Modification History
Not Applicable
Unit Descriptor
Unit Descriptor |
This unit specifies the outcomes required to operate a bridge and gantry crane. It does not cover the types that are controlled from a location remote to a permanent cabin/control station on the crane and that have three or less powered operations, that is hoist/raise and lower is one operation, for licensing purposes. |
Application of the Unit
Application of the Unit |
This unit requires the operator to plan the work, conduct routine checks, transfer loads, and shut down and secure crane. This unit is based on the requirements of the National Standard for Licensing Persons Performing High Risk Work. This unit in its current form meets state and territory licensing requirements. Any alteration will result in a unit which is not acceptable to regulators for the purpose of licensing. |
Licensing/Regulatory Information
Refer to Unit Descriptor
Pre-Requisites
Not Applicable
Employability Skills Information
Employability Skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency |
Performance criteria describe the required performance needed to demonstrate achievement of the element . Where bold italicised text is used , further information is detailed in the required skills and knowledge and /or the range statement . Assessment of performance is to be consistent with the evidence guide . |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan work |
1.1 Potential hazards are identified in the workplace 1.2 Hazard control measures are identified consistent with appropriate standards to ensure the safety of personnel and equipment 1.3 Weight (mass) of the load is estimated in consultation with associated personnel 1.4 Appropriate paths for the movement of loads in the work area are determined 1.5 Crane is appropriate to the load/s 1.6 Appropriate communication methods are identified with associated personnel |
2. Conduct routine checks |
2.1 Appropriate hazard prevention /control measures are applied to the work area according to procedures 2.2 Crane is accessed in a safe manner 2.3 Crane is visually checked for any damage or defects 2.4 All signage and labels are visible and legible according to the appropriate standard 2.5 Routine pre-operational crane checks are carried out according to procedures 2.6 All controls are located and identified 2.7 Crane service logbook is checked for compliance 2.8 Crane is started according to procedures and checked for any abnormal noises 2.9 Crane safety devices are tested according to procedures 2.10 Post-start operational checks are carried out according to procedures 2.11 All communication equipment is checked for serviceability 2.12 All damage and defects are reported and recorded according to procedures , and appropriate action is taken |
3. Transfer loads |
3.1 Hoist block is positioned over load following directions from associated personnel 3.2 Test lift is carried out according to procedures . 3.3 Loads are transferred using all relevant crane movements according to procedures and the appropriate standard 3.4 All required communication signals are interpreted correctly according to procedures and the appropriate standard 3.5 Crane is operated according to procedures 3.6 Load movements are monitored constantly ensuring safety to personnel and load, and structural stability 3.7 Unplanned and /or unsafe situations are responded to in line with procedures |
4. Shut down and secure crane |
4.1 Crane is parked according to procedures 4.2 Crane and equipment are stowed and secured according to procedures and the appropriate standard 4.3 All relevant motion locks and brakes are applied (where applicable) 4.4 Crane is shut down according to procedures . 4.5 Routine post-operational crane checks are carried out according to procedures 4.6 Hazard prevention /control measures are removed (where applicable) 4.7 All damage and defects are reported and recorded according to procedures , and appropriate action is taken |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
|
This describes the essential skills and knowledge and their level required for this unit . |
|
Required skills : |
|
|
|
Required knowledge : |
|
|
Evidence Guide
EVIDENCE GUIDE |
||
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria , required skills and knowledge , the range statement and the assessment guidelines for the Training Package . |
||
Overview of assessment |
|
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
|
|
Context of and specific resources for assessment |
|
|
Method of assessment |
|
|
Guidance information for assessment |
|
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole . It allows for different work environments and situations that may affect performance . Bold italicised wording , if used in the performance criteria , is detailed below . |
|
Hazards |
May include but not limited to:
|
Hazard control measures |
Refers to the systematic process of eliminating or reducing the risk to personnel and property through the application of controls It includes the application of the hierarchy of control, the six-step preference of control measures to manage and control risk: 1 elimination 2 substitution 3 isolation 4 engineering control measures 5 using safe work practices 6 personal protective equipment |
Appropriate standards |
May include but not limited to:
|
Associated personnel |
May include but not limited to:
|
Crane |
May include:
Bridge and gantry:
|
Communication method |
May include but not limited to:
|
Signage and labels |
May include but not limited to:
|
Procedures |
May include but not limited to:
|
Controls |
May include but not limited to:
|
Service logbook |
May include but not limited to:
|
Safety devices |
May include but not limited to:
|
Communication equipment |
May include but not limited to:
|
Hazard prevention /control measures |
May include but not limited to:
|
Test lift means |
The load is lifted just clear of the lifting plane to allow for checks to be safely made in consultation with associated personnel to ensure that:
|
Relevant crane movements |
May include but not limited to:
|
Communication signals |
May include but not limited to:
|
Unplanned and /or unsafe situations |
May include but not limited to:
|
Shut down |
May include but not limited to:
|
Unit Sector(s)
Not Applicable