Modification History
Not applicable.
Unit Descriptor
This unit covers draining and/or dewatering of civil construction project sites. It includes: planning and preparing; positioning sedimentation control; remove surface water; constructing sump and wells; removing water from sumps or wells, trenches and pits; and cleaning up.
Application of the Unit
This unit specifies the competency required to drain and/or dewater civil construction project sites for environmental protection purposes and the control of water, which may affect construction. It is appropriate for those working in a operational roles, at worksites within:
- Civil construction
Licensing/Regulatory Information
Refer to Unit Descriptor.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan and prepare |
1.1. Access, interpret and apply compliance documentation relevant to draining and /or dewatering project sites 1.2. Obtain, confirm and apply work instructions relevant to the tasks to the allotted task 1.3. Obtain, confirm and apply safety requirements from the site safety plan and organisational policies and procedures, to the allotted task 1.4. Identify, obtain and implement signage requirements from the project traffic management plan 1.5. Select plant, tools and equipment to carry out tasks that are consistent with the requirements of the job, check them for serviceability and rectify or report any faults 1.6. Identify, confirm and apply environmental protection requirements from the project environmental management plan to the allotted task |
2. Position sedimentation control |
2.1. Position sedimentation controls according to project environmental management plan 2.2. Construct sedimentation control barriers in accordance with the environmental management plan 2.3. Position geo-fabrics and/or woven wire according to specification and to the environmental management plan |
3. Remove surface water |
3.1. Establish temporary drainage systems to drain or divert surface and sub-surface water to the storm water drainage system 3.2. Remove slab and site surface water and/or directed to the temporary drainage system 3.3. Fill surface holes and depressions 3.4. Drain surface water to drainage system using adequate fall |
4. Construct sump/wells |
4.1. Locate sump and/or well at the lowest point to be drained to maximise pump efficiency 4.2. Construct sumps and/or wells to work instructions |
5. Remove water from sumps/wells, trenches and pits |
5.1. Install surface or submersible pumps 5.2. Locate surface pump as close as practicable to the sump or well 5.3. Pump water to temporary drainage system according to the project environmental management plan 5.4. Disperse discharged water using approved procedures |
6. Clean up |
6.1. Clear work area and dispose of or recycle materials in accordance with project environmental management plan 6.2. Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer's recommendations and standard work practices |
Required Skills and Knowledge
This section describes the skills and knowledge required for this unit. |
Required skills |
Specific skills are required to achieve the performance criteria in this unit, particularly for the application in the various circumstances in which this unit may be applied. This includes the ability to carry out the following as required to drain and dewater civil construction site:
|
Required knowledge |
Specific knowledge is required to achieve the Performance Criteria of this unit, particularly its application in a variety of circumstances in which the unit may be used. This includes knowledge of the following, as required to drain and dewater civil construction site:
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
|
Context of and specific resources for assessment |
|
Method of assessment |
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
|
Guidance information for assessment |
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Relevant compliance documentation may include: |
|
Areas to be drained and /or dewatered are to include: |
|
Drainage is to include: |
|
Dewatering techniques are to include: |
|
Project sites include: |
|
Work instructions may include: |
|
Safety requirements may be from the site safety plan and organisational policies and procedures and may include: |
|
Traffic signage and devices are to include: |
|
Traffic signage and devices may include: |
|
Environmental Requirements are to include: |
|
Materials are to include: |
|
Tools and equipment are to include: |
|
Unit Sector(s)
Water Management
Competency field
Refer to Unit Sector(s).
Co-requisite units
Not applicable.