Modification History
New unit.
This version first released with CPC08 Construction, Plumbing and Services Training Package Version 9.
Unit Descriptor
This unit of competency specifies the outcomes required to identify hazards common to demolition work, as well as undiscovered hazards that may arise during the course of work on demolition sites; and to assess risks and apply risk management strategies according to compliance and workplace requirements.
Demolition hazards include those relating to:
- demolition work health and safety (WHS)
- public health and safety
- contamination of the environment.
Application of the Unit
This unit of competency supports the induction procedure for specialist demolition workers before beginning work on site. Specialist demolition workers dismantle and demolish public, residential, commercial and industrial buildings and structures of all types, including chemical processing plants, and process the resulting materials for salvage, recycling and waste disposal.
This unit does not replace requirements for completion of construction work health and safety units.
Licensing/Regulatory Information
Licensing, legislative, regulatory or certification requirements apply to demolition work in different States and Territories. Candidates are advised to consult with the relevant regulatory authorities.
Pre-Requisites
CPCCOHS2001A |
Apply OHS requirements, policies and procedures in the construction industry |
Employability Skills Information
This unit contains employability skills.
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the required performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge and/or the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
1 |
Review site characteristics and work plans. |
1.1 |
Issues relating to the age and integrity of buildings and structures, and construction methods and materials used, are identified and applied to review of potential risks. |
1.2 |
Approved demolition plan and safe work method statements (SWMS) are reviewed and information relating to hazards and risk management strategies is applied to participation in job briefing according to work role requirements. |
||
1.3 |
Job roles and responsibilities for people involved in the project are identified and clarified according to workplace procedures. |
2 |
Apply WHS risk management strategies to work activities on demolition sites. |
2.1 |
Hazards that may cause trips, falls or falling objects are identified and risk management strategies applied according to compliance, site and workplace requirements. |
2.2 |
Hazards relating to hazardous substances are identified and risk management strategies applied according to compliance, site and workplace requirements. |
||
2.3 |
Hazards relating to structural composition and integrity of structures are identified and risk management strategies applied according to compliance, site and workplace requirements. |
||
2.4 |
Hazards relating to services are identified and risk management strategies applied according to compliance, site and workplace requirements. |
||
2.5 |
Hazards relating to the use of mobile and static plant, tools and equipment are identified and risk management strategies applied according to compliance, site and workplace requirements. |
||
2.6 |
Hazards relating to the use of high reach excavators are identified and risk management strategies applied according to compliance, site and workplace requirements. |
||
2.7 |
Hazards relating to noise, dust and vibrations are identified and risk management strategies applied according to compliance, site and workplace requirements. |
||
2.8 |
Hazards that may cause fire or explosions are identified and risk management strategies applied according to compliance, site and workplace requirements. |
||
2.9 |
Work site is monitored during demolition process for signs of undiscovered hazards and risk management strategies are applied according to compliance, site and workplace requirements. |
||
2.10 |
WHS hazards and incidents are reported according to compliance, site and workplace requirements. |
3 |
Apply public health and safety risk management strategies on demolition sites. |
3.1 |
Site boundaries and exclusion zones are identified and strategies to prevent access by unauthorised persons are implemented according to compliance, site and workplace requirements. |
3.2 |
Site traffic access and egress points and pedestrian and vehicle routes are identified and traffic management plan is applied according to compliance, site and workplace requirements. |
||
3.3 |
Demolition activities with potential to cause dust, noise and vibrations are identified and risk management strategies are applied according to compliance, site and workplace requirements. |
||
3.4 |
Demolition activities resulting in falling structures or flying debris or with potential to affect structural integrity of adjoining buildings are identified and risk management strategies applied according to compliance, site and workplace requirements. |
||
3.5 |
Public health and safety hazards and incidents are reported according to compliance, site and workplace requirements. |
4 |
Apply environmental risk management strategies on demolition sites. |
4.1 |
Opportunities to maximise environmentally sound use of energy and water are identified and strategies applied according to environmental compliance, site and workplace requirements. |
4.2 |
Potential risks to air quality resulting from demolition work are identified and risk management strategies applied according to environmental compliance, site and workplace requirements. |
||
4.3 |
Potential risks associated with stormwater management are identified and risk management strategies applied according to environmental compliance, site and workplace requirements. |
||
4.4 |
Potential risks to groundwater and groundwater monitoring wells are identified and risk management strategies applied according to environmental compliance, site and workplace requirements. |
||
4.5 |
Potential risks to the environment resulting from removing and handling hazardous substances and waste materials are identified and risk management strategies applied according to environmental compliance, site and workplace requirements. |
||
4.6 |
Environmental hazards and incidents are reported according to environmental compliance, site and workplace requirements. |
5 |
Contribute to improvement of demolition risk management strategies. |
5.1 |
Demolition methods, procedures and risk management strategies are reviewed and discussed with team members to develop ideas for improvements in risk management according to workplace procedures. |
5.2 |
Industry professional development activities relating to demolition risk management are undertaken as required, according to workplace requirements. |
Required Skills and Knowledge
This section describes the skills and knowledge required for this unit. |
Required skills |
|
Required knowledge |
|
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
This unit of competency could be assessed in the workplace by observation of the identification of hazards on demolition sites and the application of risk management strategies. |
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
A person should demonstrate the ability to:
|
Context of and specific resources for assessment |
Assessment of this unit:
Resource implications for assessment include:
|
Method of assessment |
Assessment for this unit must verify the practical application of the required skills and knowledge, using a combination of the following methods:
|
Guidance information for assessment |
This unit could be assessed on its own or in combination with other units relevant to the job function. Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support. Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed. |
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Hazards that may cause trips, falls or falling objects must include: |
|
Hazardous substances must include: |
|
Structural composition and integrity of structures must include: |
|
Services : |
|
Hazards that may cause fire or explosions are: |
|
Undiscovered hazards may include but are not limited to: |
|
Stormwater management may include: |
|
Unit Sector(s)
Demolition
Custom Content Section
Not applicable.