Unit of competency details

MSFKB3005 - Fabricate cabinets for the built-in environment (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Supersedes and is equivalent to LMFKB3005A - Fabricate cabinets for the built-in environment 09/Dec/2013
Is superseded by MSFFM3042 - Fabricate cabinetry 07/Dec/2022

Releases:
ReleaseRelease date
1 1 (this release) 10/Dec/2013


Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 040311 Carpentry And Joinery  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 040311 Carpentry And Joinery  02/May/2014 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Unit of competency

Modification History

Release 1 - New unit of competency

Application

This unit of competency covers planning production processes, and constructing and assembling components to fabricate cabinets that meet predetermined specifications in a manufacturing workshop environment. It includes operating computer numerically controlled (CNC) and static machines.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

Pre-requisite Unit

Competency Field

Unit Sector

Kitchens and Bathrooms

Elements and Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Plan cabinet construction

1.1

Workplace health and safety (WHS) requirements, including personal protection needs, are observed throughout the work

1.2

Drawings, specifications and customer instructions are completed or interpreted, including design, tolerances, process, materials, finish and quantity

1.3

Construction techniques to be used in cabinet manufacture are identified and selected

1.4

Industry standards for cabinet construction are determined

1.5

Construction and assembly sequence is planned

1.6

A cutting list is developed from the plan

1.7

Tools, machines and equipment suitable for construction are identified and checked for safe and effective operation

1.8

Procedures for checking quality at each stage of the process are determined

1.9

Work area is cleared and prepared for production

2

Select and prepare materials for cabinet construction

2.1

Features, benefits and limitations of materials and components used for cabinet construction are identified

2.2

Surface treatments used for cabinets in a range of applications are identified

2.3

Industry standards for materials used in cabinets are identified

2.4

Materials to meet the customer requirements are selected and prepared for use

3

Select and prepare cabinet components

3.1

Features, benefits and limitations of components used for cabinets in a range of applications are identified

3.2

Components to meet the customer requirements are selected and prepared for use

4

Construct cabinets

4.1

Observe WHS requirements, including personal protection needs, throughout the work

4.2

Use tools, machines and equipment in accordance with safety requirements and manufacturer specifications

4.3

Cut and form materials in accordance with the plan

4.4

Cabinets are manufactured and checked against set-outs for tolerances, fit and accuracy

4.5

Product is checked against plans at identified checkpoints

5

Assemble cabinets

5.1

Cabinets are assembled using components identified in construction plan

5.2

Components are attached and checked against set-outs for accuracy, fit, twist and distortion

5.3

Doors, drawers and shelves are assembled and fitted

5.4

Product is prepared for final finish, including the removal of bruises, scratches, dents and marks

5.5

Work area is cleaned and rubbish disposed of according to environmental standards

5.6

Workplace documentation is completed

Foundation Skills

Foundation skills essential to performance are explicit in the performance criteria of this unit of competency. Detail on appropriate performance levels for each furnishing unit of competency in reading, writing, oral communication and numeracy utilising the Australian Core Skills Framework (ACSF) are provided in the Furnishing Training Package Implementation Guide.

Range of Conditions

Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment.

Unit context includes: 

  • WHS requirements, including legislation, building codes, material safety management systems, hazardous and dangerous goods codes, and local safe operating procedures or equivalent
  • work is carried out in accordance with legislative obligations, environmental legislation, relevant health regulations, manual handling procedures and organisation insurance requirements
  • work requires individual to demonstrate some discretion, judgement and problem solving

Construction techniques include: 

  • use of CNC or static machinery
  • computer-aided manufacturing (CAM)

Tools, machines and equipment include: 

  • CNC equipment
  • static machines
  • hand and power tools
  • measuring devices

Materials include: 

  • glass
  • particleboard
  • fibre board
  • solid timber
  • veneer
  • vinyl
  • laminates
  • adhesives
  • tops
  • edges

Surface treatments include: 

  • lacquers, polishes and oils
  • laminates
  • paints

Range of applications includes: 

  • kitchens or bathrooms
  • other domestic settings, such as laundries

Components include: 

  • baskets
  • rollers
  • hinges
  • dowel
  • pins
  • cams
  • metal frames
  • connectors
  • patented devices
  • handles

Personal protective equipment includes: 

  • that prescribed under legislation, regulations and enterprise policies and practices

Information and procedures include: 

  • workplace procedures relating to the use of tools and equipment
  • work instructions, including job sheets, cutting lists, plans, drawings and designs
  • workplace procedures relating to reporting and communication
  • manufacturer specifications and operational procedures

Unit Mapping Information

Supersedes and is equivalent to LMFKB3005A Fabricate cabinets for the built-in environment.

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=0601ab95-583a-4e93-b2d4-cfb27b03ed73

 

Assessment requirements

Modification History

Release 1 - New unit of competency

Performance Evidence

  • Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
  • Follow work instructions, operating procedures and inspection processes to:
  • minimise the risk of injury to self or others
  • prevent damage to goods, equipment and products
  • maintain required production output and product quality
  • Interpret and apply information from plans and drawings to inform the materials required, sequence of operations and assembly techniques for fabrication of cabinets
  • Identify and source materials and components used in cabinets for kitchens, bathrooms and other residential settings specified in the design plan and specifications
  • Plan fabrication process for cutting, forming and finishing cabinet components and construct and assemble cabinets using hand and power tools safely and efficiently to meet the design specifications
  • Determine that fabricated cabinets meet specified quality outcomes, complete housekeeping and reporting requirements
  • Use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate material requirements
  • Communicate ideas and information to enable confirmation of work requirements and specifications and the reporting of work outcomes and problems, interpret basic plans and follow safety procedures
  • Minimise wastage of resources, including materials, time and money
  • Work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity

Knowledge Evidence

  • Processes used for the construction of cabinets
  • Features of cabinets and components used in kitchen and bathroom and other residential projects
  • State or territory WHS legislation, regulations, standards and codes of practice relevant to work
  • Characteristics of materials, products and defects
  • Procedures for documenting workplace records and information
  • Appropriate mathematical procedures for measurement
  • Relevant problem identification and resolution techniques

Assessment Conditions

  • Assessors must:
  • hold training and assessment competencies as determined by the National Skills Standards Council (NSSC) or its successors
  • have vocational competency in the furnishing industry at least to the level being assessed with broad industry knowledge and experience, usually combined with a relevant industry qualification
  • be familiar with the current skills and knowledge used and have relevant, current experience in the furnishing industry.
  • Assessment methods must confirm consistency of performance over time rather than a single assessment event and in a range of workplace relevant contexts. Evidence must be provided of fabrication of at least two different cabinet fabrication projects
  • Assessment must be by observation of relevant tasks with questioning on underpinning knowledge and, where applicable, multimedia evidence, supervisor’s reports, completed cabinet fabrication projects and work samples.
  • Assessment is to be conducted on single units of competency or in conjunction with other related units of competency. Foundation skills are integral to competent performance in the unit and should not be assessed separately.
  • Assessment must occur on the job or in a workplace simulated facility with relevant process, equipment, materials, work instructions and deadlines required for constructing and assembling cabinets.
  • Access is required to tools and equipment required for constructing and assembling cabinets; and plans, drawings and manuals relating to work.

Links