This unit of competency specifies the outcomes required to install physical termite management systems, including management systems that combine physical and chemical characteristics. The unit covers the ability to assess methods of construction of different premises, as well as techniques required to prevent termites gaining concealed access to a completed construction.
The unit covers applying a thorough understanding of client requirements and company information in order to install the systems. The selection of appropriate equipment, materials and methods is essential for performing the task safely and efficiently. These work functions would be carried out according to company guidelines and statutory requirements.
The unit supports pest management technicians responsible for applying physical termite management systems in both pre- and post-construction stages, in domestic, commercial and industrial buildings.
Licensing, legislative, regulatory or certification requirements apply to pest management in some States. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
Pre-requisite Unit
Nil
Unit Sector
Pest management
Elements and Performance Criteria
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions. |
||
1. |
Plan for installation process. |
1.1. |
Installation requirements for termite management system are identified from work order, drawings and supervisor’s instructions. |
1.2. |
Work site plan is reviewed and installation specification is selected to prevent termite access according to work order and company and compliance requirements . |
||
1.3. |
Client is advised of installation procedure according to work order and company requirements. |
||
1.4. |
Quality assurance requirements are identified and applied to planning according to company and manufacturer requirements. |
||
1.5. |
Materials are selected and located in readiness for installation according to manufacturer specifications, and health and safety, company and manufacturer requirements. |
||
1.6. |
Equipment and tools consistent with installation requirements are selected, serviceability is checked, and faults are reported to appropriate persons according to manufacturer specifications and company and compliance requirements. |
||
2. |
Access and assess site. |
2.1. |
Work site is accessed according to client and company requirements. |
2.2. |
Installation method is reviewed according to work order and company and manufacturer requirements, and issues are clarified with appropriate persons. |
||
2.3. |
Previous trades work is checked for possible effect on proposed installation of termite management system according to company and manufacturer requirements. |
||
2.4. |
Work site is assessed for access during installation work and safety issues according to company and compliance requirements. |
||
3. |
Prepare site for installation. |
3.1. |
Hazards are identified and risks controlled at the work site according to company and compliance requirements. |
3.2. |
Usage pattern of work site is determined to ensure safety of personnel and efficient use of equipment and tools. |
||
3.3. |
Factors affecting completion of work order are identified and appropriate persons promptly advised. |
||
4. |
Prepare equipment. |
4.1. |
Suitable personal protective equipment (PPE) is selected and fitted according to manufacturer specifications and company and compliance requirements. |
4.2. |
Equipment and tools are set up according to manufacturer specifications and company and compliance requirements. |
||
4.3. |
Equipment and tools are adjusted according to manufacturer specifications to suit operator requirements. |
||
5. |
Install physical management system. |
5.1. |
Termite management system is installed to termite access points according to work order, manufacturer specifications and company requirements. |
5.2. |
Installation of termite management system is checked according to company and manufacturer requirements. |
||
6. |
Restore work site and complete documentation. |
6.1. |
Equipment, tools and waste are collected and removed according to work order, manufacturer specifications and company and compliance requirements. |
6.2. |
Work site is restored according to work order, client requests and company requirements. |
||
6.3. |
Equipment, tools and PPE are cleaned according to manufacturer specifications and company and compliance requirements. |
||
6.4. |
Equipment, tools and PPE are safety checked and required maintenance is recorded according to manufacturer specifications and company and compliance requirements. |
||
6.5. |
Cleaned equipment, tools and PPE are stored according to company requirements. |
||
6.6. |
Collected waste is disposed of according to work order, manufacturer specifications and company and compliance requirements. |
||
6.7. |
Client records are updated and regulatory and company documentation is completed and distributed according to company and compliance requirements. |
Foundation Skills
This section describes the language, literacy, numeracy and employment skills essential to performance in this unit but not explicit in the performance criteria. |
|
Skill |
Performance feature |
Learning skills to: |
|
Numeracy skills to: |
|
Oral communication skills to: |
|
Reading skills to: |
|
Writing skills to: |
|
Planning and organising skills to: |
|
Range of Conditions
This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below. |
|
Installation requirements must include: |
|
Termite management system must include one of the following: |
|
Compliance requirements must include: |
|
Appropriate persons must include one or more of the following: |
|
Previous trades work must include one or more of the following: |
|
Hazards to be considered must include: |
|
Personnel must include: |
|
Personal protective equipment must include: |
|
Unit Mapping Information
CPPPMT3042A Install physical termite barriers
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=6f3f9672-30e8-4835-b348-205dfcf13d9b