Modification History
Not Applicable
Unit Descriptor
Unit descriptor |
This unit covers the development of conservation works plans featuring erosion control for the protection of rural lands and defines the standard required to: establish client needs; carry out site investigations including surveying; develop a strategy to protect natural areas; establish the purpose and specifications of earthworks; prepare detailed project costing and works plan. |
Application of the Unit
Application of the unit |
This unit is carried out independently in response to requests from land managers facing soil erosion and covers the development of conservation works plans featuring erosion control for the protection of rural lands. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
||
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Not Applicable
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Establish client needs |
1.1. The proposed land use is discussed and confirmed in writing with the landholder. 1.2. The catchment characteristics are reviewed and discussed considering the proposed land use. 1.3. Current impacting legislation and policies are explained to the landholder. 1.4. Possible strategies are discussed with the landholder and the best option confirmed in writing. |
2. Develop the strategy to utilise earthworks |
2.1. Property ownership and boundary are confirmed by checking maps and titles. 2.2. Profile of catchment is determined from survey and aerial photographs. 2.3. Earthworks concept is developed consistent with industry principles and selection criteria. 2.4. Final water disposal points are established in line with proposed strategy. 2.5. Proposed location of structures are tested by survey and discussed with landholder. 2.6. Preferred strategy is documented according to enterprise guidelines. |
3. Prepare a detailed works plan |
3.1. Plan is prepared according to enterprise guidelines and industry best practice. 3.2. Selection criteria applied for earthwork structures or measures align with industry standards. 3.3. Design of relevant structures are communicated with specific details to qualified designer. 3.4. Relevant documentation is prepared and presented, and is consistent with category of work and industry standards. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
|
Required knowledge |
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:
|
Context of and specific resources for assessment |
Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. |
|
Conservation works may include: |
|
Unit Sector(s)
Unit sector |
Soil and water conservation |
Co-requisite units
Co-requisite units |
||
Competency field
Competency field |