^

 
 

Qualification details

CPC32513 - Certificate III in Plumbing (Mechanical Services) (Release 2)

Summary

Usage recommendation:
Deleted
The Deleted usage recommendation was implemented on 13 June 2017 to describe training components that have no replacement. Enrolments in training components and statements of attainment or qualifications issued before 13 June 2017 are valid. For any components marked as deleted after 13 June 2017, the applicable transition/teach-out periods apply. For specific questions regarding the enrolment, delivery or issuance of a statement of attainment/qualification, please contact your training regulator.
Mapping:
MappingNotesDate
DeletedDeleted from CPC08 Construction, Plumbing and Services Training Package15/Feb/2021
Supersedes CPC32512 - Certificate III in Plumbing (Mechanical Services)Replaces superseded non-equivalent CPC32512.16/Jan/2014

Releases:
ReleaseRelease date
2 (this release) 17/Jan/2017
(View details for release 1) 17/Jan/2014

Training packages that include this qualification

Units of competency

CodeSort Table listing Units of Competency by the Code columnTitleSort Table listing Units of Competency by the Title columnUsage RecommendationSort Table listing Units of Competency by the Usage Recommendation columnEssentialSort Table listing Units of Competency by the Essential column
MEM05049B - Perform routine gas tungsten arc weldingPerform routine gas tungsten arc weldingSupersededN/A
CPCPGS3046A - Install LPG systems in caravans, mobile homes and mobile workplacesInstall LPG systems in caravans, mobile homes and mobile workplacesSupersededN/A
CPCPGS3047A - Install LPG systems in marine craftInstall LPG systems in marine craftSupersededN/A
CPCPSN3011B - Plan layout of a residential sanitary plumbing systemPlan layout of a residential sanitary plumbing systemSupersededN/A
CPCPCM2047A - Carry out levellingCarry out levellingSupersededN/A
CPCPSN3022A - Install discharge pipesInstall discharge pipesSupersededN/A
UEENEEJ105A - Position, assemble and start up single head split air conditioning and water heating heat pump systemsPosition, assemble and start up single head split air conditioning and water heating heat pump systemsSupersededN/A
CPCCCM2008B - Erect and dismantle restricted height scaffoldingErect and dismantle restricted height scaffoldingSupersededN/A
CPCPCM2045A - Handle and store plumbing materialsHandle and store plumbing materialsSupersededN/A
CPCPGS3054A - Calculate and install natural ventilation for Type A gas appliancesCalculate and install natural ventilation for Type A gas appliancesSupersededN/A
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 10 of 107

Classifications

SchemeCodeClassification value
ANZSCO Identifier 334100 Plumbers 
ASCO (occupation type) Identifier 4431 Plumbers 
ASCED Qualification/Course Field of Education Identifier 0403 Building 
Qualification/Course Level of Education Identifier 514 Certificate III 
Taxonomy - Industry Sector N/A Building Trades 
Taxonomy - Occupation N/A Plumber (Airconditioning and Mechanical Services) 

Classification history

SchemeCodeClassification valueStart dateEnd date
ANZSCO Identifier 334100 Plumbers 02/May/2014 
ASCO (occupation type) Identifier 4431 Plumbers 02/May/2014 
ASCED Qualification/Course Field of Education Identifier 0403 Building 02/May/2014 
Qualification/Course Level of Education Identifier 514 Certificate III 17/Jan/2014 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Version

Comment

1

Revised qualification deemed not equivalent to CPC32512

Qualification packaging amended:

  • Water stream core requirements changed from 23 to 24 and Water stream elective requirements changed from 7 to 5 (to align to Water stream requirements in CPC32413)
  • Gas services stream core unit CPCPGS3058A revised to non-equivalent CPCPGS3061A Install and commission Type A gas appliances
  • CPCPWT3020A Connect and install storage tanks to a domestic water supply added as a core unit in Water stream
  • CPCPFS2021A Connect static storage tanks for fixed fire protection systems deleted from Water stream electives
  • Water stream elective unit CPCPFS3033A revised and recoded to CPCPFS3045A Fit off sprinkler heads, controls and ancillary equipment
  • prerequisite unit to CPCCCM2008B (CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry) added to elective streams where CPCCCM2008B appears
  • imported units for the purpose of ARC licensing added to the Mechanical Services elective stream:
  • UEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace
  • UEENEEJ102A Prepare and connect refrigerant tubing and fittings
  • UEENEEJ105A Position, assemble and start up single head split air conditioning and water heating heat pump systems
  • UEENEEJ172A Recover, pressure test, evacuate, charge and leak test refrigerants – split systems
  • pathways information added

2

Update superseded imported units from elective list with equivalent current unit for:

  • AHCIRG306A to AHCIRG306
  • RIICCM210A to RIICCM210D

This version released with CPC08 Version 9.3.

