Modification History
Minor editorial changes to performance criteria, required skills and knowledge, range statement and critical aspects
Equivalent to CPCPDR4012A
Unit Descriptor
This unit of competency specifies the outcomes required to design, size and document the layout of surface and sub-soil stormwater drainage systems up to legal points of discharge.
It covers the preparation for the planning, identification and confirmation of system specifications and requirements, the planning of the system layout and work finalisation processes, including records and documentation.
Application of the Unit
Site location for application of the plan will be residential and commercial, and may be a new work site or an existing structure being renovated, extended, restored or maintained.
Licensing/Regulatory Information
In some jurisdictions, this unit of competency may form part of accreditation, licensing, legislative, regulatory or certification requirements.
Pre-Requisites
Nil
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
1 |
Prepare for planning. |
1.1 |
Nature and scope of the planning task are identified and confirmed. |
1.2 |
Work health and safety (WHS) and environmental requirements associated with installation of stormwater drainage systems are adhered to throughout the work. |
||
1.3 |
Work is organised and sequenced in conjunction with others involved in or affected by the work. |
||
1.4 |
Tools and equipment required for planning, sizing and documenting the layout of stormwater drainage systems, including personal protective equipment, are selected and checked for serviceability. |
||
1.5 |
Work area in which planning process is to be conducted is prepared. |
2 |
Identify system requirements. |
2.1 |
Information and specifications for required work are obtained and confirmed, if necessary by site inspection. |
2.2 |
Regulations and Australian standards relevant to the work are consulted and applied to all aspects of the work. |
||
2.3 |
Design criteria are determined from relevant Australian standards and proposed method of installation. |
||
2.4 |
Stormwater catchment and flow requirements are identified. |
||
2.5 |
Stormwater pipe size is determined to conform to regulatory authorities’ main or street kerb and relevant Australian standards. |
||
2.6 |
Stormwater retention pit size, silt and flotation arrestor pit size, rainwater tank size and stormwater overflow discharge locations are determined to suit job requirements. |
||
2.7 |
System type is selected to suit collection and disposal requirements. |
||
2.8 |
Sustainability principles and concepts are observed when preparing for and undertaking work process. |
3 |
Design system layout. |
3.1 |
Layout of stormwater drainage system is planned according to plans, specifications, relevant Australian standards and workplace procedures. |
3.2 |
Stormwater disposal system is specified according to job requirements. |
||
3.3 |
Materials required are specified and optimised from proposed design according to relevant Australian standards. |
||
3.4 |
Plans are recorded according to statutory and regulatory authorities’ and workplace requirements. |
4 |
Restore work area. |
4.1 |
Work area is restored according to workplace procedures. |
4.2 |
Tools and equipment used in the process are refurbished and left according to workplace procedures. |
||
4.3 |
Information is accessed and documentation, including work backup, is completed according to workplace requirements. |
Required Skills and Knowledge
This section describes the skills and knowledge required for this unit. |
Required skills |
|
Required knowledge |
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to provide evidence of:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards’ requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Work health and safety is to be according to commonwealth, state and territory legislation and regulations and may include: |
|
Environmental requirements cover water quality management and may include: |
|
Stormwater drainage systems will: |
|
Tools and equipment may include: |
|
Information relating to stormwater disposal plans may include: |
|
Sustainability principles and concepts : |
|
Materials may include: |
|
Statutory and regulatory authorities include: |
|
Unit Sector(s)
Competency field |
Drainage |
Unit sector |
Plumbing and services |
Custom Content Section
Not applicable.