Modification History
Release |
Action |
Core/Elective |
Details |
Points |
2 |
Update |
Group A |
Correct unit Title TAEDEL301A Provide work skill instruction |
40 |
3 |
Edit |
Core |
Correct weighting points of UEPOPS342B – Interpret and analyse single operation protection devices |
60 |
Description
Scope: Those gaining this qualification will be able to complete work function such as remote operation of network equipment and isolation of plant and equipment for work, coordination of work activities, cost estimations, observation of safe working practices and environmental procedures. Supervision of others and coordination of work activities of individuals and/or team. |
Pathways Information
Not applicable.
Licensing/Regulatory Information
Not applicable.
Entry Requirements
Not applicable.
Employability Skills Summary
Not applicable.
Packaging Rules
Completion requirements: The requirements for granting this qualification will be met when competency is demonstrated and achieved for:
|
||
Core Competency Standard Units All core competency standard units to be achieved |
Weighting Points |
|
UEENEEE117A |
Implement and monitor energy sector OHS policies and procedures |
20 |
UEENEEE101A |
Apply Occupational Health and Safety regulations, codes and practices in the workplace |
20 |
UEPOPS202B |
Apply Quality Systems to Work |
20 |
UEPOPS301B |
Conduct Single Energy Source Isolation Procedures for Permit to Work |
40 |
UEPOPS337B |
Maintain Quality Systems within the Team |
20 |
UEPOPS342B |
Interpret and Analyse Single Operation Protection Devices |
60 |
UEPOPS347B |
Operate and Monitor Supervisory, Control and Data Acquisition Systems |
40 |
UEPOPS369A |
Respond to a critical incident |
40 |
UEPOPS417B |
Monitor and Implement Environmental Plans and Procedures |
20 |
UEPOPS420B |
Coordinate the Network System |
40 |
UEPOPS423B |
Plan a Scheduled Outage |
40 |
UEPOPS426B |
Interpret and Analyse Multi-Operation Protection Devices |
40 |
UEPOPS428B |
Develop H.V Switching Programs |
40 |
UEPOPS439B |
Plan and Organise Work |
30 |
UEPOPS440B |
Coordinate Team Activities |
30 |
Total points in core |
500 |
Elective Competency Standard Units Complete Elective units to achieve a total of weighting of 780 points from the following groups: |
|||
Group |
Minimum points |
Maximum points |
|
A |
Imported and Common Elective Units Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 4. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points. |
0 |
220 |
B |
Qualification Elective Units You may select units from this group for qualification completion. |
0 |
700 |
C |
Qualification Elective Units You may select all your elective units from this Group |
100 |
780 |
Group A - Imported and Common Elective Units. Complete units to a maximum weighting of 220 points |
Weighting Points |
|
BSBCUS401B |
Coordinate implementation of customer service strategies |
40 |
BSBINM401A |
Implement workplace information system |
40 |
BSBINN301A |
Promote Innovation in a team environment |
40 |
BSBLED401A |
Develop teams and individuals |
40 |
BSBMGT402A |
Implement operational plan |
40 |
BSBMGT403A |
Implement continuous improvement |
40 |
BSBWOR401A |
Establish effective workplace relationships |
50 |
BSBWOR402A |
Promote team effectiveness |
50 |
BSBWOR404B |
Develop Work Priorities |
40 |
MEM05004C |
Perform routine oxy acetylene welding |
20 |
MEM05007C |
Perform manual heating and thermal cutting |
20 |
MEM05012C |
Perform routine manual metal arc welding |
20 |
TAEDEL301A |
Provide work skill instruction |
40 |
UEENEEC005B |
Estimate electrotechnology projects |