Description

This qualification provides a trade outcome in plumbing, specialising in mechanical services.

Occupational titles may include:

  • Plumber.

The qualification has core and elective unit of competency requirements that cover mechanical services specialist skills and common and other specialist skills for the plumbing industry.

The qualification has options from six specialist streams:

Stream 1 Mechanical services

Stream 2 Water

Stream 3 Sanitary

Stream 4 Drainage

Stream 5 Roofing

Stream 6 Gas services.

The plumbing industry strongly affirms that training and assessment leading to recognition of skills must be undertaken in a real or very closely simulated workplace environment and this qualification requires all units of competency to be delivered in this context.

Completion of the general induction training program specified by the National Code of Practice for Induction Training for Construction Work (ASCC 2007) is required before entering a construction work site. Achievement of unit CPCCOHS1001A covers this requirement.

Pathways Information

This qualification is suitable for an Australian Apprenticeship pathway.

Licensing/Regulatory Information

This is a licensed occupation. Check with relevant state and territory licensing and regulatory authorities. State and territory jurisdictions may have different regulatory requirements.

Entry Requirements

Not applicable.

Employability Skills Summary

Employability skill 

Industry/enterprise requirements for this qualification 

Communication 

  • Communicates with clients, colleagues and others using effective and appropriate communication techniques, including:
  • Clear and direct communication
  • Active listening
  • Verbal and non-verbal language
  • Questioning to identify and confirm requirements
  • Language and concepts appropriate to cultural differences
  • Follows instructions from supervisor and other relevant persons
  • Understands, interprets and applies information as required from:
  • Regulatory, legislative, licensing and organisational requirements
  • Environmental and WHS requirements, including safety data sheets (SDS)
  • Codes and standards
  • Plans, drawings and specifications
  • Schedules
  • Load tables
  • Designs
  • Safety signs and symbols
  • Organisational policies and procedures
  • Understands relevant definitions, terminology, symbols, abbreviations and language
  • Uses industry-accepted visual communications, including hand signals
  • Reports and records routine workplace and regulatory information including test data
  • Applies measurements and calculations using appropriate equipment, formulas and records as required
  • Reports and records hazards and risks

Teamwork 

  • Works as part of a team
  • Provides assistance and encouragement to other team members
  • Initiates and encourages improvements in team performance
  • Works with others to plan and sequence tasks
  • Identifies and uses the strengths of other team members
  • Relates to people from diverse social, cultural and ethnic backgrounds and with varying physical and mental abilities
  • Participates in workplace meetings

Problem solving 

  • Responds effectively to hazards, risks, emergencies and first aid situations
  • Examines tools and equipment prior to use for damage, missing components or other defects
  • Identifies typical faults and problems and takes remedial actions and/or reports to supervisor
  • Performance tests penetration to ensure correct fit and remedies as required
  • Rectifies simple faults with tools and equipment
  • Locates and clears plumbing blockages
  • Tests systems and services
  • Calculates water flow rates, ventilation requirements and gas storage capacity
  • Rectifies incorrect roofing installations
  • Assesses roof work site safety
  • Locates and repairs gas leaks

Initiative and enterprise 

  • Maximises use of resources by recycling, re-using or using appropriate disposal methods
  • Responds to change and workplace challenges
  • Designs domestic irrigation systems
  • Designs and fabricates roof coverings
  • Determines requirements for heating system installations, roof water storage, medical gas pipeline systems, appliance installations, flue installations and gas piping system purging

Planning and organising 

  • Prepares work area
  • Identifies and obtains necessary documentation
  • Collects, analyses and organises workplace information
  • Selects and uses appropriate materials, tools and equipment
  • Carries out site inspections
  • Determines material quantity requirements and conformity to requirements
  • Coordinates delivery of materials
  • Fabricates, sets out, installs and commissions components, equipment and systems
  • Plans drainage system layouts
  • Prioritises and sequences tasks
  • Applies time management skills to ensure work is completed to time requirements

Self management 

  • Recognises obligations and accepts responsibility for own work and safety
  • Recognises quality requirements and completes work to expected standard
  • Identifies personal career development needs and sets own and team work goals
  • Participates in workplace induction
  • Cleans up work area, including tools and equipment
  • Seeks support to improve work performance

