Modification History
Not Applicable
Unit Descriptor
Unit descriptor |
This unit of competency specifies the outcomes required to install pre-cast decorative mouldings to masonry, plasterboard and fibre cement sheets. It includes planning and preparation for work; preparation of the work area; measuring, cutting and fixing of cast plaster; finishing junctions for painting; and completion of post work clean-up activities. |
Application of the Unit
Application of the unit |
This unit supports the attainment of skills and knowledge to install pre-cast decorative mouldings to a range of construction surfaces, which includes working with others and as a member of a team. |
Licensing/Regulatory Information
Not Applicable
Pre-Requisites
Prerequisite units |
||
CPCCOHS2001A |
Apply OHS requirements, policies and procedures in the construction industry |
|
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Plan and prepare. |
1.1. Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information , confirmed and applied to the scope of work performed. 1.2. Safety (OHS ) requirements are followed in accordance with safety plans and policies. 1.3. Signage and barricade requirements are identified and implemented. 1.4. Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. 1.5. Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements . 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied. |
2. Prepare work area for application processes. |
2.1. Work area and substrate are prepared for installation of pre-cast mouldings according to plans and specifications. 2.2. Substrate is checked for conformance in accordance with the relevant Australian standard and appropriate fixing methods . |
3. Fix and stop pre-cast moulded archways. |
3.1. Plasterboard wall sheets are confirmed to be in accordance with plans and specifications. 3.2. Archway profile is set out and cut to architect's drawings and specifications. 3.3. Timber arch soffit templates are cut and fixed to position. 3.4. Infill moulding is fixed to arch soffit and reveals of opening. 3.5. Arch is stopped in accordance with job specifications and required level of finish. |
4. Fix and stop plaster panelled ceiling. |
4.1. Ceiling battens are positioned and spaced for cornice margins and flush-mounted panels. 4.2. Panels are located on ceiling, and levelled, lined up and fastened into position in accordance with approved specification. 4.3. Jointing is finished to specification. |
5. Fix ornamental mouldings. |
5.1. Ornamental mouldings are measured and cut to specification. 5.2. Ornamental mouldings are fixed by fastening or bonding with adhesive, straight and level to architect's specifications. 5.3. Mouldings are finished, including straight stoppings and finishing mitres to specification. |
6. Clean up. |
6.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. 6.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills for this unit are:
|
Required knowledge |
Required knowledge for this unit is:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
|
Context of and specific resources for assessment |
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints. Assessment of essential underpinning knowledge will usually be conducted in an off-site context. Assessment is to comply with relevant regulatory or Australian standards' requirements. Resource implications for assessment include:
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. |
Method of assessment |
Assessment methods must:
Validity and sufficiency of evidence requires that:
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
1.1. Information includes: |
|
1.2. Scope of work : |
|
1.3. Safety (OHS ) is to be in accordance with state and territory legislation and regulations and project safety plan and may include: |
|
1.4. Tools and equipment : |
|
1.5. Materials include: |
|
1.6. Quality requirements include relevant regulations, including: |
|
1.7. Environmental requirements include: |
|
1.8. Statutory and regulatory authorities include: |
|
1.9. Fixing methods include: |
|
Unit Sector(s)
Unit sector |
Construction |
Co-requisite units
Co-requisite units |
Nil |
|
Functional area
Functional area |