Modification History
Not Applicable
Unit Descriptor
Unit Descriptor |
This unit involves the skills and knowledge required to undertake measurement and marking of track for resurfacing operations in accordance with safe working and regulatory requirements and workplace procedures. It includes identifying and marking track obstructions, using appropriate measurement tools to measure the range of geometry elements, calculating recording and marking data for resurfacing operations, and recording and reporting of results. Licensing or certification requirements are not applicable to this unit. |
Application of the Unit
Application of the Unit |
Persons achieving competence in this unit will need to fulfil the applicable legislated rail safety requirements including acts and regulations from each state and territory together with any nationally approved compliance codes and/or guidelines. Work is performed under minimal supervision, generally within a team environment. It involves the application of routine operational principles and procedures to measure and mark track for resurfacing across a variety of operational contexts. |
Licensing/Regulatory Information
Refer to Unit Descriptor
Pre-Requisites
Not Applicable
Employability Skills Information
Employability Skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the required performance needed to demonstrate achievement of the element. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1 Plan for resurfacing |
1.1 Scope of resurfacing work, including ramp-in and ramp-out points, mode of machine application and requirements for measurements are determined 1.2 Appropriate survey documentation is selected 1.3 Survey plaques and monuments are located and accurately interpreted as required |
2 Mark /protect obstructions |
2.1 Track obstructions are identified 2.2 Track obstructions are marked or protected as required in accordance with workplace procedures |
3 Measure geometry and record results |
3.1 Equipment appropriate to task is selected and checked for correct operation in accordance with manufacturers instructions and workplace procedures 3.2 Equipment is operated in accordance with manufacturers or work instructions to provide appropriate data for analysis 3.3 Track geometry is measured in accordance with workplace procedures 3.4 Measurements are recorded in accordance with workplace procedures |
4 Mark track |
4.1 Required offsets and machine adjustment values are calculated and recorded in accordance with workplace procedures 4.2 Track data is marked on track where required in accordance with workplace procedures |
5 Use /report data |
5.1 Data is compared to maintenance/construction tolerances in accordance with workplace procedures 5.2 Results are reported in accordance with workplace procedures |
Required Skills and Knowledge
REQUIRED KNOWLEDGE AND SKILLS |
This describes the essential knowledge and skills and their level required for this unit. |
Required knowledge : |
|
|
|
|
|
|
|
|
|
|
Required skills : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package. |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
|
Context of and specific resources for assessment |
|
Method of assessment |
|
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. |
|
Operations may be conducted: |
|
Resurfacing work may be related to: |
|
On-track machines may include: |
|
Track measurement may include: |
|
Equipment used for measuring and calculating track data may include: |
|
Recording equipment may include: |
|
Liaison may include: |
|
Communication equipment systems may include: |
|
Safety and protective equipment may include: |
|
Depending on the type of organisation concerned and the local terminology used, workplace procedures may include: |
|
Information/documents may include |
|
Applicable regulations and legislation may include: |
|
Unit Sector(s)
Not Applicable
Competency Field
Competency Field |
S - Construction and Installation |