Modification History
Version |
Comment |
1 |
Revised qualification deemed not equivalent to CPC32712
|
2 |
Update superseded imported units from elective list with equivalent current unit for: RIICCM210A to RIICCM210D This version released with CPC08 Version 9.3. |
3 |
This version released with CPC08 Construction and Property Services 9.9. The following unit was deleted as directed by the IRC June 2021.
|
Description
This qualification provides a trade outcome in gas fitting. Occupational titles may include:
The qualification has core and elective unit of competency requirements that cover some common skills for the plumbing industry, as well as gas fitting specialist units of competency. The plumbing industry strongly affirms that training and assessment leading to recognition of skills must be undertaken in a real or very closely simulated workplace environment and this qualification requires all units of competency to be delivered in this context. Completion of the general induction training program specified by the National Code of Practice for Induction Training for Construction Work (ASCC 2007) is required before entering a construction work site. Achievement of unit CPCCOHS1001A covers this requirement. |
Pathways Information
This qualification is suitable for an Australian Apprenticeship pathway.
Licensing/Regulatory Information
This is a licensed occupation. Check with relevant state and territory licensing and regulatory authorities. State and territory jurisdictions may have different regulatory requirements.
Entry Requirements
Not applicable.
Employability Skills Summary
Employability skill |
Industry/enterprise requirements for this qualification |
Communication |
|
Teamwork |
|
Problem solving |
|
Initiative and enterprise |
|
Planning and organising |
|
Self management |
|
Learning |
|
Technology |
|
Packaging Rules
To achieve this qualification, the candidate must demonstrate competency in:
Some units in this qualification may have prerequisite requirements, which must be met when packaging the qualification. Users are referred to the list of CPC08 units with prerequisite unit requirements available in this Training Package for this purpose. Core units |
|
CPCPCM2039A |
Carry out interactive workplace communication |
CPCPCM2040A |
Read plans and calculate plumbing quantities |
CPCPCM2041A |
Work effectively in the plumbing and services sector |
CPCPCM2043A |
Carry out WHS requirements |
CPCPCM2045A |
Handle and store plumbing materials |
CPCPCM2046A |
Use plumbing hand and power tools |
CPCPCM2047A |
Carry out levelling |
CPCPCM2048A |
Cut and join sheet metal |
CPCPCM2050A |
Mark out materials |
CPCPCM2052A |
Weld using oxy-acetylene equipment |
CPCPCM2053A |
Weld using manual metal arc welding equipment |
CPCPCM2055A |
Work safely on roofs |
CPCPCM3021A |
Flash penetrations through roofs and walls |
CPCPGS3046A |
Install LPG systems in caravans, mobile homes and mobile workplaces |
CPCPGS3047A |
Install LPG systems in marine craft |
CPCPGS3048A |
Install gas pressure control equipment |
CPCPGS3049A |
Install Type A gas appliance flues |
CPCPGS3051A |
Purge consumer piping |
CPCPGS3052A |
Maintain Type A gas appliances |
CPCPGS3053A |
Disconnect and reconnect Type A gas appliances |
CPCPGS3054A |
Calculate and install natural ventilation for Type A gas appliances |
CPCPGS3056A |
Install gas piping systems |
CPCPGS3057A |
Size consumer gas piping systems |
CPCPGS3059A |
Install LPG storage of aggregate storage capacity up to 500 litres |
CPCPGS3061A |
Install and commission Type A gas appliances |
HLTFA211A |
Provide basic emergency life support |
Elective units |
|
CPCCCM2008B |
Erect and dismantle restricted height scaffolding |
CPCCCM2010B |
Work safely at heights |
CPCCCM3001C |
Operate elevated work platforms |
CPCCOHS2001A |
Apply OHS requirements, policies and procedures in the construction industry |
CPCCRI3001A |
Operate personnel and materials hoists |
CPCCST2005A |
Carry out load slinging of off-site materials |
CPCPCM2049A |
Cut using oxy-LPG-acetylene equipment |
CPCPCM2054A |
Carry out simple concreting and rendering |
CPCPCM3022A |
Weld polyethylene and polypropylene pipes using fusion method |
CPCPCM3023A |
Fabricate and install non-ferrous pressure piping |
CPCPGS3055A |
Install gas sub-meters |
CPCPGS3060A |
Install LPG storage of aggregate storage capacity exceeding 500 litres and less than 8KL |
CPCPMS2021A |
Assemble mechanical services components |
CPCPMS3031A |
Fabricate and install steel pressure piping |
CPCPMS3033A |
Install small bore heating systems |
CPCPMS3035A |
Install and test ducting systems |
MEM05049B |
Perform routine gas tungsten arc welding |
MEM05050B |
Perform routine gas metal arc welding |
RIICCM210D |
Install trench support |
Custom Content Section
Not applicable.