Modification History
Not applicable.
Unit Descriptor
This unit specifies the outcomes required to safely record delivery information for concrete delivered to concrete pavements.
The unit includes the conduct of planning, preparing, receiving, tipping, discharging, recording and cleaning up during concrete delivery operations. Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories and industry sectors. Relevant information must be sourced prior to application of the unit
Application of the Unit
This unit is appropriate for those working in an operational role at worksites within:
Civil construction
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Not applicable.
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
1. Plan and prepare for operations |
1.1 Access, interpret and apply compliance documentation relevant to the work activity 1.2 Obtain and confirm safety requirements from the site safety plan and organisational policies and procedures, and apply to the allotted task 1.3 Identify, obtain and implement signage requirements from the project traffic management plan 1.4 Select plant, tools and equipment to carry out tasks consistent with the requirements of the job, check for serviceability and rectify or report any faults 1.5 Identify environmental protection requirements from the project environmental management plan, and confirm and apply to the allotted task |
2. Receive concrete |
2.1 Identify survey datum points required to accurately locate material placement 2.2 Check delivery documents for accuracy against ordered material 2.3 Check delivery docket for compliance with test results 2.4 Check for compliance of delivery docket with batching times 2.5 Direct required action for non compliant loads 2.6 Direct concrete delivery vehicle to location for discharge |
3. Tip/discharge concrete |
3.1 Maintain safe working area around pour location 3.2 Establish actual pour location of discharged load 3.3 Discharge concrete from delivery vehicle directly or via chute or material handling equipment 3.4 Discharge concrete to required placement level 3.5 Visually assess load for uniformity and consistency to test results recorded on delivery docket 3.6 Direct delivery vehicle safely away from pour location once discharge is complete |
4. Record information |
4.1 Record appropriate details from the delivery docket 4.2 Record the time and location of the discharge of the load 4.3 Record additional information as required by worksite procedures 4.4 Compete end of day records and dockets and pass onto appropriate site personnel completed days records |
5. Clean up |
5.1 Clean work area 5.2 Clean, check, maintain and store tools and equipment in line with relevant site procedures |
Required Skills and Knowledge
Required skills |
Specific skills are required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes the ability to carry out the following, as required to receive, check and record concrete road paver deliveries including:
|
Required knowledge |
Specific knowledge is required to achieve the Performance Criteria of this unit, particularly for its application in the various circumstances in which this unit may be used. This includes knowledge of the following, as required to conduct receive, check and record concrete deliveries including:
|
Evidence Guide
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
The evidence required to demonstrate competency in this unit must be relevant to worksite operations and satisfy all of the requirements of the performance criteria, required skills and knowledge and the range statement of this unit and include evidence of the following:
|
Context of and specific resources for assessment |
|
Method of assessment |
This unit may be assessed in a holistic way with other units of competency. The assessment strategy for this unit must verify required knowledge and skill and practical application using more than one of the following assessment methods:
|
Guidance information for assessment |
Consult the SkillsDMC User Guide for further information on assessment including access and equity issues. |
Range Statement
Relevant compliance documentation may include: |
|
Safety requirements may include: |
|
Site may include: |
|
Task may include: |
|
Traffic may include: |
|
Plants, tools and equipment may include: |
|
Environmental protection requirements may include: |
|
Delivery documents |
batch dockets from batching plant |
Safe working area |
|
Uniformity and consistency |
|
Appropriate details |
|
Additional information |
|
Unit Sector(s)
Road and Pavements Construction and Maintenance (General)
Custom Content Section