Unit of competency details

MSACMT621A - Develop a Just in Time (JIT) system (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Is superseded by MSS405021A - Develop a Just in Time systemPrerequisite removed Alignment corrected 01/May/2012

Releases:
ReleaseRelease date
1 1 (this release) 01/Dec/2005

Training packages that include this unit

CodeSort Table listing Training packages that include this unit by the Code columnTitleSort Table listing Training packages that include this unit by the Title columnRelease
PMB07 - Plastics, Rubber and Cablemaking Training PackagePlastics, Rubber and Cablemaking Training Package 1.1 
ICP10 - Printing and Graphic ArtsPrinting and Graphic Arts 1.0-2.1 
PUA00 - Public Safety Training PackagePublic Safety Training Package 8.1 
MSA07 - Manufacturing Training PackageManufacturing Training Package 6.0-7.0,8.0-8.1 
MEM05 - Metal and Engineering Training PackageMetal and Engineering Training Package 3.0-7.0,8.0-8.1 
MSS11 - Sustainability Training PackageSustainability Training Package 1.0 
DEF12 - Defence Training PackageDefence Training Package 1.0-2.0 
LMT07 - Textiles, Clothing and Footwear Training PackageTextiles, Clothing and Footwear Training Package 3.1-4.0 

Qualifications that include this unit

CodeSort Table listing Qualifications that include this unit by the Code columnTitleSort Table listing Qualifications that include this unit by the Title columnUsage RecommendationRelease
MSA61108 - Advanced Diploma of Competitive ManufacturingAdvanced Diploma of Competitive ManufacturingSuperseded1-2 
LMT60507 - Advanced Diploma of Fashion and Textiles MerchandisingAdvanced Diploma of Fashion and Textiles MerchandisingSuperseded
ICP50110 - Diploma of Printing and Graphic Arts (Digital Production)Diploma of Printing and Graphic Arts (Digital Production)Superseded1-2 
MSS50111 - Diploma of Sustainable OperationsDiploma of Sustainable OperationsSuperseded
MSA41108 - Certificate IV in Competitive ManufacturingCertificate IV in Competitive ManufacturingSuperseded1-2 
PMB50107 - Diploma of Polymer TechnologyDiploma of Polymer TechnologySuperseded
MEM60111 - Advanced Diploma of EngineeringAdvanced Diploma of EngineeringSuperseded1-4 
MSA50108 - Diploma of Manufacturing TechnologyDiploma of Manufacturing TechnologyCurrent1-2 
MEM50211 - Diploma of Engineering - TechnicalDiploma of Engineering - TechnicalSuperseded1-3 
PMB60107 - Advanced Diploma of Polymer TechnologyAdvanced Diploma of Polymer TechnologySuperseded
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 10 of 18

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 080301 Business Management  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 080301 Business Management  05/May/2010 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not applicable.

Unit Descriptor

Unit descriptor 

This unit covers the skills needed to plan and implement a Just in Time (JIT) production system in manufacturing. It covers both the initial JIT implementation and also the ongoing improvement and implementation of the improved system.

Application of the Unit

Application of the unit 

In a typical scenario, an organisation decides to adopt JIT and so needs to plan and develop their JIT system. This unit covers the skills needed to both plan the implementation of JIT and also consult with employees, suppliers and customers regarding the change. This may require identification of training and other employee support as well as identifying possible logistical support.

It includes kanban  based JIT systems but uses JIT principles so that it is applicable to process manufacturing and other sectors and systems that are not suitable for a kanban type JIT implementation.

This unit primarily requires the application of skills associated with communication in gathering, analysing and applying information and consulting with stakeholders. Problem solving, initiative and enterprise, and planning and organising are required to determine an effective JIT system for the enterprise. This unit also requires aspects of self management and learning to ensure feedback and new learning is integrated into the JIT design.

This unit could be assessed concurrently with:

  • MSACMS601A Analyse and map a value chain , and/or
  • MSACMT650A Determine and improve process capability .

This unit is related to:

  • MSACMT221A Apply Just in Time (JIT ) procedures , and
  • MSACMT421A Facilitate a Just in Time  (JIT ) system 

which cover the lowest and intermediate skill levels in CM respectively.

Licensing/Regulatory Information

Not applicable.

Pre-Requisites

Prerequisite units 

MSACMC410A 

Lead change in a manufacturing environment 

Employability Skills Information

Employability skills 

This unit contains employability skills.

Elements and Performance Criteria Pre-Content

Elements describe the essential outcomes of a unit of competency.

Performance Criteria describe the performance needed to demonstrate achievement of the Element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the Range Statement. Assessment of performance is to be consistent with the Evidence Guide.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Design the JIT system/system improvements

1.1. Identify value chain  members

1.2. Consult with internal and external value chain members

1.3. Identify current storage/inventory in value chain

1.4. Determine flow authorisation indicators

1.5. Determine minimum and maximum production rate capability

1.6. Determine production lead time for products subject to JIT

1.7. Determine number of cards /bins  and number of units per card/bin

1.8. Draft workable procedures to implement JIT

2. Implement the JIT system/improvements

2.1. Consult with key internal stakeholders to develop solutions to JIT issues

2.2. Ensure all stakeholders have required JIT related skills and related issues have been resolved

2.3. Liaise with key external members of the value chain to develop solutions to JIT issues

2.4. Develop implementation plan for JIT

2.5. Determine key measures  of JIT

3. Monitor the JIT system

3.1. Monitor key measures of JIT

3.2. Regularly liaise with key stakeholders seeking areas for improvement

3.3. Identify areas in need of improvement

Required Skills and Knowledge

REQUIRED SKILLS AND KNOWLEDGE 

This section describes the skills and knowledge required for this unit.

