^

 
 

Training package details

CPC - Construction, Plumbing and Services Training Package (Release 4.0)

Summary

Usage recommendation:
Current
Release Status:
Current
Releases:
ReleaseRelease dateApproval process
4.0 (this release) 17/Jan/2019Endorsement date: 04/Dec/2018
(View details for release 3.0) 01/May/2017 Endorsement date: 01/May/2017
(View details for release 2.1) 09/Dec/2016 Minor upgrade (Approval date: 09/Dec/2016)
(View details for release 2.0) 09/Sep/2016 Endorsement date: 09/Sep/2016
(View details for release 1.1) 16/Dec/2015 Minor upgrade (Approval date: 17/Dec/2015)
(View details for release 1.0) 05/Jun/2015 Endorsement date: 03/Jun/2015


Disclaimer:
Following the establishment of the new training package development process, any references to the former Industry Skills Councils (ISCs) found in the content of this training package or its components should be referred to the Skills Service Organisation listed below.

Training Package Developer

Organisation:
Artibus Innovation 

Qualifications

 CodeTitleUsageRelease

Toggle visibility of information in grouping for 'Qualification Level: Certificate III'Qualification Level: Certificate III

 CPC30116 - Certificate III in ShopfittingCertificate III in ShopfittingCurrent
 CPC30216 - Certificate III in Signs and GraphicsCertificate III in Signs and GraphicsCurrent
 CPC30318 - Certificate III in ConcretingCertificate III in ConcretingCurrent

Toggle visibility of information in grouping for 'Qualification Level: Advanced Diploma'Qualification Level: Advanced Diploma

 CPC60115 - Advanced Diploma of Building SurveyingAdvanced Diploma of Building SurveyingCurrent

Toggle visibility of information in grouping for 'Qualification Level: Graduate Certificate'Qualification Level: Graduate Certificate

 CPC80115 - Graduate Certificate in Fire Systems Design ManagementGraduate Certificate in Fire Systems Design ManagementCurrent

Toggle visibility of information in grouping for 'Qualification Level: Graduate Diploma'Qualification Level: Graduate Diploma

 CPC80215 - Graduate Diploma of Building SurveyingGraduate Diploma of Building SurveyingCurrent

