Modification History
Not Applicable
Unit Descriptor
Unit Descriptor |
1 ) 1 .1 ) Descriptor |
This unit covers the assembly, installation and starting up and de-commissioning of single head split air conditioning systems andsplit water heating heat pump systems up to a maximum of 18kWr refrigeration capacity. It encompasses working safely and to standards, following routine procedures to install equipment, connecting pipe work, pressure testing, evacuating, perform functional checks and complete installation / regulatory documentation. Note: The Ozone Protection and Synthetic Greenhouse Gas Legislation Amendment Bill 2003 may apply to this unit. Prior to planning the delivery of any training and/or assessment activities all legislative and regulatory requirements shall be identified and included. |
Application of the Unit
Application of the Unit |
4 ) |
This unit is intended for competency development entry-level employment-based programs incorporated in approved contracts of training. It may also be used to augment previously acquired competencies. |
Licensing/Regulatory Information
1 .2 ) License to practice |
The skills and knowledge described in this unit may, in some jurisdictions, require a license to practice in the workplace subject to regulations for undertaking refrigeration and air conditioning work. Practice in workplace and during training is also subject to regulations directly related to occupational health and safety and where applicable contracts of training such as apprenticeships. Note: 2. Compliance with permits may be required in various jurisdictions and typically relates to the operation of plant, machinery and equipment such as elevating work platforms, powder operated fixing tools, power operated tools, vehicles, road signage and traffic control, lifting equipment. Permits may also be required for some work environments such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation. |
Pre-Requisites
Prerequisite Unit (s ) |
2 ) |
2 .1 ) Competencies |
|
Granting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed. UEENEEJ172A Recover, pressure test, evacuate, charge and leak test refrigerants split systems UEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace UEENEEJ102A Prepare and connect refrigerant tubing and fittings For the full prerequisite chain details for this unit please refer to Table 2 in Volume 1, Part 2 |
Employability Skills Information
Employability Skills |
3 ) This unit contains Employability Skills The required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. |
Elements and Performance Criteria Pre-Content
6 ) Elements describe the essential outcomes of a unit |
Performance criteria describe the required performance needed to demonstrate achievement of the element. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
||
1 |
Prepare to assemble, install and start up split air conditioning and water heating heat pump systems |
1.1 |
OHS procedures for a given work area are identified, obtained and understood |
1.2 |
Established OHS risk control measures and procedures in preparation for the work are followed |
||
1.3 |
Safety hazards which have not previously been identified are noted and established risk control measures are implemented |
||
1.4 |
The work is appropriately sequenced in accordance with job schedule |
||
1.5 |
Appropriate personnel are consulted to ensure the work is coordinated effectively with others involved on the work site |
||
1.6 |
The layout of the pipe work to be installed is determined from job/manufacturer specifications and diagrams |
||
1.7 |
Materials needed to carry out the work are obtained in accordance with established procedures and checked against job requirements |
||
1.8 |
Tools, equipment and testing devices needed to conduct the work are obtained in accordance with established procedures and checked for correct operation and safety |
||
1.9 |
Appropriately licensed electrician is engaged to carry out all electrical work for the air conditioning and water heating heat pump system |
||
1.10 |
Appropriately licensed plumber is engaged to carry out all mains water piping work for the heat pump hot water system |
||
1.11 |
Preparatory work is checked to ensure no damage has occurred and complies with requirements. |
||
2 |
Assemble, install and start up split air conditioning and water heating heat pump systems |
2.1 |
OHS risk control measures and procedures for carrying out the work are followed. |
2.2 |
System components are positioned in the specified location and assembled in strict accordance with manufacturer instructions and industry standards |
||
2.3 |
Interconnecting refrigerant piping/tubing is prepared and assembled in strict accordance with manufacturer instructions and industry standards. |
||
2.4 |
Components are pressure tested and evacuated in strict accordance with manufacturer instructions and industry standards |
||
2.5 |
