Unit of competency details

LMFFL2301A - Install lay flat vinyl floor coverings (Release 1)

Summary

Releases:
ReleaseStatusRelease date
1 1 (this release)Current 11/May/2009

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Supersedes and is equivalent to LMFFC2008A - Lay flat resilient flooringInstall lay flat vinyl floor coverings 12/May/2009
Is superseded by and equivalent to MSFFL2021 - Install lay flat vinyl floor coveringsSupersedes and is equivalent to LMFFL2301A Install lay flat vinyl floor coverings 09/Dec/2013

Training packages that include this unit

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 040321 Floor Coverings  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 040321 Floor Coverings  28/Apr/2009 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not applicable.

Unit Descriptor

Unit descriptor 

This unit covers the competency required to install lay flat vinyl floor coverings to single and connecting rooms including pattern matching seam cutting, joining and sealing.

Application of the Unit

Application of the unit 

This unit supports the attainment of skills and knowledge required for competent workplace performance in the wide variety of flooring technology operations. The competency applies to an on site environment and involves application of skills and knowledge at a sub-trade worker level. These skills and knowledge are to be used within the scope of the individual's job and authority.

Licensing/Regulatory Information

Not applicable.

Pre-Requisites

Prerequisite units 

Nil

Employability Skills Information

Employability skills 

This unit contains employability skills.

Elements and Performance Criteria Pre-Content

Elements describe the essential outcomes of a unit of competency.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Prepare for installation

1.1. Applicable legislative, OHS and organisational requirements relevant to installing lay flat vinyl floor coverings are verified and complied with

1.2. Instructions and/or plans are read and interpreted to identify process required to complete work tasks

1.3. Sub-floor condition is assessed for installation of lay flat vinyl flooring

1.4. Sub-floor is prepared for lay flat vinyl floor covering

1.5. Suitable adhesives, trims and accessories are selected

1.6. Tools, equipment and materials are selected and checked prior to use to ensure that they are appropriate for the work, serviceable and in a safe condition

1.7. Sequence of work is planned, including the starting point, to ensure efficiency and quality of installation

2. Set out materials

2.1. Lay flat vinyl coverings to be installed are checked against order

2.2. Lay flat vinyl floor coverings are acclimatised according to manufacturers' recommendations

2.3. Lay flat resilient floor coverings for fixing are organised and used in accordance with relevant safety management requirements

2.4. Working lines and starting point are established

3. Lay floor covering

3.1. Instructions and sequence for laying and fixing are followed

3.2. Lay flat vinyl floor coverings are laid out to meet directional sequence, pattern match, specification requirements and to minimise waste and joins as appropriate

3.3. Lay flat resilient floor coverings are accurately and clearly marked for cutting

3.4. Lay flat resilient floor coverings are cut to required pattern and shape with minimum waste of materials

3.5. Adhesives are applied (if required)

3.6. Seams are sealed

3.7. Completed installation is checked for flaws in installation and materials and faults rectified

4. Complete housekeeping

4.1. Unused materials are stored or recycled as required

4.2. Tools and equipment are cleaned and stored appropriately

4.3. Work area is cleaned and rubbish disposed of appropriately

4.4. Workplace documentation is completed

Required Skills and Knowledge

REQUIRED SKILLS AND KNOWLEDGE 

This section describes the skills and knowledge required for this unit.

Required skills 

  • collect, organise and understand information related to work orders, basic plans and safety procedures
  • communicate ideas and information to enable confirmation of work requirements and specifications, coordination of work with site supervisor, other workers and customers, and the reporting of work outcomes and problems
  • work with others and in a team by recognising dependencies and using cooperative approaches to optimise work flow and productivity
  • use pre-checking and inspection techniques to anticipate problems installing lay flat vinyl floor coverings to avoid re-work and wastage
  • recognise and respond to circumstances outside instructions or personal competence
  • plan and organise activities including the preparation and layout of the worksite and the obtaining of equipment and materials to avoid any back tracking, work flow interruptions or wastage
  • use mathematical ideas and techniques to correctly complete measurements, calculate area and estimate other material requirements
  • clarify and confirm work instructions
  • plan work within given task parameters
  • accept responsibility for given tasks
  • set, monitor and satisfy personal work goals
  • satisfy the competency requirements for the job
  • maintain current knowledge of:
  • tools and materials
  • installation techniques
  • seek learning opportunities
  • use the limited workplace technology related to the installing lay flat vinyl floor coverings including tools, equipment, calculators and measuring devices.

