This unit of competency specifies the outcomes required to design complex cold water distribution systems in multi-storey buildings, including upfeed, downfeed, pumped systems and storage regulations. |
Application of the Unit
Application of the unit |
This unit of competency supports development of skills and knowledge required for competent workplace performance in a consultancy or supervisory capacity in relation to plumbing services and construction hydraulics. Application of the unit is relevant to multi-storey residential, commercial and industrial buildings with or without connection to reticulated water supply. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
Nil |
|
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Evaluate design parameters. |
1.1. Scope of work is established for the distribution of complex cold water systems for wide span and high-rise building projects. 1.2. Design requirements are determined from plans, specifications and client briefs. 1.3. Cost -benefit analysis is conducted, comparing a range of pipe materials and system designs. 1.4. Statutory and regulatory requirements for the design of complex cold water distribution systems are interpreted. 1.5. Australian and New Zealand standards for the design of complex cold water distribution systems are analysed and applied. 1.6. Manufacturer requirements and trade and technical manuals are interpreted. 1.7. Additional research, including a desktop study , is conducted to outline design parameters. 1.8. Flow and pressure tests are conducted. 1.9. Performance requirements are established. |
2. Plan and detail system components. |
2.1. Layout of pipework systems and type and location of fittings and valves are planned. 2.2. Type, location and requirements for backflow prevention devices are detailed. 2.3. Flush valve system types and operation are specified. 2.4. Pipe sizes, velocities, flows and pressures are calculated for a range of applications. 2.5. Cold water system components are detailed or designed. 2.6. Pump, pump controls and pumproom requirements are sized and detailed. 2.7. Approved materials , jointing methods and installation requirements for complex cold water distribution systems are specified. |
3. Design and size systems. |
3.1. Complex cold water distribution systems are designed for a range of wide span and high-rise building applications. 3.2. Flush valve distribution systems are designed. 3.3. Range of delivery systems is designed. 3.4. Complex cold water distribution systems are designed and sized using computer software packages. |
4. Prepare documentation. |
4.1. Plans are prepared for a range of complex cold water distribution systems. 4.2. Specification for a cold water distribution system is prepared. 4.3. Testing and commissioning schedule is prepared. 4.4. Operation and maintenance manual is produced. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills for this unit are:
|
Required knowledge |
Required knowledge for this unit is:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment providing that simulated or project-based assessment techniques fully replicate plumbing and services workplace conditions, materials, activities, responsibilities and procedures. It may be assessed on its own or as part of an integrated assessment activity involving effective performance and application of drainage principles and detailing of system components used in the drainage industry. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to provide evidence of:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards' requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Scope of work : |
|
Design requirements may include: |
|
Cost -benefit analysis may include: |
|
Statutory and regulatory requirements may include: |
|
Australian and New Zealand standards may include: |
|
Manufacturer requirements may include: |
|
Desktop study can include collection and interpretation of existing data for design purposes from: |
|
Flow and pressure tests include: |
|
Performance requirements may include: |
|
Layout of pipework systems may include: |
|
Fittings and valves may include: |
|
Backflow prevention devices may include: |
|
Flush valve system types may include: |
|
Cold water system components cover: |
|
Pump , pump controls and pumproom requirements may include: |
|
Materials include: |
|
Jointing methods may include: |
|
Installation requirements include: |
|
Delivery systems may include: |
|
Plans include: |
|
Specification may include: |
|
Testing may include: |
|
Commissioning schedule may include: |
|
Operation and maintenance manual may include: |
|
Unit Sector(s)
Unit sector |
Plumbing and services |
Co-requisite units
Co-requisite units |
Nil |
|
Functional area
Functional area |