Units of competency

CodeSort Table listing the units of competency related to this training package. by the Code columnTitleUsageReleaseSort Table listing the units of competency related to this training package. by the Release column
CPCCBS6001 - Research and evaluate construction methods and materials for residential buildings to three storeysResearch and evaluate construction methods and materials for residential buildings to three storeysCurrent
CPCCBS6002 - Research and evaluate construction methods and materials for commercial buildings to three storeysResearch and evaluate construction methods and materials for commercial buildings to three storeysCurrent
CPCCBS6003 - Apply legal and ethical requirements to building surveying functionsApply legal and ethical requirements to building surveying functionsCurrent
CPCCBS6004 - Assess and advise on compliance of design documentation for residential buildings to three storeysAssess and advise on compliance of design documentation for residential buildings to three storeysCurrent
CPCCBS6005 - Assess and advise on compliance of design documentation for commercial buildings to three storeysAssess and advise on compliance of design documentation for commercial buildings to three storeysCurrent
CPCCBS6006 - Process planning applications for residential buildings up to three storeysProcess planning applications for residential buildings up to three storeysCurrent
CPCCBS6007 - Process planning applications for commercial buildings up to three storeysProcess planning applications for commercial buildings up to three storeysCurrent
CPCCBS6008 - Process building applications for residential buildings up to three storeysProcess building applications for residential buildings up to three storeysCurrent
CPCCBS6009 - Process building applications for commercial buildings up to three storeysProcess building applications for commercial buildings up to three storeysCurrent
CPCCBS6010 - Conduct and report on building surveying audits of residential buildings up to three storeysConduct and report on building surveying audits of residential buildings up to three storeysCurrent
CPCCBS6011 - Conduct and report on building surveying audits of commercial buildings up to three storeysConduct and report on building surveying audits of commercial buildings up to three storeysCurrent
CPCCBS6012 - Conduct and report on initial construction inspections of residential buildings up to three storeysConduct and report on initial construction inspections of residential buildings up to three storeysCurrent
CPCCBS6013 - Conduct and report on initial construction inspections of commercial buildings up to three storeysConduct and report on initial construction inspections of commercial buildings up to three storeysCurrent
CPCCBS6014 - Conduct and report on advanced and final inspections of residential buildings up to three storeysConduct and report on advanced and final inspections of residential buildings up to three storeysCurrent
CPCCBS6015 - Conduct and report on advanced and final inspections of commercial buildings up to three storeysConduct and report on advanced and final inspections of commercial buildings up to three storeysCurrent
CPCCBS6016 - Assess and advise on performance-based solutions for buildings up to three storeysAssess and advise on performance-based solutions for buildings up to three storeysCurrent
CPCCBS6017 - Monitor and advise on construction and compliance upgrade work on buildings up to three storeysMonitor and advise on construction and compliance upgrade work on buildings up to three storeysCurrent
CPCCBS8001 - Manage building surveying risks and ensure compliance with ethical and professional standardsManage building surveying risks and ensure compliance with ethical and professional standardsCurrent
CPCCBS8002 - Manage information on construction methods, materials and services for a building surveying teamManage information on construction methods, materials and services for a building surveying teamCurrent
CPCCBS8003 - Manage information on compliance requirements for a building surveying teamManage information on compliance requirements for a building surveying teamCurrent
CPCCBS8004 - Advise on compliance of building design documentationAdvise on compliance of building design documentationCurrent
CPCCBS8005 - Manage planning approval processes for all building typesManage planning approval processes for all building typesCurrent
CPCCBS8006 - Manage building approval processes for all building typesManage building approval processes for all building typesCurrent
CPCCBS8007 - Monitor building work and advise on compliance issuesMonitor building work and advise on compliance issuesCurrent
CPCCBS8008 - Conduct and manage the completion of building inspections and auditsConduct and manage the completion of building inspections and auditsCurrent
CPCCBS8009 - Lead a building surveying teamLead a building surveying teamCurrent
CPCCBS8010 - Liaise and coordinate with head contractors on building projectsLiaise and coordinate with head contractors on building projectsCurrent
CPCCBS8011 - Assess and advise on performance-based solutions for all types of buildingsAssess and advise on performance-based solutions for all types of buildingsCurrent
CPCCCA2003 - Erect and dismantle formwork for footings and slabs on groundErect and dismantle formwork for footings and slabs on groundCurrent
CPCCCA3001 - Carry out general demolition of minor building structuresCarry out general demolition of minor building structuresCurrent
CPCCCM1012 - Work effectively and sustainably in the construction industryWork effectively and sustainably in the construction industryCurrent
CPCCCM1013 - Plan and organise workPlan and organise workCurrent
CPCCCM1014 - Conduct workplace communicationConduct workplace communicationCurrent
CPCCCM1015 - Carry out measurements and calculationsCarry out measurements and calculationsCurrent
CPCCCM1016 - Identify requirements for safe tilt-up workIdentify requirements for safe tilt-up workCurrent
CPCCCM2001 - Read and interpret plans and specificationsRead and interpret plans and specificationsCurrent
