Modification History
Not Applicable
Unit Descriptor
Unit descriptor |
This unit specifies the outcomes required to prepare plans and specifications and coordinate the planning phase of monumental construction in cemeteries. |
Application of the Unit
Application of the unit |
This unit of competency supports the achievement of skills and knowledge to plan stone monument construction, which may include working with others and as a member of a team. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
||
CPCCOHS2001A |
Apply OHS requirements, policies and procedures in the construction industry |
|
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan and prepare. |
1.1. Work instructions and operational details are obtained using relevant information , confirmed and applied for planning and preparation purposes. 1.2. Safety (OHS ) requirements are followed in accordance with safety plans and policies. 1.3. Signage and barricade requirements are identified and implemented. 1.4. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements . 1.5. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. 1.6. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority requirements, and are applied. |
2. Identify design requirements for various monuments. |
2.1. Range of monuments covered by AS4204 Headstones and cemetery monuments, and features and components involved in monumental construction are identified and applied. 2.2. Legislation, regulations and codes relating to masonry work are identified and site features influencing design are applied from site visit or report. |
3. Prepare plans and specifications for construction and installation. |
3.1. Foundation design is selected in accordance with AS4204, job safety analysis (JSA) and safe work method statements, proposed monument and foundations. 3.2. Materials are selected in accordance with regulations, site conditions and customer requirements. 3.3. Drawings and specifications are prepared to requirements of approving authority, where applicable. |
4. Check details, edit drawings and specifications for submission. |
4.1. Specifications and drawing details are checked to ensure consistency with client brief and regulatory authority requirements. 4.2. Documentation and drawings are accurately copied and distributed. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills for this unit are:
|
Required knowledge |
Required knowledge for this unit is:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to design and plan installation of a stone monument to a client's brief, providing evidence of the ability to:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards' requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Information includes: |
|
Planning and preparation include: |
|
Safety (OHS ) is to be in accordance with state and territory legislation and regulations and project safety plan and may include: |
|
Quality requirements include: |
|
Materials include: |
|
Environmental requirements include: |
|
Statutory and regulatory authority includes: |
|
Design includes: |
|
Unit Sector(s)
Unit sector |
Construction |