Unit of competency
Modification History
Release 1.
This version first released with CPC Construction, Plumbing and Services Training Package Version 1.
Application
This unit of competency specifies the outcomes required by senior building surveyors to develop an understanding of traditional, new and emerging construction methods and materials, including systems and components for services, for all Building Code of Australia (BCA) defined classes and types of buildings, including all Type A buildings in classes 2, 3, 5, 6, 7, 8 and 9. It involves researching and analysing construction industry information, including research papers, engineering reports, and material specifications and performance data.
The unit also covers developing a knowledge bank and information system for use by the building surveying team, including processes and checklists for ensuring that construction methods and materials used on building projects are evaluated using current and accurate information.
The unit supports the work of private or municipal building surveyors who provide advisory code-consulting services or authorised statutory services relating to planning or building permit application assessment, or building audit and inspection services.
Licensing, legislative, regulatory or certification requirements apply to this unit in some States. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.
Pre-requisite Unit
Nil
Competency Field
Building surveying
Unit Sector
Construction
Elements and Performance Criteria
Elements describe the essential outcomes. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions. |
||
1. |
Develop an information system for construction methods and materials. |
1.1. |
Sources of information on traditional, new and emerging construction methods for BCA classes and types of buildings are researched and evaluated and processes are put in place to access information and maintain its currency. |
1.2. |
Sources of information on traditional, new and emerging construction materials for BCA classes and types of buildings are researched and evaluated and processes are put in place to access information and maintain its currency. |
||
1.3. |
Sources of information on traditional, new and emerging systems and components for services for BCA classes and types of buildings are researched and evaluated and processes are put in place to access information and maintain its currency. |
||
1.4. |
Information management system is developed and maintained to ensure accuracy, currency and comprehensiveness of information. |
||
2. |
Analyse construction methods information. |
2.1. |
Information relating to applying different construction methods to the foundations and footings of each class and type of building is analysed and recorded. |
2.2. |
Information relating to applying different construction methods to the structural and supporting systems of each class and type of building is analysed and recorded. |
||
2.3. |
Information relating to applying different construction methods to the enclosing systems of each class and type of building is analysed and recorded. |
||
2.4. |
Construction methods are evaluated in relation to different geographical locations and climatic conditions, and strengths and weaknesses for particular contexts are recorded. |
||
3. |
Analyse construction materials information. |
3.1. |
Information relating to applying different construction materials to the foundations and footings of each class and type of building is analysed and recorded. |
3.2. |
Information relating to applying different construction materials to the structural and supporting systems of each class and type of building is analysed and recorded. |
||
3.3. |
Information relating to applying different construction materials to the enclosing systems of each class and type of building is analysed and recorded. |
||
3.4. |
Construction materials are evaluated in relation to different geographical locations and climatic conditions, and strengths and weaknesses for particular contexts are noted. |
||
4. |
Analyse information relating to services. |
4.1. |
Information relating to energy supply and infrastructure for different classes and types of buildings is analysed and recorded. |
4.2. |
Information relating to heating and cooling systems for different classes and types of buildings is analysed and recorded. |
||
4.3. |
Information relating to fire protection systems for different classes and types of buildings is analysed and recorded. |
||
4.4. |
Information relating to gas and hydraulic services supply and infrastructure for different classes and types of buildings is analysed and recorded. |
||
4.5. |
Information relating to elevator and escalator systems for different classes and types of buildings is analysed and recorded. |
||
4.6. |
Service systems and components are evaluated in relation to different geographical locations and climatic conditions, and strengths and weaknesses for particular contexts are noted. |
||
5. |
Develop processes for the application of information. |
5.1. |
Information relating to the root cause of building incidents is analysed and methods, materials and service failures are noted. |
5.2. |
Own analyses and notes on construction methods, materials and services are shared and discussed with relevant internal or external personnel to confirm findings and clarify meaning as required. |
||
5.3. |
Advisory notes on the application of construction methods, materials and service systems and components to different classes and types of buildings, are prepared for building surveying team and for clients, as required. |
||
5.4. |
Procedures and checklists are developed to facilitate building surveying team members’ thorough assessment of construction methods, materials and services for different classes and types of buildings. |
Foundation Skills
This section describes the language, literacy, numeracy and employment skills essential to performance in this unit but not explicit in the performance criteria. |
|
Skill |
Performance feature |
Learning skills to: |
|
Numeracy skills to: |
|
Oral communication skills to: |
|
Reading skills to: |
|
Writing skills to: |
|
Range of Conditions
This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below. |
|
Construction methods must include: |
|
Types of buildings must include: |
|
Construction materials must include: |
|
Systems and components for services must include those for: |
|
Unit Mapping Information
No equivalent unit.
Links
Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=7e15fa6a-68b8-4097-b099-030a5569b1ad