Unit of competency
Modification History
Release 1.
This version first released with CPC Construction, Plumbing and Services Training Package Version 2.
Revised unit of competency. Replaces superseded equivalent CPCCWC3004A Install suspended ceilings.
Application
This unit of competency specifies the outcomes required to install exposed and concealed suspended ceilings. It covers planning and preparing for work, setting out and installing the ceiling suspension system, installing lining material, and completing clean-up activities.
The unit supports the work of wall and ceiling lining and shopfitting workers, as well as other construction workers who install suspended ceilings. It applies to residential and commercial construction projects.
No licensing, legislative, regulatory, or certification requirements apply to this unit of competency at the time of endorsement.
Pre-requisite Unit
Nil
Competency Field
Wall and ceiling
Unit Sector
Construction
Elements and Performance Criteria
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions. |
||
1. |
Plan and prepare. |
1.1. |
Job requirements are obtained, confirmed and applied to planning. |
1.2. |
Site and task work health and safety (WHS) requirements are confirmed with relevant personnel and applied to planning. |
||
1.3 |
Site is inspected, and conditions and hazards are identified and reported as required. |
||
1.4 |
Sequence of work is identified and scheduled according to job requirements. |
||
1.5. |
Tools and equipment are selected to carry out tasks according to job requirements, checked for serviceability, and faults are rectified or reported before starting work. |
||
1.6. |
Materials and their quantities required for the work are identified and calculated according to job requirements. |
||
1.7. |
Materials are obtained, prepared, safely handled and located ready for use. |
||
2. |
Set out suspension system. |
2.1. |
Ceiling grid is set out according to job drawings and manufacturer specifications. |
2.2. |
Alignment levels for ceiling are set out as shown on job drawings. |
||
3. |
Install suspension system. |
3.1. |
Suspension rods are fixed to underside of soffit and structural members with masonry anchors, bolts and screws at prescribed centres according to manufacturer instructions. |
3.2. |
Suspended framework is assembled and connected to suspension rods according to job specifications and manufacturer instructions. |
||
3.3. |
Suspension system is fastened, checked for looseness and rattles, and secured as required. |
||
3.4. |
Bridging framework is fixed to both sides of service ducts to support suspension system. |
||
4. |
Install lining materials. |
4.1. |
Lining materials are installed according to design pattern set out in job drawings and specifications. |
4.2. |
Edges of lining materials are cut and concealed to match pre-finished edges. |
||
4.3. |
Openings and penetrations are provided as shown in job drawings. |
||
4.4. |
Trims and beads are fixed at junctions with other building elements and surfaces, as shown in job drawings. |
||
5. |
Clean up. |
5.1. |
Work area is cleared and materials disposed of, reused or recycled according to legislation, regulations, codes of practice and job specifications. |
5.2. |
Tools and equipment are cleaned, checked, maintained and stored according to manufacturer recommendations and standard work practices. |
Foundation Skills
This section describes the language, literacy, numeracy and employment skills essential to performance in this unit but not explicit in the performance criteria. |
|
Skill |
Performance feature |
Learning skills to: |
|
Numeracy skills to: |
|
Oral communication skills to: |
|
Reading skills to: |
|
Writing skills to: |
|
Problem-solving skills to: |
|
Range of Conditions
This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below. |
|
Job requirements must include: |
|
Tools and equipment must include at least ten of the following: |
|
Materials must include four of more of the following: |
|
Suspension system must include: |
|
Support structures must include: |
|
Openings and penetrations must include those for: |
|
Unit Mapping Information
CPCCWC3004A Install suspended ceilings