Unit Descriptor
Unit descriptor |
This unit covers the establishment of the preconditions for the implementation of a change such as a 'step change' or a change resulting from a problem solving exercise such as a kaizen blitz. The unit can be applied to sub sections of an enterprise such as a team, area or department, or in the case of a small or medium sized manufacturer, to the whole enterprise. |
Application of the Unit
Application of the unit |
This unit is intended for team leaders and people with a similar sphere of influence/scope of authority and responsibility. It applies to individuals who are already familiar with change leadership in a competitive manufacturing environment through either previous study or industry experience. Where this is not the case MSACMC410A Lead change in a manufacturing environment may be completed to supply the necessary skills. Skills covered by this unit are applied in an organisation after a desired change has already been identified. This unit may also be applied in service organisations applying competitive manufacturing principles. |
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Prerequisite units |
||
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Define the change |
1.1. Determine the purpose of the change 1.2. Identify key change project personnel 1.3. Record the current state that the change is addressing 1.4. Develop a consensus view of the intended future state including indicators of a successful change 1.5. Develop an agreed statement of the solution 1.6. Identify the health, safety and environment (HSE) impacts of the change 1.7. Determine the scope of the change project including taking into account the impact of the solution on any codes of practice, standards, contracts, commercial or industrial agreements 1.8. Obtain sign off from key change project personnel |
2. Identify personnel required to implement the change and their roles |
2.1. Develop a high level change network map 2.2. Identify employees, suppliers or customers who may be required to implement the change 2.3. Identify other demands on these people during the change 2.4. Investigate priorities, synergies and conflicts 2.5. Take appropriate action to resolve conflicts |
3. Assess and manage the change related risks |
3.1. Identify organisational capacity for the change including available resources and ability to absorb any disruption during the change 3.2. Clarify specific risk dimensions for this change 3.3. Develop appropriate transition approach |
4. Build high level change plans |
4.1. Develop high level involvement plan 4.2. Develop high level communication plan to all stakeholders 4.3. Develop high level competency development plan for all implementers 4.4. Develop high level alignment plan |
5. Implement and sustain the change |
5.1. Implement change plans 5.2. Check change objectives have been met 5.3. Transfer ownership of post change operations from change agents where relevant 5.4. Ensure support structures are in place 5.5. Check alignments have been obtained 5.6. Check competencies have been developed and will be maintained 5.7. Ensure base line is defined for continuous improvement 5.8. Review project and capture learning from the project 5.9. Take action to sustain improvement by standardising |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
|
Required knowledge |
|
Evidence Guide
EVIDENCE GUIDE |
|
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
Demonstrates skills and knowledge required to:
In particular look for evidence of:
|
Context of and specific resources for assessment |
Assessment may occur on the job or in an appropriately simulated environment. Access is required to real or appropriately simulated situations, including work areas, materials and equipment, and to information on workplace practices and OHS practices. Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability. Access must be provided to appropriate learning and/or assessment support when required. Where applicable, physical resources should include equipment modified for people with disabilities. |
Method of assessment |
|
Guidance information for assessment |
Assessment processes and techniques must be culturally appropriate and appropriate to the language and literacy capacity of the candidate and the work being performed. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Change project personnel |
Change project personnel include:
|
Current state |
The current state is ideally defined by existing data. Where this is not available suitable proxies should be sought |
Codes of practice /standards |
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used |
Health , safety and environment (HSE ) |
All changes implemented should be at least neutral, or preferably beneficial, in their impact on health, safety and environment |
High level change network |
High level change network includes groups involved in the change and who need to be committed to the change and include:
|
Organisation |
Organisation includes:
|
Key change project personnel |
Key change project personnel include:
|
Sponsor |
Project sponsors include:
|
Cascading sponsor |
A cascading sponsor refers to:
A cascading sponsor works with delegated authority and responsibility |
Risks |
Risks include:
|
Organisation capacity |
Organisation capacity includes:
|
Risk dimensions |
Specific risk dimensions include:
|
Transition approach |
Transition approach will depend on the nature of the risks determined and will include:
|
High level involvement plans |
High level involvement plans aim to create ownership by involving groups in specific activities within defined constraints of:
The specific activities include:
|
Alignment plan |
Alignment plan ensures alignment and sustainability between:
|
Sustaining improvement |
Improvement may be sustained by including it in:
|
Team leader |
Team leader may include:
|
Unit Sector(s)
Unit sector |
CM Graduate |
Competency field
Competency field |
Co-requisite units