Unit of competency
Modification History
Release 1. This is the first release of this unit of competency in the UET Transmission, Distribution and Rail Sector Training Package. |
Application
This unit covers the work planning, resource requirements and financial control of infrastructure projects being undertaken within the distribution, sub-transmission and transmission, overhead and underground networks. It includes project management activities, which may involve the simultaneous management of many projects, and must encompass at least 20 identifiable tasks. The application of the skills and knowledge described in this unit may require a licence/registration to practice in the workplace subject to regulations for undertaking of electrical work. Other conditions may apply under state and territory legislative and regulatory licencing requirements which must be confirmed prior to commencing this unit. |
Pre-requisite Unit
All competencies in the Common Unit Group must have been completed, plus all competencies in one (1) of the identified Pathway Unit Group(s). Common Unit Group UEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace UEENEEE104A Solve problems in d.c. circuits UEENEEE107A Use drawings, diagrams, schedules, standards, codes and specifications UEENEEG101A Solve problems in electromagnetic devices and related circuits UEENEEG102A Solve problems in low voltage a.c. circuits UETTDREL11 Apply sustainable energy and environmental procedures UETTDREL16 Working safely near live electrical apparatus UETTDRIS62 Implement and monitor the power system organisational WHS/OHS policies, procedures and programs UETTDRIS63 Implement & monitor power system environmental & sustainable energy management policies & procedures Testing Pathway Unit Group UEENEED104A Use engineering applications software on personal computers UEENEEE102A Fabricate, assemble and dismantle utilities industry components UEENEEE124A Compile and produce an energy sector detailed report UEENEEE125A Provide engineering solutions for problems in complex multiple path circuits UEENEEE126A Provide solutions to basic engineering computational problems UEENEEG149A Provide engineering solutions to problems in complex polyphase power circuits UETTDRTS21 Maintain interdependent network protection and control systems UETTDRTS22 Commission interdependent network protection and control systems UETTDRTS29 Develop power systems secondary isolation instructional documents UETTDRTS35 Maintain complex network protection and control systems Design Pathway Unit Group UETTDRDS39 Prepare and manage detailed construction plans for electrical power system infrastructure |
Competency Field
Design |
Unit Sector
Not applicable. |
Elements and Performance Criteria
ELEMENTS |
PERFORMANCE CRITERIA |
||
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to demonstrate achievement of the element. |
||
1 |
Plan for and coordinate the management of electrical infrastructure projects |
1.1 |
Work health and safety (WHS)/occupational health and safety (OHS) practices/procedures and environmental and sustainable energy procedures, which may influence the management of electrical infrastructure projects, are reviewed and determined |
1.2 |
Purpose of the electrical infrastructure project is established and expected outcomes of the work are confirmed with appropriate personnel |
||
1.3 |
Organisational established procedures on policies and specifications for the electrical infrastructure project are obtained or established with appropriate personnel |
||
1.4 |
Equipment/tools and personal protective equipment (PPE) are selected and coordinated based on specified requirements and established procedures |
||
1.5 |
Work is prioritised and sequenced for the most efficient and effective outcome following consultation with others for completion within acceptable timeframes, to a quality standard and in accordance with established procedures |
||
1.6 |
Risk control measures are identified, prioritised and evaluated against the work schedule |
||
1.7 |
Relevant work permits are secured to coordinate the performance of work according to requirements and/or established procedures |
||
1.8 |
Resources, including personnel, equipment, tools and PPE, required for the job are identified, scheduled and coordinated and confirmed safe and in technical working order |
||
1.9 |
Liaison and communication issues with others/authorised personnel, authorities, clients and land owners are resolved and activities coordinated to carry out work |
||
1.10 |
Site is prepared according to the work schedule and to minimise risk and damage to property, commerce and individuals in accordance with established procedures |
||
1.11 |
Personnel participating in the work, including plant operators and contractors, are fully briefed and respective responsibilities coordinated and authorised where applicable in accordance with established procedures |
||
1.12 |
Positioning of road signs, barriers and warning devices is planned in accordance with requirements |
||
2 |
Carry out and coordinate the management of electrical infrastructure projects |
2.1 |
WHS/OHS and sustainable energy principles, functionality and practices to reduce the incidence of accidents and minimise waste are incorporated into the project in accordance with requirements and/or established procedures |
2.2 |
System design decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures |
||
2.3 |
Mathematical models of relevant networks are used to analyse the effectiveness of the finished project in accordance with requirements and established procedures |
||
2.4 |
Technical advice is given to potential hazards, safety risks and control measures so that monitoring and preventative action can be undertaken and/or appropriate authorities consulted, where necessary, in accordance with requirements and established procedures |
||
2.5 |
Essential knowledge and associated skills are applied to analyse specific data and compare it with compliance specifications to ensure completion of the project within an agreed timeframe according to requirements |
||
2.6 |
Solutions to non-routine problems are identified and actioned using acquired essential knowledge and associated skills according to requirements |
||
2.7 |
Quality of work is monitored against personal performance agreement and/or established organisational and professional standards |
||
2.8 |
Electrical infrastructure decisions are made on the basis of safety and effective outcomes according to requirements and/or established procedures |
||
2.9 |
Work teams/groups are arranged/coordinated/evaluated to ensure planned goals are met according to established procedures |
||
3 |
Complete and coordinate the management of electrical infrastructure projects |
3.1 |
Final inspections of the infrastructure are undertaken to ensure they comply with all requirements and include all specifications and documentations needed to complete the design brief |
3.2 |
Appropriate personnel are notified of completion and reports and/or completion documents are finalised |
||
3.3 |
Reports and/or completion documents are submitted to relevant personnel/organisations for approval and, where applicable, statutory or regulatory approval |
||
3.4 |
Approved copies of project documents are issued and records are updated in accordance with established procedures |
Foundation Skills
Foundation skills essential to performance are explicit in the performance criteria of this unit of competency. |
Range of Conditions
Range is restricted to essential operating conditions and any other variables essential to the work environment. Non-essential conditions may be found in the Companion Volume Implementation Guide. |
Unit Mapping Information
This unit replaces and is equivalent to UETTDRDS41A Manage electrical power systems infrastructure projects. |