Unit Descriptor
Unit Descriptor |
1 ) 1 .1 ) Descriptor |
This unit covers maintaining the effective and efficient operation of refrigeration equipment using non phase changing secondary refrigerant systems. It reinforces safe working practice, utilises service manuals, encompasses applying specialised knowledge of refrigeration principles to test and perform maintenance operations to these systems and to locate defective components and repair faults, completing reports on service and performance outcomes. |
Application of the Unit
Application of the Unit |
4 ) |
This competency standard is suitable for employment-based programs under an approved contract of training at the AQF level of the qualification in which the unit is first packaged or higher. The unit may be selected as an elective from the relevant schedule (see qualification packaging rules) provided that all prerequisite units are undertaken or addressed through recognition processes. This unit may be included in a skill set provided that it is listed in the schedule of electives (see Qualification Framework) and all prerequisite units are undertaken or addressed through recognition processes. Delivery and assessment of this unit should be undertaken within regard to the requirements of License to Practice (1.2 above), Prerequisite Competencies and Literacy and Numeracy skills (2 above) and the recommendations for concurrent assessment and relationship with other units (9.5 below). Practice in the workplace and during training is also subject to regulations directly related to occupational health and safety and where applicable contracts of training such as apprenticeships. Note: |
Licensing/Regulatory Information
1 .2 ) License to practice |
The skills and knowledge described in this unit may, in some jurisdictions, require a licence to practise in the workplace subject to regulations for undertaking refrigeration and air conditioning work. Practice in workplace and during training is also subject to regulations directly related to occupational health and safety and where applicable contracts of training such as apprenticeships. Note. |
Pre-Requisites
Prerequisite Unit (s ) |
2 ) |
|
2 .1 ) Competencies |
||
Granting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed. |
||
UEENEEJ111A |
Diagnose and rectify faults in air conditioning and refrigeration systems and components |
|
UEENEEJ113A |
Commission air conditioning and refrigeration systems |
|
UEENEEE101A |
Apply Occupational Health and Safety regulations, codes and practices in the workplace |
|
UEENEEE102A |
Fabricate, assemble and dismantle utilities industry components |
|
UEENEEE103A |
Solve problems in ELV single path circuits |
|
UEENEEE105A |
Fix and secure electrotechnology equipment |
|
UEENEEE107A |
Use drawings, diagrams, schedules, standards, codes and specifications |
|
UEENEEE137A |
Document and apply measures to control OHS risks associated with electrotechnology work |
|
UEENEEJ102A |
Prepare and connect refrigerant tubing and fittings |
|
UEENEEJ103A |
Establish the basic operating conditions of vapour compression systems |
|
UEENEEJ104A |
Establish the basic operating conditions of air conditioning systems |
|
UEENEEJ106A |
Install refrigerant pipe work, flow controls and accessories |
|
UEENEEJ107A |
Install air conditioning and refrigeration systems, major components and associated equipment |
|
UEENEEJ108A |
Recover, pressure test, evacuate, charge and leak test refrigerants |
|
UEENEEJ110A |
Select refrigerant piping, accessories and associated controls |
|
UEENEEJ153A |
Find and rectify faults motors and associated controls in refrigeration and air conditioning systems |
|
UEENEEJ170A |
Diagnose and rectify faults in air conditioning and refrigeration control systems |
|
UEENEEJ194A |
Solve problems in low voltage refrigeration circuits |
|
UEENEEP012A |
Disconnect / reconnect composite appliances connected to low voltage installation wiring |
|
UEENEEP017A |
Locate and rectify faults in low voltage composite appliances using set procedures |
|
Note: UEENEEJ111A and UEENEEJ113A - Those holding a 'Certificate III in Refrigeration and Air Conditioning trade qualification or equivalent" meet the requirements of these units and their pre-requisite requirements. |
Employability Skills Information
Employability Skills |
3 ) This unit contains Employability Skills The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. |
Elements and Performance Criteria Pre-Content
6 ) Elements describe the essential outcomes of a unit of competency |
Performance criteria describe the required performance needed to demonstrate achievement of the Element. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
||
1 |
Prepare to service and repair secondary refrigeration systems. |
1.1 |
The type of secondary refrigeration system, components and operation are understood. |
1.2 |
OHS procedures are identified, MSDS are obtained and understood, risk control measures are followed, PPE worn. |
||
1.3 |
Safety hazards that have not previously been identified are documented and risk control measures devised and implemented. |
||
1.4 |
The extent of faults is determined from reports, other documentation, observation and from discussion with appropriate personnel. |
||
1.5 |
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site. |
||
1.6 |
Tools, equipment and testing devices needed to carry out the work are obtained in accordance with established procedures and checked for correct operation and safety |
||
2 |
Carry out maintenance requirements |
2.1 |
OHS requirements, regulation, workplace procedures and risk control measures and are followed. |
2.2 |
Components are checked as being isolated, where necessary, in strict accordance OHS requirements and procedures. |
||
2.3 |
Maintenance tests are performed on the primary cooling source, operating pressures, operating current, refrigerant charge, secondary flow rates, condenser cooling system, document results including any systems faults or non compliance to operational specifications. |
||
2.4 |
Perform operational maintenance tests on the secondary refrigerant pumping / circulation devices, recording pressure and flow rates, document results, including faults or non compliance to system specification. |
||
2.5 |
Use test kit and follow approved OH&S procedure including PPE, check the chemical integrity (dilution rate, anti bacterial and anti corrosion rates) of the secondary refrigerant, document result or any non compliance. |
||
2.6 |
Secondary refrigerant pipework checked for leaks, insulation checked for soundness and pipework stability. |
||
2.7 |
System components evaporators, blowers, other heat exchangers, heat recovery or defrost systems are checked for correct operation and cleanliness. |
||
2.8 |
Test the control system operation, including safety controls, follow all OH&S guidelines, document results including any faults or non conformity to system specification. |