Established methods for dealing with unexpected situations are discussed with appropriate person or persons, documented are dealt with safely and with the approval of an authorised person |
||
2.6 |
Ongoing checks of the quality of installation and start up are undertaken in accordance with established procedures |
||
2.7 |
Notification is given to appropriate person(s) that the system is ready for electrical and mains water connection in accordance with established procedures. (see note 1) |
||
2.8 |
The work is carried out efficiently without waste of materials or damage to apparatus, circuits, the surrounding environment or services and using sustainable energy principles |
||
3 |
Decommission split air conditioning and water heating heat pump systems |
3.1 |
OHS risk control measures and procedures for carrying out the work are followed. |
3.2 |
Refrigerant is pump down and/or recovered from the indoor unit. Interconnecting refrigerant piping/tubing is removed and the indoor and outdoor refrigerant circuits are sealed in accordance with manufacturer instructions and industry standards/codes of practice |
||
3.3 |
Appropriately licensed electrician is engaged to isolate and disconnect electrical supply and cabling from the air conditioning and water heating heat pump system |
||
3.4 |
Indoor and outdoor unit, refrigerant pipework, water pipeowork condensate drains and electrical conduits/cables are un-mounted. |
||
3.5 |
Established methods for dealing with unexpected situations are discussed with appropriate person or persons, documented are dealt with safely and with the approval of an authorised person |
||
3.6 |
The work is carried out efficiently without waste of materials or damage to apparatus, circuits, the surrounding environment or services and using sustainable energy principles |
||
4 |
Test single head split air conditioning and water heating heat pump systems and document |
4.1 |
OHS risk control work completion measures and procedures are followed |
4.2 |
The system performance is tested to ensure compliance with technical standards, manufacturer/ job specifications and requirements (Note 2) |
||
4.3 |
Work site and equipment is cleaned and made safe in accordance with established procedures. (Note 3) |
||
4.4 |
Work completion is documented and appropriate person(s) notified in accordance with established procedures |
Note.
1. a. Electrical connection shall be carried out by an appropriately licensed electrician.
b. Mains water connection shall be carried out by an appropriately licensed plumber.2. Unit performance is completed after associated electrical work is carried out by an appropriate electrically licensed person.
3. Making safe includes leak testing and fitting of caps to all refrigerant access ports, which could allow refrigerant to escape into the environment. It includes de-commissioning.
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
7) This describes the essential skills and knowledge and their level, required for this unit. |
Evidence shall show that knowledge has been acquired of safe working practices and positioning, assembling and starting up split air conditioning and water heating heat pump systems. All knowledge and skills detailed in this unit should be contextualised to current industry practices and technologies. KS01-EJ105A Split air conditioning and water heating heat pump system installation Evidence shall show an understanding of split air conditioning and water heating heat pump system installation, start-up and decommissioning, applying safe working practices and relevant Standards, Codes and Regulations to an extent indicated by the following aspects: T1 Sustainable energy
T2 Sustainable energy work practices
T3 Heritage awareness
T4 Relevant installation codes
T5 Split air conditioning systems T6 Types and applications
T7 Split water heating heat pump systems
T8 Installation of unit and pipework
T9 System start up
T10 De-commission split air conditioning systems
|
Evidence Guide
EVIDENCE GUIDE |
|||
9 ) The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package. . The Evidence Guide forms an integral part of this Unit. It must be used in conjunction with all parts of this unit and performed in accordance with the Assessment Guidelines of this Training Package. |
|||
Overview of Assessment |