40 |
UEENEEE124A |
Compile and produce an energy sector detailed report |
60 |
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 4. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points. Note: For further information see Application of the NQC Flexibility Formula, Page 10, UEP12 ESI Generation Sector Training Package, Part1.1.00 |
Up to 220 points |
Group B Qualification Electives. Complete units to a maximum weighting of 700 points |
Weighting Points |
|
UEPOPS203B |
Operate and Monitor Communications Systems |
20 |
UEPOPS252A |
Undertake Local Systems Operations |
30 |
UEPOPS304B |
Make and Spread a Stockpile |
40 |
UEPOPS305B |
Operate & Monitor Briquette Coal Cooling Plant |
40 |
UEPOPS306B |
Operate & Monitor Briquette Coal Drying Plant |
40 |
UEPOPS307B |
Operate & Monitor Briquette Coal Press Plant |
40 |
UEPOPS308B |
Perform Briquette Laboratory Tests |
40 |
UEPOPS309B |
Operate and Monitor Air Conditioning Equipment and Ventilation Systems |
20 |
UEPOPS310B |
Operate Bulk Coal Handling Plant |
40 |
UEPOPS311B |
Operate Fabric Filter Dust Collection Plant |
20 |
UEPOPS312B |
Operate and Monitor Fuel Supply |
20 |
UEPOPS313B |
Operate and Monitor Boiler Draught System |
40 |
UEPOPS314B |
Operate and Monitor Fuel Firing Plant (Gas or Oil) |
40 |
UEPOPS315B |
Operate and Monitor Fuel Firing Plant (Coal) |
40 |
UEPOPS316B |
Operate and Monitor Boiler Steam/Water Cycle |
40 |
UEPOPS317B |
Operate and Monitor Fixed Fire Protection Systems |
30 |
UEPOPS318B |
Operate and Monitor Compressed Gas Systems |
30 |
UEPOPS319B |
Operate and Monitor Gas Production Plant |
30 |
UEPOPS320B |
Operate and Monitor Compressed Air Systems |
30 |
UEPOPS321B |
Operate and Monitor Water Treatment Plant |
30 |
UEPOPS322B |
Operate and Monitor Alkalinity Reduction Plant |
30 |
UEPOPS323B |
Operate and Monitor Reverse Osmosis Plant |
30 |
UEPOPS324B |
Operate and Monitor Brine Concentrator Plant |
30 |
UEPOPS325B |
Operate and Monitor Water Quality Control Systems |
30 |
UEPOPS326B |
Operate and Monitor Oil Systems |
30 |
UEPOPS327B |
Monitor and Maintain Civil Assets |
30 |
UEPOPS328B |
Undertake Dam Safety Surveillance |
30 |
UEPOPS329B |
Operate and Monitor Auxiliary Steam Systems |
40 |
UEPOPS330B |
Operate and Monitor Heat Exchangers |
40 |
UEPOPS331B |
Operate and Monitor Water Systems (Condensate & Feedwater) |
40 |
UEPOPS332B |
Operate and Monitor Condensing and Cooling Water System |
40 |
UEPOPS333B |
Operate and Monitor H.R.S.G. Hot Gas Control System |
40 |
UEPOPS334B |
Operate and Monitor a Wind Generator |
60 |
UEPOPS335B |
Operate A Hydro Generator/Synchronous Condenser / Pump Unit |
60 |
UEPOPS336B |
Manage Operate and Monitor a Gas Turbine Unit |
60 |
UEPOPS338B |
Facilitate Effective Workplace Communication |
20 |
UEPOPS339B |
Operate and Monitor a Boiler Unit |
60 |
UEPOPS340B |
Operate and Monitor a Steam Turbine |
60 |
UEPOPS343B |
Operate Hydro-Electric Generating Plant and Auxiliary Equipment |
60 |
UEPOPS344B |
Conduct Water Conveyance and Control |
30 |
UEPOPS345B |
Implement Dam Safety Surveillance Procedures |
30 |
UEPOPS346B |
Conduct Non-Routine Operational Testing |
60 |
UEPOPS349B |
Operate H.V. Primary Switchgear |
40 |
UEPOPS351B |
Operate H.V. Condition Changing Apparatus |
60 |
UEPOPS352B |
Conduct Operational Checks on In-Service Mechanical Plant |
40 |
UEPOPS354B |
Operate and Monitor Dual Fuel-Firing Plant |
80 |
UEPOPS355B |
Monitor the Implementation of Under Frequency Load Shedding |
60 |
UEPOPS356B |
Apply Environmental and Sustainable Energy Procedures |
20 |
UEPOPS357B |
Operate H.V. Secondary Switchgear |
