  • Draws on a broad range of strategies to build and maintain understanding throughout complex texts

Writing

1.4, 1.6-1.8, 2.2, 2.6, 3.3-3.5

  • Demonstrates sophisticated writing skills by selecting appropriate conventions and stylistic devices to express precise meaning
  • Prepares documentation expressing ideas, explores complex issues and is constructed logically, succinctly and accurately

Oral Communication

1.1, 1.2, 1.4, 1.7, 1.8, 2.2, 2.6, 3.2, 3.4, 3.5

  • Determines and confirms client requirements using collaborative and inclusive techniques including active listening and questioning
  • Reads verbal and non-verbal signals to convey and clarify information and to confirm understanding

Numeracy

1.5-1.7

  • Analyses and synthesises highly embedded mathematical information in a broad range of tasks and texts

Navigate the world of work

1.7, 2.1, 3.1

  • Develops and implements strategies that ensure organisational policies, procedures and regulatory requirements are being met

Interact with others

1.1, 1.2, 1.4, 1.8, 2.2, 2.3, 2.5, 3.2-3.5

  • Develops and implements communications strategies with internal and external persons to build rapport
  • Influences and fosters a collaborative culture, facilitating a sense of commitment and workplace cohesion
  • Shares knowledge, information and experience openly as an integral part of the working relationship
  • Understands diversity and seeks to integrate diversity into the work context for managing change, making decisions and achieving shared outcomes

Get the work done

1.1, 1.2, 1.5-1.7, 2.1-2.5, 3.1, 3.2, 3.4

  • Plans strategic priorities and outcomes within a flexible, efficient and effective context in a diverse environment exposed to competing demands
  • Gathers and analyses data and seeks feedback to improve plans and processes
  • Makes high impact decisions in a complex and diverse environment, using input from a range of sources
  • Addresses complex problems involving multiple variables, using formal analytical and lateral thinking techniques, experience and knowledge to focus on the root cause
  • Explores and incubates new and innovative ideas through unconstrained analysis and critical thinking
  • Uses digital technologies to manage business operations

Unit Mapping Information

Code and title  

current version 

Code and title 

previous version 

Comments 

Equivalence status 

ICTPMG803 Undertake a telecommunications project

ICTPMG7145B Undertake a telecommunications project

Updated to meet Standards for Training Packages

New code to reflect change in AQF level

Equivalent unit

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=a53af4e4-b400-484e-b778-71c9e9d6aff2

 

Assessment requirements

Modification History

Release 

Comments 

Release 1

This version first released with ICT Information and Communications Technology Training Package Version 2.0.

Performance Evidence

Evidence of the ability to:

  • research and critically analyse the deliverables for a telecommunications project
  • consult with relevant personnel to elicit and confirm project outcomes
  • prepare plans for implementation, address contingencies and manage risk
  • implement and monitor telecommunications project work and report progress to relevant personnel
  • ensure project is completed in accordance with environmental and client requirements
  • document the project outcomes and obtain client sign off.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

Knowledge Evidence

To complete the unit requirements safely and effectively, the individual must:

  • evaluate organisational project management policies and procedures in relation to project development
  • critically analyse the operation of transmitters and receivers
  • explore the management of safety on projects and setting project policies and procedures for:
  • personal protective equipment conforming to industry and work health and safety (WHS) standards
  • precautions required to minimise, control or eliminate hazards that may exist during work activities
  • evaluate the impact of relevant legislation, codes, regulations and standards on the project
  • explore the telecommunications system principles and operational procedures that contribute to project development, including:
  • personnel involved
  • project specifications
  • project resources
  • evaluate the workplace and industry environment and its impact on development of the project.

Assessment Conditions

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – project management field of work and include access to:

  • a telecommunications operations site on which a project can be carried out
  • computers and relevant computer software
  • relevant legislation, codes, regulations and standards.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=a53af4e4-b400-484e-b778-71c9e9d6aff2