Unit of competency details

RIIEGS306D - Prepare drill site (Release 1)

Summary

Usage recommendation:
Deleted
The Deleted usage recommendation was implemented on 13 June 2017 to describe training components that have no replacement. Enrolments in training components and statements of attainment or qualifications issued before 13 June 2017 are valid. For any components marked as deleted after 13 June 2017, the applicable transition/teach-out periods apply. For specific questions regarding the enrolment, delivery or issuance of a statement of attainment/qualification, please contact your training regulator.
Mapping:
MappingNotesDate
DeletedDeleted from RII Resources and Infrastructure Industry Training Package11/Mar/2021
Supersedes and is equivalent to RIIEGS306A - Prepare drill site13/Nov/2013

Releases:
ReleaseRelease date
(View details for release 2) 07/Dec/2014
1 (this release) 14/Nov/2013


Replaced release

You are currently viewing the components related to release 1.
The current release is release 2View release 2 details.

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 030303 Mining Engineering  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 030303 Mining Engineering  02/May/2014 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Unit of competency

Modification History

Not applicable.

Application

This unit describes a participant’s skills and knowledge required to prepare a drill site in Metalliferous mining.

This unit is appropriate for those working in operational roles.

Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.

Unit Sector

Metalliferous mining

Elements and Performance Criteria

1. Plan and prepare for drill site preparation

1.1. Access, interpret and apply drill site preparation documentation and ensure the work activity is compliant

1.2. Obtain, read, interpret, clarify and confirm the drill site layout plan to confirm the location, size and configuration of the proposed drill site

1.3. Identify and address potential risks, hazards and environmental issues, and implement control measures

1.4. Select and wear personal protective equipment appropriate for the work activities

1.5. Establish communication system and protocols

1.6. Carry out plant and equipment pre-start checks

2. Create access to drill site

2.1. Identify existing tracks and use for entry to drill site

2.2. If necessary, create new tracks which minimises water flows and erosion by following the natural contours of the land

2.3. Create new tracks to drill site which minimise the clearing of vegetation by avoiding large trees and preserving root stocks

2.4. Raise blades to a minimum of 150mm when using machinery to prepare access blade

2.5. Cut or trim larger trees if unavoidable

2.6. Stockpile or windrow cleared vegetation for use during site rehabilitation

3. Prepare drill site

3.1. Clear drill site removing minimum vegetation

3.2. Seek permission from appropriate person to move hole location if vegetation significantly impedes access to the proposed drill site

3.3. Manually clear ground cover to prevent fire hazards to drill rig

3.4. Leave mature trees undisturbed

3.5. Build sumps and bunds on the downside of the hole collar location

4. Minimise impact of contaminated groundwater

4.1. Identify the possible presence of groundwater which may be a threat to vegetation during drilling operations

4.2. If groundwater is discovered, construct appropriate number of sumps to recommended configuration and distances from the drill rig location

4.3. Store topsoil removed from sump construction separately to facilitate more effective rehabilitation

5. Manage rare flora

5.1. Determine the presence and type of rare flora before clearing vegetation,

5.2. Seek advice on the action to be taken where rare flora are identified

Foundation Skills

Foundation skills essential to performance are explicit in the performance criteria of this unit. Further information is available in the Resources and Infrastructure Industry Training Package Companion Volume.

Unit Mapping Information

RIIEGS306A Prepare drill site

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=88a61002-9a21-4386-aaf8-69c76e675272

 

Assessment requirements

Modification History

Not applicable.

Performance Evidence

Evidence is required to be collected that demonstrates a candidate’s competency in this unit. Evidence must be relevant to the roles within this sector’s work operations and satisfy all of the requirements of the performance criteria of this unit and include evidence that the candidate:

  • locates and applies relevant documentation, policies and procedures
  • implements the requirements, procedures and techniques for the safe, effective and efficient completion of drill site preparation including:
  • identifying, recording and reporting rare flora
  • identifying and containing contaminated groundwater
  • cutting or trimming trees and vegetation
  • performing manual and mechanical handling
  • constructing sumps and bunds
  • demonstrates consistent and timely preparing a drill site that safely, effectively and efficiently meet all of the required outcomes on a minimum of three (3) separate occasions including:
  • accessing plans to identify drill site requirements
  • performing plant and equipment pre-start checks
  • operating equipment within required limitations
  • creating access to the drill site
  • clearing and preparing the drill site with minimal disruption to environment

Knowledge Evidence

The candidate must demonstrate knowledge of preparing a drill site through:

  • identifying particular state or territory regulations relating to vegetation clearing
  • identifying and controlling hazards associated with drill site preparation work
  • interpreting drill site layout plans
  • identifying and applying environmental principles and practices, and work procedures
  • identifying and applying fire control methods
  • identifying re-vegetation methods
  • identifying natural land contours
  • identifying groundwater systems
  • identifying types and operational characteristics of plant/equipment used in creating access tracks and for drill site preparation operations

Assessment Conditions

  • An assessor of this unit must satisfy the requirements of the NVR/AQTF or their successors; and Industry regulations for certification and licensing; and,
  • this unit must be assessed in the context of this sector’s work environment; and,
  • this unit must be assessed using Resources and Infrastructure Industry sector specific policies, procedures, processes and operational manuals; and,
  • an assessor most demonstrate the skills and knowledge of this unit through five (5) years of current and continuous work with the Industry sector and must hold the TAE Assessor Skill Set or equivalent.

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=88a61002-9a21-4386-aaf8-69c76e675272