Unit of competency details

SUGSCT2A - Construct turnouts (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Is superseded by and equivalent to FDFSUG205A - Construct turnoutsTransitioned to FDF10 Training Package 30/Apr/2012

Releases:
ReleaseRelease date
1 1 (this release) 12/Oct/2002

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 040301 Building Science And Technology  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 040301 Building Science And Technology  01/Sep/2002 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not applicable.

Unit Descriptor

Unit descriptor 

This is a Specialist unit. It covers the skills and knowledge required to construct turnouts. It can apply to both construction of new turnouts and repair of existing turnouts.

Application of the Unit

Not applicable.

Licensing/Regulatory Information

Not applicable.

Pre-Requisites

Not applicable.

Employability Skills Information

Not applicable.

Elements and Performance Criteria Pre-Content

Not applicable.

Elements and Performance Criteria

Element 

Performance criteria 

1. Plan and prepare work

1.1 The location and scope of work are identified

1.2 Materials required to complete the work are confirmed and available

1.3 Equipment status is confirmed and pre-operational checks are carried out

1.4 Personal protective equipment is selected, correctly fitted and used

1.5 Safety procedures are followed to confirm that work is clearly signed and relevant authorities are advised that work is in progress

1.6 Site is inspected prior to commencing work to identify and remove potential hazards

2. Construct turnouts

2.1 Sleepers for turnouts are placed in required position for track junctions

2.2 Base plates for switching are fixed to sleepers in specified locations

2.3 Switch rails are positioned and fitted to specification

2.4 Switching gear is installed to specification

3. Complete work

3.1 The construction area is cleared of debris

3.2 Unused materials are stored as required

3.3 Tools, plant and equipment is cleaned and stored as required

3.4 Workplace information is recorded according to workplace recording requirements

Required Skills and Knowledge

Not applicable.

Evidence Guide

Evidence guide 

The assessment process must address all of the following items of evidence.

Ability to :

1. Interpret workplace information such as drawings and related instructions to identify the project requirements

2. Estimate materials required for a given project

3. Assess operational status of equipment and carry out pre-operational checks

4. Construct turnouts to meet design and construction specifications

5. Confirm that switching gear is operational

6. Identify faulty operation of equipment

7. Identify unacceptable work outcomes

8. Take corrective action in response to abnormal or unacceptable performance

9. Use appropriate communication methods and equipment

10. Report and/or record corrective action as required

11. Maintain work area to meet housekeeping standards

Knowledge of :

12. Relevant state OHS legislation, standards and codes of practice relating to work responsibilities

13. Overview of cane transport system

14. Track system layout and characteristics of each section

15. Understanding of the steps involved in laying/repairing track

16. Functions and basic operating principles of equipment

17. The impact of turnout construction on related track laying operations

18. Factors that can affect turnout construction

19. Traffic control signage, communication and procedures

20. Safe work procedures including awareness of health and safety hazards related to track laying and associated control measures. This includes safe manual handling procedures

21. Purpose and limitations of protective clothing and equipment

22. Environmental issues and controls

23. Requirements to liaise/advise related work areas

24. Housekeeping standards for the work area

25. Reporting and recording systems

Relationship with other standards 

Pre -requisite units 

The pre-requisite for this competency standard is:

  • SUGSLRT201A Lay rails.

Co -assessment of related units 

Other units of competency relevant to the work role should be assessed in conjunction with this unit.

Resources required for assessment 

Assessment must occur in a real or simulated workplace where the assessee has access to:

  • Site and related project information
  • Relevant codes of practice and industry standards
  • Turnout construction equipment
  • Materials handling equipment and relevant hand and power tools
  • Operating procedures and related advice on equipment operation
  • Track work
  • Switching gear
  • Personal protective clothing and equipment
  • Communication systems and equipment
  • Housekeeping standards and procedures
  • Workplace information recording systems, requirements and procedures

Assessment requirements 

For information on how to assess this competency standard and who can assess, refer to the Assessment Guidelines for this Training Package.

Range Statement

Range statement 

The range statement indicates the context for demonstrating competence. This statement is a guide and unless otherwise indicated, items may or may not apply as required by the work context.

  • Work is carried out in accordance with company policies and procedures, licensing requirements, legislative requirements, codes of practice and industrial awards and agreements. Codes of practice include the Sugar Milling Operations Industry Code of Practice and sugar industry codes of practice related to cane railway and transport operations
  • Workplace information can include drawings and plans, Standard Operating Procedures (SOPs) and manufacturer's specifications
  • Cane railway network features and their characteristics may include main and branch lines, yards, sidings, loops, dump points and pads; and road transport delivery points (where relevant)
  • Information systems may be print or screen based
  • Equipment and materials may include track laying equipment and related attachments, hand tools, pneumatic tools, base plates, fish plates, clips, dog spikes, anchors, screws, insulating biscuits and camber plates
  • Confirming equipment status involves conducting relevant pre-start checks, confirming that all safety guards and equipment is ready and safe to operate
  • Work may require the ability to work within a team environment
  • Communication methods may include use of two-way radios

Unit Sector(s)