40 |
UEPOPS358A |
Monitor and Maintain Wind Farm Civil Assets |
40 |
UEPOPS359A |
Monitor Climatic Conditions for Renewable Energy Production |
40 |
UEPOPS360A |
Operate and Monitor a Hydro Turbine |
60 |
UEPOPS361A |
Operate and Monitor Hydro Plant Auxiliary Systems |
60 |
UEPOPS362A |
Operate and Monitor Generator/Alternator |
60 |
UEPOPS364A |
Ensure Compliance with Occupational Health and Safety policy and procedures |
20 |
UEPOPS368A |
Operate manual systems |
30 |
UEPOPS370A |
Facilitate the use of contingency plans |
60 |
UEPOPS371A |
Carry out operational checks on in-service electrical plant |
40 |
Group C Qualification Electives. At least 100 points to be achieved from this group. You may select all your elective units from this Group |
Weighting Points |
|
UEPOPS402B |
Conduct Multiple Energy Source Isolation Procedures for Permit to Work |
40 |
UEPOPS403B |
Coordinate Permit to Work System |
40 |
UEPOPS404B |
Coordinate First Response Team Operation |
20 |
UEPOPS405B |
Operate and Monitor AC Electrical Systems |
30 |
UEPOPS406B |
Operate and Monitor DC Electrical Systems |
30 |
UEPOPS407B |
Start and Run Up A Gas Turbine |
60 |
UEPOPS408B |
Shut Down a Gas Turbine |
60 |
UEPOPS409B |
Start-Up A Boiler Unit |
60 |
UEPOPS410B |
Shut Down A Boiler Unit |
60 |
UEPOPS411B |
Run Up A Steam Turbine |
60 |
UEPOPS412B |
Undertake Operations Commissioning / Decommissioning |
30 |
UEPOPS413B |
Coordinate Operational Strategies for Power Production |
20 |
UEPOPS414B |
Perform Risk Analysis of Generation Plant |
20 |
UEPOPS416B |
Monitor the Implementation of the Enterprise’s Production / Maintenance Quality Control procedures |
20 |
UEPOPS419B |
Shut down a steam turbine |
60 |
UEPOPS422B |
Schedule Generation |
40 |
UEPOPS424B |
Coordinate Local H.V. Networks |
40 |
UEPOPS425B |
Produce Maintenance Plans For Generation Production Plant |
40 |
UEPOPS430B |
Control Permit to Work Operations |
40 |
UEPOPS431B |
Collect and Analyse Hydrological and Meteorological Data |
20 |
UEPOPS432B |
Start up a Heat Recovery Steam Generator Unit |
30 |
UEPOPS433B |
Operate and Monitor a Heat Recovery Steam Generator Unit |
20 |
UEPOPS434B |
Shutdown an Heat Recovery Steam Generator Unit |
30 |
UEPOPS435B |
Operate and Monitor Flue Gas NOx Mitigation Systems |
30 |
UEPOPS437B |
Manage System Re-Start |
40 |
UEPOPS441B |
Operate and Monitor System Equipment |
30 |
UEPOPS442B |
Monitor and Co-ordinate the Operation of a Combined Cycle Gas Turbine Unit |
60 |
UEPOPS443A |
Coordinate Wind Farm Operations |
40 |
UEPOPS444A |
Start and Run-up a Hydro Turbine |
60 |
UEPOPS445A |
Shut Down a Hydro Turbine |
60 |
UEPOPS446A |
Operate and monitor hydro unit control and protection systems |
80 |
UEPOPS447A |
Coordinate photovoltaic solar power plant operations |
60 |
UEPOPS450A |
Coordinate effective workplace communication |
40 |
UEPOPS451A |
Coordinate the use of contingency plans |
40 |
UEPOPS452A |
Conduct operational checks and carry out corrective action on in-service electrical plant |
40 |
UEPOPS454A |
Coordinate response to critical incidents |
30 |
UEPOPS456A |
Perform switching to a switching program |
30 |
UEPOPS457A |
Control electrical energy production |
40 |
Note:
1. Prerequisite pathways shall be identified and met for all elective units selected.
2. In selecting elective units considerations to career planning advice should be given to units that form part of a prerequisite pathway for the progression to achieve particular competencies or qualification at a higher level.
END OF QUALIFICATION
Custom Content Section
Not applicable.