Modification History
Not Applicable
Unit Descriptor
Unit descriptor |
This unit of competency specifies the outcomes required to design steam distribution systems, including sizing, material selection, and preparation and specification of steam distribution system plans. |
Application of the Unit
Application of the unit |
This unit of competency supports development of skills and knowledge required for competent workplace performance in a consultancy or supervisory capacity in relation to plumbing services and hydraulics. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
Nil |
|
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Evaluate design parameters. |
1.1. Scope of work is established for steam distribution systems. 1.2. Design requirements are determined from plans, specifications and client brief. 1.3. Cost -benefit analysis is conducted comparing a range of materials and system designs. 1.4. Statutory and regulatory requirements and Australian and New Zealand standards for the design of steam distribution systems are analysed and applied. 1.5. Manufacturer requirements and trade and technical manuals are interpreted. 1.6. Additional research, including a desktop study , is conducted to outline design parameters. 1.7. Performance requirements are established. |
2. Plan and detail system components. |
2.1. Layout of pipework systems and type and location of fittings and valves are planned. 2.2. Pipe size calculations are performed for a range of applications. 2.3. Steam appliances are specified, steam consumption is calculated and boilers required are sized and specified. 2.4. Steam circuits are detailed and distribution pressures for a range of applications are specified. 2.5. Steam trap types and their operation are specified and detailed. 2.6. Steam injection systems are specified. 2.7. Insulation is specified. 2.8. Pipe fixings are designed for a range of applications. 2.9. Approved materials , jointing methods and all installation requirements for steam distribution systems are specified. |
3. Design and size systems. |
3.1. Steam distribution systems and steam circuits are designed for a range of applications. 3.2. Steam distribution systems are designed and sized using computer software packages. |
4. Prepare documentation. |
4.1. Plans are prepared for a range of steam distribution systems. 4.2. Specification for a steam distribution system is prepared. 4.3. Testing and commissioning schedule is prepared. 4.4. Operation and maintenance manual is produced. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills for this unit are:
|
Required knowledge |
Required knowledge for this unit is:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to provide evidence of:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards' requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Scope of work includes: |
|
Design requirements include: |
|
Cost -benefit analysis includes: |
|
Statutory and regulatory requirements and Australian and New Zealand standards include: |
|
Manufacturer requirements include: |
|
Desktop study includes: |
|
Performance requirements include: |
|
Layout of pipework systems : |
|
Fittings and valves include: |
|
Pipe size calculations include: |
|
Steam appliances : |
|
Boilers : |
|
Steam circuits include: |
|
Steam trap types and their operation : |
|
Steam injection includes: |
|
Insulation : |
|
Pipe fixings include: |
|
Materials include: |
|
Jointing methods include: |
|
Installation requirements include: |
|
Designed includes: |
|
Plans may include: |
|
Specification includes: |
|
Testing includes: |
|
Commissioning schedule includes: |
|
Operation and maintenance manual includes: |
|
Unit Sector(s)
Unit sector |
Plumbing and services |
Co-requisite units
Co-requisite units |
Nil |
|
Functional area
Functional area |