Skill set details

UEESS00217 - Wind Energy Systems Designer-Installer Skill Set (Release 1)

Summary

Usage recommendation:
Current
Release Status:
Current
Releases:
ReleaseRelease date
1 1 (this release) 20/Dec/2022

Units of competency

CodeSort Table listing units of competency by the Code columnTitleSort Table listing units of competency by the Title columnUsage RecommendationSort Table listing units of competency by the Usage Recommendation columnEssentialSort Table listing units of competency by the Essential column
UEERE0055 - Conduct site survey for off-grid photovoltaic/generating set systemsConduct site survey for off-grid photovoltaic/generating set systemsCurrentCore
UEERE0065 - Design wind energy systemsDesign wind energy systemsCurrentCore
UEERE0076 - Install and maintain wind energy systems to power conversion equipmentInstall and maintain wind energy systems to power conversion equipmentCurrentCore
UEERE0079 - Install off-grid power conversion equipment to electrical installationInstall off-grid power conversion equipment to electrical installationCurrentCore
RIIWHS204E - Work safely at heightsWork safely at heightsCurrentCore
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 5 of 5
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Release 1: This is the first release of this Skill Set in the UEE Electrotechnology Training Package.

Description

This Skill Set is for persons who are required to design and install wind energy systems.

Pathways Information

The units of competency in this Skill Set can contribute to the completion of relevant Certificate III, Certificate IV, Diploma and Advanced Diploma qualifications from the UEE Electrotechnology Training Package.

Licensing/Regulatory Information

It is essential that persons undertaking this Skill Set already hold a current unrestricted electrical licence issued in an Australian state or territory.

Skill Set Requirements

A total of 5 units of competency  must be attained.

There are units of competency within this Skill Set that contain pre-requisites. Units of competency that have a pre-requisite requirement are identified by this symbol *. Refer directly to the units of competency to identify pre-requisite requirements to ensure all are complied with. A list of all pre-requisites is also provided in the UEE Pre-requisite Companion Volume.

RIIWHS204E

Work safely at heights

UEERE0055

Conduct site survey for off-grid photovoltaic/generating set systems

UEERE0065

Design wind energy systems *

UEERE0076

Install and maintain wind energy systems to power conversion equipment *

UEERE0079

Install off-grid power conversion equipment to electrical installation *

Target Group

This Skill Set is intended for persons who are required to design and install wind energy systems.

Suggested words for Statement of Attainment

This Skill Set from the UEE Electrotechnology Training Package meets the industry requirements for a designer and installer of wind energy systems.