This unit describes the skills and knowledge required to inspect critical aspects of electronic systems and replace and dispose of items performing below specification and required operating levels.
It applies to individuals with the capacity to apply skills in electrical, workplace safety and power tools, working as technicians on site and from remote locations.
This work does not include major servicing of equipment or repair due to breakdowns.
No licensing, legislative or certification requirements apply to this unit at the time of publication.
Unit Sector
Telecommunications – Telecommunications Network Engineering
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Prepare to maintain system |
1.1 Consult with customer or property owner to arrange site access as required 1.2 Plan schedule of routine preventive maintenance for electronic system based on recommended maintenance periods according to manufacturer handbooks and specifications 1.3 Report to appropriate person the impact of proposed maintenance activities on customer service delivery 1.4 Confirm equipment is accessible and correctly set-up for onsite preventive maintenance activities and for remote interrogation if required 1.5 Confirm alarms are functioning according to manufacturer specifications and enterprise guidelines 1.6 Take corrective action when anomalies or faults are detected, according to enterprise guidelines and manufacturer specifications |
2. Undertake preventive maintenance routines on site and remotely |
2.1 Conduct preventive maintenance according to planned schedule 2.2 Report to appropriate person any instances where maintenance activities cannot be fully met or where there are identified defects outside the planned schedule 2.3 Verify equipment is functioning against expected operational parameters to confirm operational status 2.4 Take corrective action when faults are detected, according to enterprise guidelines and manufacturer specifications 2.5 Escalate to next level of support as required, where preventive maintenance activity falls outside own level of expertise 2.6 Dispose of onsite waste materials according to safe working practices and approved procedures |
3. Make recommendations and update records |
3.1 Record results of routine tests and make recommendations 3.2 Store records according to enterprise guidelines |
Foundation Skills
This section describes those language, literacy, numeracy and employment skills that are essential to performance, but not explicit in the performance criteria.
Skill |
Description |
Reading |
|
Writing |
|
Oral Communication |
|
Numeracy |
|
Navigate the world of work |
|
Interact with others |
|
Get the work done |
|
Unit Mapping Information
ICTTEN320 Commission an electronic unit supersedes and is equivalent to ICTTEN306 Commission an electronic unit.
Links
Companion Volume Implementation Guides are available from VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=a53af4e4-b400-484e-b778-71c9e9d6aff2