||
3 |
Repair secondary refrigeration systems. |
3.1 |
OHS work completion risk control measures and procedures are followed. |
3.2 |
Work site is cleaned and made safe in accordance with established procedures. |
||
3.3 |
Justification for solutions used to solve machine problems is documented. |
||
3.4 |
Work completion is documented and an appropriate person or persons notified in accordance with established procedures. |
||
3.5 |
Perform any required repairs to systems components to achieve compliance to design operation and manufactures recommendation for effective operation. |
||
3.6 |
Adjust control system as required to achieve compliance to design operation and manufactures recommendation, for effective operation. |
||
3.7 |
Record flows, pressures and temperatures obtained before and after repair and compare to specifications, implementing contingency measures where required, to ensure compliance to design operation and manufactures recommendation for effective operation. |
||
4 |
Complete reports on maintenance and repair activities |
4.1 |
Work completed safely, compliance is maintained with OH&S risk control measures. |
4.2 |
Work area is cleaned and made safe in accordance with established workplace procedures and practices. |
||
4.3 |
Report is written for service / maintenance and repair activities on secondary refrigeration system, non compliance after repair is reported to appropriate person. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
|
7) This describes the essential skills and knowledge and their level, required for this unit. |
|
Evidence shall show that knowledge has been acquired of safe working practices and solving problems in single and three phase low voltage machines. All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies. |
|
KS01-EJ182A |
Service and repair secondary refrigeration systems |
Evidence shall show an understanding the secondary refrigeration systems, components, maintenance service and repair, applying safe working practices and relevant Standards, Codes and Regulations to an extent indicated by the following aspects: |
|
T1 Secondary refrigeration systems
|
|
T2 Service and repair secondary refrigeration systems
|
|
T3 Maintenance procedures for secondary refrigeration systems
|
Evidence Guide
EVIDENCE GUIDE |
|||
9 ) The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package. The Evidence Guide forms an integral part of this unit. It must be used in conjunction with all parts of this unit and performed in accordance with the Assessment Guidelines of this Training Package. |
|||
Overview of Assessment |
9 .1 ) Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the Industry's preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. It is recognised that, in some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accordance with industry and regulatory policy. Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed. The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Sources of evidence need to be 'rich' in nature to minimise error in judgment. Activities associated with normal every day work have a bearing on the decision as to how much and how detailed the data gathered will contribute to its 'richness'. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package. |
||
Critical aspects of evidence required to demonstrate competency in this unit |
9 .2 ) Before the critical aspects of evidence are considered all prerequisites shall be met. |
||
Evidence for competence in this unit shall be considered holistically. Each element and associated performance criteria shall be demonstrated on at least two occasions in accordance with the 'Assessment Guidelines - UEE07'. Evidence shall also comprise:
|
|||
|
|||
|
|||
Service and repair secondary refrigeration systems as described in 8) and including: |
|||
A |
Applying logical diagnostic methods |
||
B |
Using fault scenarios to test the cause of system faults |
||
C |
Identifying faults and competency needed to rectify them |
||
D |
Rectifying faults in system controls |
||
E |
Verifying that the system operates correctly |
||
F |
Dealing with unplanned events by drawing on essential knowledge and skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items |
||
Context of and specific resources for assessment |
9 .3 ) This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
These should be part of the formal learning/assessment environment. Note: Where simulation is considered a suitable strategy for assessment, conditions must be authentic and as far as possible reproduce and replicate the workplace and be consistent with the approved industry simulation policy. |
||
Evidence should show demonstrated competency in Service and repair secondary refrigeration systems. |
|||
Method of assessment |
9 .4 ) This unit shall be assessed by methods given in Volume 1, Part 3 'Assessment Guidelines'. Note: Competent performance with inherent safe working practices is expected in the industry to which this unit applies. This requires assessment in a structured environment which is primarily intended for learning/assessment and incorporates all necessary equipment and facilities for learners to develop and demonstrate the essential knowledge and skills described in this unit. |
||
Concurrent assessment and relationship with other units |
9 .5 ) |
||
There are no concurrent assessment recommendations for this unit. |
|||
The critical aspects of occupational health and safety covered in unit UEENEEE001B and other discipline specific occupational health and safety units shall be incorporated in relation to this unit.. |
Range Statement
RANGE STATEMENT |
8 ) This relates to the unit as a whole providing the range of contexts and conditions to which the performance criteria apply. It allows for different work environments and situations that will affect performance. |
This unit must be demonstrated in relation to service and repair including all of the following secondary refrigeration systems , incorporating major components, primary chillers and circuits, secondary piping circuits, pumps, defrost systems, heat recovery systems, control systems and other associated secondary refrigeration components |
This unit must be demonstrated in relation to service and repair in the following secondary refrigeration systems and components:
All of the following apparatus:
All of the following systems
|
Generic terms used throughout this Vocational Standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms that apply are given in Volume 2, Part 2.1. |
Unit Sector(s)
Not Applicable
Competency Field
2 .2 ) Literacy and numeracy skills Participants are best equipped to achieve competency in this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 'Literacy and Numeracy' |
|||||
Reading |
4 |
Writing |
4 |
Numeracy |
4 |
Custom Content Section
Competency Field |
5 ) |
Refrigeration and Air Conditioning |