Unit of competency
Modification History
Release 1 - New unit of competency
Application
This unit of competency covers installing strip timber flooring onto a sub-floor applying top-nailing or secret nailing methods.
Licensing, legislative or certification requirements may apply to this unit and relevant state/territory and local government agencies should be consulted to determine any necessary certification or licensing for undertaking flooring work. Access to construction sites requires certification of general induction training specified by the National Code of Practice for Induction for Construction Work (ASCC 2007).
Pre-requisite Unit
Competency Field
Unit Sector
Flooring technology
Elements and Performance Criteria
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to demonstrate achievement of the element. |
||
1 |
Prepare for work |
1.1 |
Applicable work health and safety (WHS), legislative and organisational requirements relevant to the nailing of strip timber flooring onto a sub-floor applying top-nailing or secret nailing methods are verified and complied with |
1.2 |
Instructions and/or plans are read and interpreted to identify process required to complete work tasks |
||
1.3 |
Sub-floor condition is assessed for suitability for nailing of strip timber flooring applying top-nailing or secret nailing methods consistent with Australian Standards, industry standards and manufacturer recommendations |
||
1.4 |
Suitable fixings and adhesives are selected as required |
||
1.5 |
Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition |
||
1.6 |
Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation |
||
2 |
Prepare to nail strip timber flooring |
2.1 |
Instructions and sequence for nailing and fixing timber flooring are followed |
2.2 |
Work lines and starting point are established |
||
2.3 |
Timber flooring is laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate |
||
2.4 |
The aesthetics of the materials are maximised, where appropriate, matching grains and colours |
||
2.5 |
Work station for power source for nail guns is established, and air hoses are run to worksite |
||
3 |
Nail strip timber flooring |
3.1 |
Nails, staples and adhesives for fixing are organised and used in accordance with relevant safety management requirements |
3.2 |
Nailing methods and equipment are used following manufacturer recommendations and Australian Standards |
||
3.3 |
Strip timber flooring is positioned using cramping procedures |
||
3.4 |
Top-nailing or secret nailing methods are used as required for the job at hand |
||
3.5 |
Finished job is inspected and any imperfections are rectified following workplace procedures |
||
4 |
Complete housekeeping |
4.1 |
Unused materials are stored or recycled as required |
4.2 |
Tools and equipment are cleaned and stored appropriately |
||
4.3 |
Work area is cleaned and rubbish disposed of appropriately |
||
4.4 |
Workplace documentation is completed |
Foundation Skills
Foundation skills essential to performance are explicit in the performance criteria of this unit of competency. Detail on appropriate performance levels for each furnishing unit of competency in reading, writing, oral communication and numeracy utilising the Australian Core Skills Framework (ACSF) are provided in the Furnishing Training Package Implementation Guide.
Range of Conditions
Specifies different work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Range is restricted to essential operating conditions and any other variables essential to the work environment. |
|
Unit context includes: |
|
Nail strip timber flooring onto plywood underlay and battens includes: |
|
Adhesives include: |
|
Tools and equipment include: |
|
Materials include: |
|
Timber flooring includes: |
|
Timber battens include: |
|
Personal protective equipment includes: |
|
Information and procedures include: |
|
Unit Mapping Information
Supersedes and is equivalent to LMFFL2503A Nail strip timber flooring
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=0601ab95-583a-4e93-b2d4-cfb27b03ed73