CPCCCM2006 - Apply basic levelling proceduresApply basic levelling proceduresCurrent
CPCCCM2007 - Use explosive power toolsUse explosive power toolsCurrent
CPCCCM2008 - Erect and dismantle restricted height scaffoldingErect and dismantle restricted height scaffoldingCurrent
CPCCCM2010 - Work safely on scaffolding higher than two metresWork safely on scaffolding higher than two metresCurrent
CPCCCM3001 - Operate elevated work platforms up to 11 metresOperate elevated work platforms up to 11 metresCurrent
CPCCCM3003 - Work safely around electrical sources, services and assetsWork safely around electrical sources, services and assetsCurrent
CPCCCM3004 - Identify and apply information in construction plans, drawings and specificationsIdentify and apply information in construction plans, drawings and specificationsCurrent
CPCCCM3005 - Calculate costs of construction workCalculate costs of construction workCurrent
CPCCCM3006 - Carry out levelling operationsCarry out levelling operationsCurrent
CPCCCO2021 - Handle concreting materialsHandle concreting materialsCurrent
CPCCCO2022 - Select, check and maintain concreting plant, tools and equipmentSelect, check and maintain concreting plant, tools and equipmentCurrent
CPCCCO3035 - Assess and specify concrete supply requirementsAssess and specify concrete supply requirementsCurrent
CPCCCO3036 - Plan concrete work and brief teamPlan concrete work and brief teamCurrent
CPCCCO3041 - Place concretePlace concreteCurrent
CPCCCO3042 - Finish concreteFinish concreteCurrent
CPCCCO3043 - Cure concreteCure concreteCurrent
CPCCCO3044 - Apply decorative finishes to concreteApply decorative finishes to concreteCurrent
CPCCCO3046 - Repair and rectify concreteRepair and rectify concreteCurrent
CPCCCO3047 - Cut and core concreteCut and core concreteCurrent
CPCCCO3048 - Construct tilt panels on siteConstruct tilt panels on siteCurrent
CPCCCO3049 - Apply and finish sprayed concreteApply and finish sprayed concreteCurrent
CPCCCO3050 - Carry out high performance concretingCarry out high performance concretingCurrent
CPCCCO3051 - Conduct off-form vertical concrete operationsConduct off-form vertical concrete operationsCurrent
CPCCCO3052 - Conduct concrete boom delivery operationsConduct concrete boom delivery operationsCurrent
CPCCCO3053 - Slump test concreteSlump test concreteCurrent
CPCCCO3054 - Operate concrete agitator trucksOperate concrete agitator trucksCurrent
CPCCCO3055 - Install topping slabsInstall topping slabsCurrent
CPCCJN3001 - Process materials to produce components using static machinesProcess materials to produce components using static machinesCurrent
CPCCLBM3001 - Licence to operate a concrete placing boomLicence to operate a concrete placing boomCurrent
CPCCPB3014 - Install bulk insulation and pliable membrane productsInstall bulk insulation and pliable membrane productsCurrent
CPCCPB3027 - Install ceiling insulation productsInstall ceiling insulation productsCurrent
CPCCSF2003 - Cut and bend materials using oxy-LPG equipmentCut and bend materials using oxy-LPG equipmentCurrent
CPCCSF2004 - Place and fix reinforcement materialsPlace and fix reinforcement materialsCurrent
CPCCSF3001 - Apply reinforcement scheduleApply reinforcement scheduleCurrent
CPCCSG3001 - Design and lay out digital signs for productionDesign and lay out digital signs for productionCurrent
CPCCSG3002 - Produce and apply vinyl signsProduce and apply vinyl signsCurrent
CPCCSG3003 - Colour manage signsColour manage signsCurrent
CPCCSG3004 - Print digital signsPrint digital signsCurrent
CPCCSG3005 - Engrave signsEngrave signsCurrent
CPCCSG3006 - Apply gilding to signsApply gilding to signsCurrent
CPCCSG3007 - Paint lines and scrollsPaint lines and scrollsCurrent
CPCCSG3008 - Hand draw chalkboards and showcardsHand draw chalkboards and showcardsCurrent
CPCCSG3009 - Screen-print signsScreen-print signsCurrent
CPCCSG3010 - Hand render pictorialsHand render pictorialsCurrent
CPCCSG3011 - Install LED technology into signsInstall LED technology into signsCurrent
CPCCSG3012 - Fabricate signsFabricate signsCurrent
CPCCSG3013 - Paint letters and decorative effects for signsPaint letters and decorative effects for signsCurrent
CPCCSG3014 - Manufacture gas-charged glass-formed illuminated signsManufacture gas-charged glass-formed illuminated signsCurrent
CPCCSG3015 - Produce airbrushed signsProduce airbrushed signsCurrent
CPCCSG3016 - Prepare surfaces for signsPrepare surfaces for signsCurrent
CPCCSG3017 - Erect and install signsErect and install signsCurrent
CPCCSH3001 - Fabricate shopfitting components using CNC machinesFabricate shopfitting components using CNC machinesCurrent
CPCCSH3002 - Fabricate and assemble shopfront structuresFabricate and assemble shopfront structuresCurrent
CPCCSH3003 - Assemble and install shopfront structuresAssemble and install shopfront structuresCurrent
CPCCSH3004 - Assemble internal shopfitting units and prepare for transportAssemble internal shopfitting units and prepare for transportCurrent
CPCCSH3005 - Apply and trim decorative additions to shopfittings and componentsApply and trim decorative additions to shopfittings and componentsCurrent
CPCCSH3006 - Prepare shopfittings and surfaces and apply liquid finishesPrepare shopfittings and surfaces and apply liquid finishesCurrent
CPCCSH3007 - Install prefabricated internal shopfitting unitsInstall prefabricated internal shopfitting unitsCurrent
CPCCSH3008 - Install internal shop walls and fixturesInstall internal shop walls and fixturesCurrent
CPCCSH3009 - Demolish shopfronts and bulkheadsDemolish shopfronts and bulkheadsCurrent
CPCCSH3010 - Prepare shop floors for new coveringsPrepare shop floors for new coveringsCurrent
CPCCWC3004 - Install suspended ceilingsInstall suspended ceilingsCurrent
CPCCWHS1001 - Prepare to work safely in the construction industryPrepare to work safely in the construction industryCurrent
CPCCWHS2001 - Apply WHS requirements, policies and procedures in the construction industryApply WHS requirements, policies and procedures in the construction industryCurrent
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 100 of 106