9 .1 ) Longitudinal competency development approaches to assessment, such as Profiling, require data to be reliably gathered in a form that can be consistently interpreted over time. This approach is best utilised in Apprenticeship programs and reduces assessment intervention. It is the industry-preferred model for apprenticeships. However, where summative (or final) assessment is used it is to include the application of the competency in the normal work environment or, at a minimum, the application of the competency in a realistically simulated work environment. In some circumstances, assessment in part or full can occur outside the workplace. However, it must be in accordance with industry and regulatory policy. Methods chosen for a particular assessment will be influenced by various factors. These include the extent of the assessment, the most effective locations for the assessment activities to take place, access to physical resources, additional safety measures that may be required and the critical nature of the competencies being assessed. The critical safety nature of working with electricity, electrical equipment, gas or any other hazardous substance/material carries risk in deeming a person competent. Sources of evidence need to be 'rich' in nature to minimise error in judgment. Activities associated with normal everyday work influence decisions about how/how much the data gathered will contribute to its 'richness'. Some skills are more critical to safety and operational requirements while the same skills may be more or less frequently practised. These points are raised for the assessors to consider when choosing an assessment method and developing assessment instruments. Sample assessment instruments are included for Assessors in the Assessment Guidelines of this Training Package. |
||
Critical aspects of evidence required to demonstrate competency in this unit |
9 .2 ) Before the critical aspects of evidence are considered all prerequisites must be met. |
||
Evidence for competence in this unit shall be considered holistically. Each Element and associated performance criteria shall be demonstrated on at least two occasions in accordance with the 'Assessment Guidelines - UEE07'. Evidence shall also comprise:
|
|||
|
|||
|
|||
|
|||
A |
Determining job requirements correctly |
||
B |
Positioning and assembling system components to specifications |
||
C |
Assembling piping and tubing to specifications |
||
D |
Pressure testing an evacuating the system in accordance with manufacturer's instructions and industry standards, codes and regulations. Note: |
||
E |
Giving notification to appropriate person for electrical connections to be completed |
||
F |
De-commissioning single head split air conditioning and water heating heat pump units |
||
G |
Testing system performance correctly to manufacturer design specifications |
||
H |
Documenting work activities |
||
I |
Demonstrating a basic understanding of system performance outside manufacturers design specifications |
||
J |
Demonstrating a basic understanding of the compressor, condenser, evaporator and flow control types and their function relevant to single head split system installation |
||
K |
Dealing with unplanned events by drawing on essential knowledge and skills to provide appropriate solutions incorporated in the holistic assessment with the above listed items |
||
Note: |
|||
Context of and specific resources for assessment |
9 .3 ) This unit should be assessed as it relates to normal work practice using procedures, information and resources typical of a workplace. This should include:
These should be part of the formal learning/assessment environment. Note: |
||
Evidence should show demonstrated competency in positioning, assembling and starting up split air conditioning and water heating heat pump systems. |
|||
Method of assessment |
9 .4 ) This unit shall be assessed by methods given in Volume 1, Part 3 'Assessment Guidelines'. Note: |
||
Concurrent assessment and relationship with other units |
9 .5 ) |
||
There are no concurrent assessment recommendations for this unit. |
Range Statement
RANGE STATEMENT |
|
8 ) This relates to the unit as a whole providing the range of contexts and conditions to which the performance criteria apply. It allows for different work environments and situations that will affect performance. |
|
This unit must be demonstrated in relation to the assembly, installation and starting up and de-commissioning of single head split air conditioning and water heating heat pump systems (hot water or swimming pool) up to a maximum of 18kWr 'refrigeration' capacity with the following attributes: |
|
|
|
Note: 2. This includes the installation, commissioning and de-commissioning of single head wall hung split air conditioning and water heating heat pump systems. The maximum plant capacity for each system is 18 kWr. 3. This unit DOES NOT COVER COMPETENCIES FOR service, repair, maintenance, diagnostic/fault finding and electrical work and the safe and proper installation of commercial refrigeration and air conditioning and water heating heat pump plant and equipment. |
|
Generic terms used throughout this Vocational Standard shall be regarded as part of the Range Statement in which competency is demonstrated. The definition of these and other terms that apply are given in Volume 2, Part 2.1. |
Unit Sector(s)
Not Applicable
Competency Field
2 .2 ) Literacy and numeracy skills Participants are best equipped to achieve competency in this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 'Literacy and Numeracy' |
|||||
Reading |
3 |
Writing |
3 |
Numeracy |
3 |
2.2) Literacy and numeracy skills
Competency Field |
5 ) |
Refrigeration and Air Conditioning |