Required skills 

  • reading
  • recording
  • communicating
  • planning
  • analysing
  • problem solving
  • negotiating

Required knowledge 

  • needs of value chain members
  • principles of JIT
  • reasons for delays/storages/inventories in the value chain and methods of reducing/eliminating them
  • methods of identifying skill gaps and methods of filling skill gaps
  • key business objectives associated with implementing JIT
  • principles of the manufacturing process relevant to the section/team
  • production data generated by the process and its application to JIT

Evidence Guide

EVIDENCE GUIDE 

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, the range statement and the assessment guidelines for this training package.

Overview of assessment requirements 

The person will be able to plan the initial introduction of JIT to an organisation or a process, or plan improvements to an existing JIT system.

What are the specific resource requirements for this unit ?

Access to an organisation using JIT.

What critical aspects of evidence are required to demonstrate competency in this unit ?

Evidence of the design, implementation and monitoring of a JIT system and the effective operation of the JIT system are required.

In what context should assessment occur ?

Assessment needs to occur in an organisation using JIT or by use of a suitable project or case study.

Are there any other units which could or should be assessed with this unit or which relate directly to this unit ?

This unit could be assessed concurrently with:

  • MSACMS601A Analyse and map a value chain , and /or 
  • MSACMT650A Determine and improve process capability .

This unit is related to:

  • MSACMT221A Apply Just in Time (JIT ) procedures , and 
  • MSACMT421A Facilitate a Just in Time  (JIT ) system 

which cover the lowest and intermediate skill levels in CM respectively.

What method of assessment should apply ?

Assessors must be satisfied that the person can consistently perform the unit as a whole, as defined by the Elements, Performance Criteria, skills and knowledge. A holistic approach should be taken to the assessment.

Assessors should gather sufficient, fair, valid, reliable, authentic and current evidence from a range of sources. Sources of evidence may include direct observation, reports from supervisors, peers and colleagues, project work, samples, organisation records and questioning. Assessment should not require language, literacy or numeracy skills beyond those required for the unit.

The assessee will have access to all techniques, procedures, information, resources and aids which would normally be available in the workplace.

The method of assessment should be discussed and agreed with the assessee prior to the commencement of the assessment.

What evidence is required for demonstration of consistent performance ?

Where evidence is gathered from the initial introduction of JIT to an organisation or a process, then this single project may generate sufficient evidence. Where evidence is gathered from continuous improvements to an existing JIT system, then it will be required from a range of improvements to generate sufficient evidence.

Range Statement

RANGE STATEMENT 

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Just In Time  (JIT )

Just In Time (JIT) is a production scheduling concept that calls for any item needed at a production operation, whether raw material, finished item, or anything in between, to be produced and available precisely when needed, neither a moment earlier nor a moment later.

Kanban 

Kanban - a card or sheet used to authorise production or movement of an item; when fully implemented, kanban (the plural is the same as the singular) operates according to the following rules:

  • all production and movement of parts and material take place only as required by a downstream operation, i.e. all manufacturing and procurement are ultimately driven by the requirements of final assembly or the equivalent
  • the specific tool which authorises production or movement is called a kanban. The word literally means card or sign, but it can legitimately refer to a container or other authorizing device. Kanban have various formats and content as appropriate for their usage (eg a kanban for a vendor is different than a kanban for an internal machining operation).

Kanban is typically applied to batch type operation and the production is measured in units produced. In continuous manufacturing organisations, production is measured in terms of production rate (eg kg/h, tonne/day) and rate is increased/decreased according to the flow authorisation which may be a kanban (eg ticket, order from a supplier) or may be a SCADA  signal from a remote facility (eg customer tank) saying that resupply is required or similar.

SCADA 

System Control and Data Acquisition (SCADA) is a general term applied to a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information personnel for action.

Value chain 

Competitive manufacturing organisations encompass the entire production system, beginning with the customer, and includes the product sales outlet, the final assembler, product design, raw material mining and processing and all tiers of the value chain (sometimes called the supply chain). Any truly 'competitive' system is highly dependent on the demands of its customers and the reliability of its suppliers. No implementation of competitive manufacturing can reach its full potential without including the entire 'enterprise' in its planning.

Flow authorisation indicator 

Flow authorisation indicator may be kanban bin, ticket or similar, or may be some other indicator of demand pull.

Pull system 

Pull system - a manufacturing planning system which makes to demand, rather than for stock or to a forecast.

Cards /bins 

The indicators used for production authorisation and may be physical cards or bins or some other suitable indicator.

Procedures 

Procedures include all work instructions, standard operating procedures, formulas/recipes, batch sheets, temporary instructions and similar instructions provided for the smooth running of the plant. They may be written, verbal, computer based or in some other form.

For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (eg Good Manufacturing Practice (GMP), Responsible Care) and government regulations.

Key measures 

Key measures may include inventory levels, lead time, IFOTIS delivery, productivity/production rate, other measures of pull through the value chain, quality.

IFOTIS refers to delivery of product In Full, On Time and In Specification.