Unit of competency details

LGAWORK502A - Prepare detailed works project documentation (Release 2)

Summary

Usage recommendation:
Deleted
The Deleted usage recommendation was implemented on 13 June 2017 to describe training components that have no replacement. Enrolments in training components and statements of attainment or qualifications issued before 13 June 2017 are valid. For any components marked as deleted after 13 June 2017, the applicable transition/teach-out periods apply. For specific questions regarding the enrolment, delivery or issuance of a statement of attainment/qualification, please contact your training regulator.
Mapping:
MappingNotesDate
DeletedDeleted from LGA04 Local Government Training Package09/Feb/2021

Releases:
ReleaseRelease date
2 (this release) 11/Sep/2012
(View details for release 1) 13/Aug/2009

Qualifications that include this unit

CodeSort Table listing Qualifications that include this unit by the Code columnTitleSort Table listing Qualifications that include this unit by the Title columnUsage RecommendationRelease
LGA50404 - Diploma of Local Government (Operational Works)Diploma of Local Government (Operational Works)Deleted1-2 
NWP50107 - Diploma of Water OperationsDiploma of Water OperationsDeleted1-2 
NWP50118 - Diploma of Water Industry OperationsDiploma of Water Industry OperationsCurrent1-3 
NWP50715 - Diploma of Water Industry OperationsDiploma of Water Industry OperationsSuperseded
RII50409 - Diploma of Civil Construction ManagementDiploma of Civil Construction ManagementSuperseded1-3 
RII50413 - Diploma of Civil Construction ManagementDiploma of Civil Construction ManagementSuperseded1-4 
RII50415 - Diploma of Civil Construction ManagementDiploma of Civil Construction ManagementSuperseded1-3 
RII50420 - Diploma of Civil Construction ManagementDiploma of Civil Construction ManagementCurrent1-3 
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 8 of 8

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 080315 Project Management  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 080315 Project Management  02/Jun/2003 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

LGAWORK502A Release 2: Layout adjusted.

LGAWORK502A Release 1: Primary release.

Unit Descriptor

This unit covers preparing relevant project documentation including specifications, key invoices and estimates.

Application of the Unit

This unit supports the attainment of skills and knowledge required for competent workplace performance in councils of all sizes. Knowledge of the legislation and regulations within which councils must operate is essential. The unique nature of councils, as a tier of government directed by elected members and reflecting the needs of local communities, must be appropriately reflected.

Licensing/Regulatory Information

Not applicable.

Pre-Requisites

Not applicable.

Employability Skills Information

This unit contains employability skills.

Elements and Performance Criteria Pre-Content

Elements describe the essential outcomes of a Unit of Competency

Performance criteria describe the required performance needed to demonstrate achievement of the element. Where bold italicised  text is used, further information is detailed in the Range Statement. Assessment of performance is to be consistent with the Evidence Guide.

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1 Prepare design program 

1.1 Design elements are listed to determine the scope and purpose of the design.

1.2 Time constraints and financial limitations are identified.

1.3 Appropriate technical, physical and human resources are assigned to the project.

1.4 Complementary works are identified to enable an efficient design program to be prepared.

2 Undertake design and prepare working drawings 

2.1 Available information is reviewed and specifications are identified.

2.2 Design manuals  are used to ensure the design complies with all statutory and council requirements .  

2.3 Working drawings that comply with the design brief are prepared and recorded.

3 Prepare work specifications 

3.1 Complete and detailed works specifications are prepared at a level consistent with council and relevant standards.

3.2 Quality assurance methods are applied to the preparation of works specifications.

3.3 Works specifications are prepared that complement  working drawings.

3.4 Works specifications provide detail on methods, standards, materials, products and contractors as applicable.

4 Prepare detailed estimate 

4.1 Detail drawings are utilised to prepare an accurate bill of quantities.

4.2 Competitive rates for provision of materials and services are obtained.

4.3 Primary cost items are specified and costed.

4.4 An estimate for contingencies  is made within prepared estimates.

4.5 The cost of project support resources is included in detailed estimates.  

Required Skills and Knowledge

This describes the essential skills and knowledge and their level, required for this unit

Required Skills 

  • interpreting relevant acts, regulations, codes, policies, procedures and standards
  • interpreting engineering design criteria
  • engineering drafting
  • calculating weight, volume, ratio and quantity

Required Knowledge 

  • federal and state government acts
  • local government regulations
  • design standards and specifications
  • drawing standards and specifications
  • interpretation and analysis of resources costing

Evidence Guide

Overview of assessment requirements 

A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit must be demonstrated.

Critical aspects of evidence to be considered 

A range of design criteria is included.

Drawings are undertaken to meet established standards.

Works specifications are prepared.

Estimates are detailed and include contingencies.

Context of assessment 

May be assessed through:

  • on the job
  • simulated workplace environment
  • written assignment
  • short-answer test
  • oral questioning
  • observation
  • or any combination of the above

Relationship to other units (prerequisite or co-requisite units )

To enable holistic assessment this unit may be assessed with other units that form part of the job role.

Method of assessment 

The following assessment methods are suggested:

  • observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies
  • written and/or oral questioning to assess knowledge and understanding
  • completion of workplace documentation
  • third-party reports from experienced practitioners
  • completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor

Evidence required for demonstration of consistent performance 

Evidence will need to be gathered over time across a range of variables.

Resource implications 

In accordance with a range of variable requirements.

Range Statement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised  wording in the Performance Criteria is detailed below.

Design manuals  may include:

  • building regulations
  • Australian standards
  • state road authority
  • design manuals
  • Austroad design manuals
  • reference texts
  • council or authority standards
  • quality assurance manuals
  • water and sewerage authority and design or industry standards

Council requirements  may include:

  • works specifications
  • design procedures

Complementary works  may include:

  • other works that can be carried out effectively and cost efficiently whilst resources are available

Contingencies  may include:

  • weather conditions
  • industrial relations
  • latent conditions
  • additional supervision
  • variation in materials cost and availability

Estimates  may include:

  • day labour
  • contract labour

Unit Sector(s)

Operational Works