^

 
 

Unit of competency details

TLIS2034 - Install and repair rail fastening systems (Release 2)

Summary

Usage recommendation:
Current
Mapping:
MappingNotesDate
Supersedes and is equivalent to TLIS2034A - Install and repair rail fastening systemsUpdated to align with the Standards for Training Packages. 18/Oct/2015

Release Status:
Current
Releases:
ReleaseRelease date
2 (this release) 29/Jan/2021
(View details for release 1) 19/Oct/2015


Qualifications that include this unit

CodeSort Table listing Qualifications that include this unit by the Code columnTitleSort Table listing Qualifications that include this unit by the Title columnUsage RecommendationRelease
TLI27121 - Certificate II in Rail InfrastructureCertificate II in Rail InfrastructureCurrent
TLI21315 - Certificate II in Rail InfrastructureCertificate II in Rail InfrastructureSuperseded1-2 
TLI27120 - Certificate II in Rail InfrastructureCertificate II in Rail InfrastructureSuperseded
TLI22215 - Certificate II in Tram or Light Rail InfrastructureCertificate II in Tram or Light Rail InfrastructureSuperseded1-2 
TLI37122 - Certificate III in Rail InfrastructureCertificate III in Rail InfrastructureCurrent1-2 
TLI37121 - Certificate III in Rail InfrastructureCertificate III in Rail InfrastructureSuperseded
TLI37120 - Certificate III in Rail InfrastructureCertificate III in Rail InfrastructureSuperseded
TLI32115 - Certificate III in Rail StructuresCertificate III in Rail StructuresSuperseded1-3 
TLI32121 - Certificate III in Rail StructuresCertificate III in Rail StructuresCurrent
TLI31815 - Certificate III in Rail Track SurfacingCertificate III in Rail Track SurfacingSuperseded1-2 
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 10 of 10

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 039907 Rail Operations  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 039907 Rail Operations  29/Apr/2016 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Unit of competency

Modification History

Release 2 . This is the second release of this unit of competency in the TLI Transport and Logistics Training Package:

  • Minor statement changes in Assessment Conditions.

Release 1 . This is the first release of this unit of competency in the TLI Transport and Logistics Training Package.

Application

This unit involves the skills and knowledge required to install and repair rail fastening systems in accordance with safeworking and regulatory requirements, and workplace procedures.

It includes identifying work requirements, installing the fastening system, repairing the fastening system and completing all required documentation.

People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.

Work is performed under some supervision, generally within a team environment. It involves the application of routine operational principles and procedures when installing and repairing rail fastening systems, as part of workplace activities across a variety of operational contexts within the Australian rail system.

Operators of mechanised equipment must have undertaken training and, where appropriate, hold the relevant licence, permit or certificate and be recognised as competent for the class of machinery being used.

Pre-requisite Unit

Not applicable.

Competency Field

S – Construction and Installation

Unit Sector

Rail sector.

Elements and Performance Criteria

ELEMENTS 

PERFORMANCE CRITERIA 

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1  

Prepare for work 

1.1 

Worksite is identified to confirm work requirements

1.2 

Appropriate fastening system is chosen to suit job requirements

1.3 

Hazards are identified, risks are assessed and control measures are implemented

1.4 

Appropriate tools and equipment are selected for job to facilitate the effective replacement/repair of components

2 

Install fastening system 

2.1 

Required rail industry standards for installing fastening systems are confirmed

2.2 

Selected fastening systems are installed using appropriate tools and equipment in accordance with rail industry standards

2.3 

Tools and equipment are stored after use

3 

Repair fastening system 

3.1 

Appropriate method is chosen to repair fastening system

3.2 

Required standards for repairing fastening systems are confirmed

3.3 

Fastening systems are repaired to maintain integrity of rail fastening systems in accordance with rail industry standards

3.4 

Tools and equipment are stored after use

4 

Complete documentation 

4.1 

Required documentation procedures and processes are confirmed

4.2 

Documentation is filled in legibly and proofread

4.3 

Documentation is processed in accordance with workplace requirements

Foundation Skills

Foundation skills essential to performance are explicit in the performance criteria of this unit of competency.

Range of Conditions

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit Mapping Information

This unit replaces and is equivalent to TLIS2034A Install and repair rail fastening systems.

Links

Companion Volume Implementation Guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=df441c6e-213d-43e3-874c-0b3f7036d851

 

Assessment requirements

Modification History

Release 2 . This is the second release of this unit of competency in the TLI Transport and Logistics Training Package:

  • Minor statement changes in Assessment Conditions.

Release 1 . This is the first release of this unit of competency in the TLI Transport and Logistics Training Package.

Performance Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

  • applying relevant system of safeworking and workplace procedures
  • ensuring completed track complies with rail industry track standards for the relevant rail corridor
  • identifying job hazards and taking required action to minimise, control or eliminate identified hazards
  • installing rail fastening systems on track using static and resilient fastenings used in the relevant rail corridors
  • modifying activities depending on operational contingencies, risk situations and environments
  • reading and interpreting relevant technical plans, specifications, instructions and manuals
  • repairing a section of anchored track to maintain integrity of rail fastening systems
  • reporting and/or rectifying identified problems, faults or malfunctions, in accordance with workplace procedures
  • selecting and using relevant equipment and tools
  • working systematically with required attention to detail without injury to self or others, or damage to equipment.

Knowledge Evidence

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and include knowledge of:

  • characteristics and relevant information on rail fastening systems
  • characteristics of plant and equipment, hardware and components used in work activities
  • hazards that may exist when installing and repairing rail fastening systems, and ways of controlling the risks involved
  • information in relevant manufacturer instructions, workplace technical manuals and instructions
  • problems that may occur when installing and repairing rail fastening systems, and action that can be taken to report or resolve these problems
  • relevant rail danger zones
  • relevant rail fastening and anchoring equipment and methods
  • relevant rail industry standards on rail fastening systems
  • relevant recording and documentation procedures
  • relevant rail safety, work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations
  • workplace procedures for installing and repairing rail fastening systems.

Assessment Conditions

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in workplace operational situations or, where this is not available, in simulated workplace operational situations that replicate rail corridor workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

  • a range of relevant exercises, case studies and/or simulations
  • relevant and appropriate materials, tools, equipment and personal protective equipment (PPE) currently used in industry
  • applicable documentation including workplace procedures, regulations, rail industry standards, codes of practice and operation manuals.

Links

Companion Volume Implementation Guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=df441c6e-213d-43e3-874c-0b3f7036d851