Imported units of competency

CodeTitleUsageReleaseSort Table listing Imported units of competency by the Release columnBelongs to training package
AURVTP009 - Apply vehicle body film wrappingApply vehicle body film wrappingCurrentAUR - Automotive Retail, Service and Repair Training Package
BSBSMB301 - Investigate micro business opportunitiesInvestigate micro business opportunitiesCurrentBSB - Business Services Training Package
BSBSMB421 - Manage small business financesManage small business financesCurrentBSB - Business Services Training Package
CPCCLHS3001A - Licence to operate a personnel and materials hoistLicence to operate a personnel and materials hoistCurrentCPC08 - Construction, Plumbing and Services Training Package
CPCCLSF2001A - Licence to erect, alter and dismantle scaffolding basic levelLicence to erect, alter and dismantle scaffolding basic levelCurrentCPC08 - Construction, Plumbing and Services Training Package
MEM05049B - Perform routine gas tungsten arc weldingPerform routine gas tungsten arc weldingSupersededMEM05 - Metal and Engineering Training Package
MEM05050B - Perform routine gas metal arc weldingPerform routine gas metal arc weldingSupersededMEM05 - Metal and Engineering Training Package
MSFFF2006 - Apply surface coatings by spray gunApply surface coatings by spray gunCurrentMSF - Furnishing Training Package
MSFFM3009 - Produce manual and computer-aided production drawingsProduce manual and computer-aided production drawingsCurrentMSF - Furnishing Training Package
MSFFM3011 - Measure and draw site layout for manufactured furniture productsMeasure and draw site layout for manufactured furniture productsCurrentMSF - Furnishing Training Package
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 10 of 13
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form