Unit of competency details

RIIMCU308A - Install and recover longwall equipment (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Is superseded by and equivalent to RIIMCU308D - Install and recover longwall equipment 13/Nov/2013

Releases:
ReleaseRelease date
1 1 (this release) 22/Jun/2011

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 030717 Plant And Machine Operations  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 030717 Plant And Machine Operations  02/Sep/2009 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not applicable.

Unit Descriptor

This unit covers the installation and recovery of longwall equipment in the coal industry. It includes: planning and preparing, installing and recovering equipment, and carrying out operator maintenance. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between States, Territories, and industry sectors. Relevant information must be sourced prior to application of the unit.

Application of the Unit

This unit is appropriate for those working in an operational role at worksites within:

  • Coal mining

Licensing/Regulatory Information

Refer to Unit Descriptor.

Pre-Requisites

Not applicable.

Employability Skills Information

This unit contains employability skills.

Elements and Performance Criteria Pre-Content

Elements describe the essential outcomes of a unit of competency.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Plan and prepare

1.1. Access, interpret and apply compliance documentation  relevant to the work activity

1.2. Obtain, interpret and clarify/confirm work requirements  before proceeding

1.3. Access, interpret and apply mine environment , geological and survey data  required to complete the allocated work

2. Install and recover equipment

2.1. Resolve coordination activities  with others at the site prior to commencement of, and during, the work activity

2.2. Carry out pre-start, start-up, shutdown and isolation procedures in accordance with manufacturer's instructions and/or site procedures

2.3. Complete installation , recovery  and machine operation in accordance with manufacturer's instructions and the longwall installation /recovery  plan

2.4. Act upon or report factors adversely affecting the installation and recovery  in accordance with site procedures

2.5. Maintain ventilation, identify/monitor changing geological conditions and take action in accordance with site procedures

2.6. Recognise and respond to hazardous  and emergency situations  in accordance with manufacturer's instructions and/or site procedures

2.7. Leave workplace safe and in accordance with site procedures

3. Carry out operator maintenance

3.1. Carry out longwall equipment  inspections and fault finding in accordance with manufacturer's instructions and/or site requirements

3.2. Carry out routine operational servicing, lubrication and housekeeping tasks in accordance with manufacturer's instructions and/or site procedures and practices

3.3. Carry out minor maintenance to manufacturer's instructions and/or site requirements

3.4. Provide operator support during preparation for, and conduct of, maintenance tasks in accordance with site requirements

3.5. Process records in accordance with site requirements

Required Skills and Knowledge

This section describes the skills and knowledge required for this unit.

Required skills 

Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to install and recover longwall equipment:

  • apply legislative, organisation and site requirements and procedures for the installation and recovery of longwall equipment
  • apply operational safety requirements
  • access, interpret, apply and communicate technical information
  • interpret survey and geological data
  • apply hand-eye coordination
  • apply diagnostic and fault finding techniques
  • use hand tools
  • maintain equipment records
  • comply with environmental requirements

Required knowledge 

Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to install and recover longwall equipment:

  • site operational safety procedures
  • longwall equipment operational processes and procedures
  • longwall equipment characteristics, uses and limitations
  • site geology and survey data
  • site ventilation systems
  • longwall equipment maintenance systems and procedures
  • site environmental requirements and constraints relevant to longwall equipment installation and recovery

Evidence Guide

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment 

Critical aspects for assessment and evidence required to demonstrate competency in this unit 

The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:

  • knowledge of the requirements, procedures and instructions for installing and recovering longwall equipment
  • implementation of requirements, procedures and techniques for the safe, effective and efficient completion of the installation and recovery of longwall equipment
  • working with others to undertake and complete the installation and recovery of longwall equipment in a way that meets all of the required outcomes
  • consistent timely completion of longwall equipment installation and recovery that safely, effectively and efficiently meets the required outcomes

Context of and specific resources for assessment 

  • This unit must be assessed in the context of the work environment. Where personal safety or environmental damage are limiting factors, assessment may occur in a simulated environment provided it is realistic and sufficiently rigorous to cover all aspects of workplace performance, including task skills, task management skills, contingency management skills and job role environment skills.
  • Assessment of this competency requires typical resources normally used in a resources and infrastructure sector environment. Selection and use of resources for particular worksites may differ due to the site circumstances.
  • The assessment environment should not disadvantage the participant. For example, language, literacy and numeracy demands of assessment should not be greater than those required on the job.
  • Customisation of assessment and delivery environment to sensitively accommodate cultural diversity.
  • Aboriginal people and other people from a non English speaking background may have second language issues.
  • Where applicable, physical resources should include equipment modified for people with disabilities. Access must be provided to appropriate learning and/or assessment support when required.

Method of assessment 

This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:

  • written and/or oral assessment of the candidate's required knowledge
  • observed, documented and/or first hand testimonial evidence of the candidate's:
  • implementation of appropriate requirement, procedures and techniques for the safe, effective and efficient achievement of required outcomes
  • consistent achievement of required outcomes
  • first hand testimonial evidence of the candidate's:
  • working with others to undertake and complete the installation and recovery of longwall equipment

Guidance information for assessment 

Consult the SkillsDMC User Guide for further information on assessment including access and equity issues.

Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Relevant compliance documentation  may include:

  • legislative, organisational and site requirements and procedures
  • manufacturer's guidelines and specifications
  • management plans
  • OHS policy
  • Australian standards
  • Employment and workplace relations legislation
  • Equal Employment Opportunity and Disability Discrimination legislation

Work requirements  may be in the form of:

  • shift briefings
  • handover details
  • work orders

Work requirements  details may include:

  • equipment, including defects
  • cutting height
  • next cutting sequence
  • achievement targets
  • essential survey data
  • geological conditions
  • hazards
  • potential hazards
  • coordination requirements/issues

Mine environmental , geological and survey data  may be in the form of:

  • ventilation/gas data
  • Deputy reports
  • geological hazard plan
  • survey data

Emergency situations  may include:

  • roof and rib fall
  • fire
  • flash
  • explosion
  • outbursts
  • inrush

Longwall equipment  to be installed or recovered may include:

  • pantech
  • AFC
  • pans
  • tailgate/maingate
  • breaker line supports
  • shearer
  • cables
  • airhoses
  • hydraulic chocks
  • bretby monorail

Hazards /potential hazards may include:

  • heavy machinery
  • gas accumulation
  • roof-rib
  • water
  • dust
  • diesel fumes
  • high pressure hoses
  • lifting
  • pulling equipment
  • heat

Equipment  may include:

  • chock transporter
  • impro
  • mine dozer (electric or diesel)
  • chainblocks
  • winches
  • roof bolters
  • multipurpose vehicles
  • re-reelers
  • load haul dump vehicles
  • E-Frame
  • diesel locos

Coordination activities  may include those with:

  • equipment operators
  • transportation operators

Operator  (operational ) maintenance  procedures are those established and authorised for the site.

Unit Sector(s)

Coal Mining (Underground)

Competency field

Refer to Unit Sector(s).

Co-requisite units

Not applicable.