Required knowledge 

  • State or Territory OHS legislation, regulations, standards and codes of practice relevant to installing lay flat vinyl floor coverings
  • organisational and site standards, requirements, policies and procedures for installing lay flat vinyl floor coverings
  • environmental protection requirements
  • established communication channels and protocols
  • problem identification and resolution
  • types of tools and equipment and procedures for their safe use, operation and maintenance
  • characteristics of materials, products and defects
  • set up and operation of equipment
  • products assembly techniques
  • procedures for the recording, reporting and maintenance of workplace records and information
  • appropriate mathematical procedures for estimation and measurement
  • type, characteristics, uses and limitations of:
  • lay flat vinyl floor coverings
  • lay flat vinyl floor covering installation adhesives
  • types and uses of resilient floor covering installation tools and equipment
  • workplace safety system requirements related to lay flat vinyl floor covering installation
  • characteristics and requirements of sub-floor preparation
  • work flow in relation to cutting and laying lay flat vinyl floor coverings

Evidence Guide

EVIDENCE GUIDE 

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit 

  • Comply with legislation, regulations, standards, codes of practice and established safe practices and procedures for installing lay flat vinyl floor covering
  • Interpret work order and locate and apply relevant information
  • Apply safe handling requirements for equipment, products and materials, including use of personal protective equipment
  • Follow work instructions, operating procedures and inspection practices to:
  • minimise the risk of injury to self and others
  • prevent damage to goods, equipment and products
  • maintain required production output and product quality
  • Cut, lay and fix lay flat vinyl floor coverings to a single room including pattern match at seams and cross joins, using free-hand, template and scribing method
  • Cut, lay and fix lay flat vinyl floor coverings to connecting rooms, including pattern match at seams and cross joins, using free-hand, template and scribing method
  • Cut, lay and fix lay flat vinyl floor coverings to a single room with a link up, including pattern match at seams and cross joins, using free-hand, template and scribing method
  • Work effectively with others
  • Modify activities to cater for variations in workplace contexts and environment

Context of , and specific resources for assessment 

  • The application of competency is to be assessed in the workplace or realistically simulated workplace
  • Assessment is to occur under standard and authorised work practices, safety requirements and environmental constraints
  • Assessment of essential underpinning knowledge, other than confirmatory questions, will usually be conducted in an off-site context
  • Assessment is to comply with relevant regulatory or Australian Standards requirements
  • The following resources should be made available:
  • workplace location or simulated workplace
  • materials and equipment relevant to installing lay flat vinyl floor coverings
  • specifications and work instructions

Method of assessment 

Assessment must satisfy the endorsed assessment guidelines of the Furnishing Industry Training Package

Assessment methods must confirm consistency and accuracy of performance (over time and in a range of workplace relevant contexts) together with application of underpinning knowledge

Assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application

Assessment may be applied under project related conditions (real or simulated) and require evidence of process

Assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance, but is able to be transferred to other circumstances

Assessment may be in conjunction with assessment of other units of competency

Range Statement

RANGE STATEMENT 

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Legislative requirements 

  • are to be in accordance with applicable legislation from all levels of government that affect organisational operation. Requirements may include but not be limited to award and enterprise agreements, industrial relations, Australian Standards, confidentiality and privacy, OHS, the environment, equal opportunity, anti-discrimination, relevant industry codes of practice, duty of care and heritage

OHS requirements 

  • are to be in accordance with Commonwealth, State or Territory legislation and regulations, organisational safety policies and procedures. Requirements may include but not be limited to the use of personal protective equipment and clothing, fire fighting equipment, First Aid equipment, hazard and risk control and elimination, control of hazardous materials and substances, manual handling including lifting and carrying

Organisational requirements 

  • may include but are not limited to legal, organisational and site guidelines, policies and procedures relating to own role and responsibility, quality assurance, procedural manuals, quality and continuous improvement processes and standards, OHS, emergency and evacuation, ethical standards, recording and reporting, access and equity principles and practices, equipment use, maintenance and storage, environmental management (waste disposal, recycling and re-use guidelines)

Lay flat vinyl floor coverings 

  • may include encapsulated glass fibre, in laid and rotogravure

Instructions 

  • Workplace procedures relating to the use and operation of tools and equipment
  • Workplace instructions, including job sheets, plans, drawings and designs
  • Workplace procedures relating to reporting and communications
  • Manufacturer instructions for the use of equipment and materials

Adhesives 

  • may include plasticised and rubber resin acrylic and water based and solvent based contact adhesive

Tools and equipment 

  • are to include utility knife, straight edge, square, chalk and chalk-line, lead pencils (HB and F), tape measure, hacksaw, notched trowel, hammer, scribing bar, divider, roller, rubber mallet, paint brush and bucket, spatula knife, trolley and wall trimmer

Materials 

  • are to include but are not limited to lay flat vinyl floor coverings, skirting, reducing and edge strips, double sided tape, pattern paper and adhesives

Unit Sector(s)

Unit sector 

Flooring Technology

Competency field

Competency field 

Resilient

Co-requisite units

Co-requisite units 

Training component details
The following details are displayed for each different NRT:-

Training packages

- Training package details
- Training package components

Qualifications

- Qualification details
- Qualification components

Accredited courses

- Accredited course details

Modules

- Module details

Units of competency

- Units of competency details
- Unit components

Skill sets

- Skill set details
- Skill set components

Click on the Export link to export the NRT information to MS Word or PDF.

Click on the Manage notification link to create or change a notification for this NRT.

When selecting the Display history check box a set of tables will appear displaying a log of historical values describing what has changed and when over time.

If you have access to make changes to an NRT, click on the Edit link on the upper right hand side of the summary box.