Learning 

  • Identifies own learning needs and seeks skill development as required
  • Is open to learning new ideas and techniques
  • Participates in workplace induction

Technology 

  • Uses electricity and electrical equipment safely
  • Uses and operates a range of tools and equipment correctly and safely
  • Properly starts up, operates and shuts down equipment
  • Identifies technological trends that may affect the plumbing and services sector
  • Carries out pre- and post-operational checks on tools and equipment
  • Performs tools, equipment and systems maintenance as required
  • Installs and adjusts a range of water service and gas controlling and regulating devices, as well as a variety of plumbing related pumps, systems, components and appliances
  • Installs, tests and maintains fire protection installations and component assemblies, domestic sprinkler systems, heating ventilation, and air conditioning and air cooling systems

Packaging Rules

Units of competency from a minimum of four of the following six plumbing streams are required for award of this qualification.

Stream 1 Mechanical services and Stream 2 Water are mandatory.

The following units of competency are required for award of this qualification:

Stream 1 Mechanical services (mandatory): 4 core units and 11 elective units from the mechanical services stream

and

Stream 2 Water (mandatory): 24 core units and 5 elective units from the water stream.

Plus two of the following four streams: Stream 3 Sanitary: 6 core units and 4 elective units from the sanitary stream

Stream 4 Drainage: 9 core units and 3 elective units from the drainage stream

Stream 5 Roofing: 8 core units and 4 elective units from the roofing stream

Stream 6 Gas services: 12 core units and 5 elective units from the gas services stream

NB: Units of competency achieved in one stream count as credit for the same unit in the core or elective requirements for any other stream.

Some units in this qualification may have prerequisite requirements, which must be met when packaging the qualification. Users are referred to the list of CPC08 units with prerequisite unit requirements available in this Training Package for this purpose.

Core units  

Mechanical services stream

CPCPCM2048A

Cut and join sheet metal

CPCPMS2021A

Assemble mechanical services components

CPCPMS3031A

Fabricate and install steel pressure piping

CPCPMS3033A

Install small bore heating systems

Water stream

CPCPCM2039A

Carry out interactive workplace communication

CPCPCM2040A

Read plans and calculate plumbing quantities

CPCPCM2041A

Work effectively in the plumbing and services sector

CPCPCM2043A

Carry out WHS requirements

CPCPCM2045A

Handle and store plumbing materials

CPCPCM2046A

Use plumbing hand and power tools

CPCPCM2047A

Carry out levelling

CPCPCM2050A

Mark out materials

CPCPCM2052A

Weld using oxy-acetylene equipment

CPCPCM2053A

Weld using manual metal arc welding equipment

CPCPCM2054A

Carry out simple concreting and rendering

CPCPCM2055A

Work safely on roofs

CPCPCM3021A

Flash penetrations through roofs and walls

CPCPCM3022A

Weld polyethylene and polypropylene pipes using fusion method

CPCPCM3023A

Fabricate and install non-ferrous pressure piping

CPCPFS3031A

Fabricate and install fire hydrant and hose reel systems

CPCPWT3020A

Connect and install storage tanks to a domestic water supply

CPCPWT3021A

Set out and install water services

CPCPWT3022A

Install and adjust water service controls and devices

CPCPWT3023A

Install and commission water heating systems

CPCPWT3025A

Install water pumpsets

CPCPWT3026A

Fit off and commission heated and cold water services

CPCPWT3027A

Connect irrigation systems from drinking water supply

HLTFA211A

Provide basic emergency life support

Sanitary stream

CPCPCM2048A

Cut and join sheet metal

CPCPDR2021A

Locate and clear blockages

CPCPSN3011B

Plan layout of a residential sanitary plumbing system

CPCPSN3022A

Install discharge pipes

CPCPSN3023A

Fabricate and install sanitary stacks

CPCPSN3024A

Install and fit off sanitary fixtures

Drainage stream

CPCPDR2021A

Locate and clear blockages

CPCPDR2022A

Install domestic treatment plants

CPCPDR2024A

Install stormwater and sub-soil drainage systems

CPCPDR2025A

Drain work site

CPCPDR2026A

Install prefabricated inspection openings and enclosures

CPCPDR3021A

Plan layout of a residential sanitary drainage system

CPCPDR3022A

Install below ground sanitary drainage systems

CPCPDR3023A

Install on-site disposal systems

RIICCM210A

Install trench support

Roofing stream

CPCPCM2048A

Cut and join sheet metal

CPCPRF2022A

Select and install roof sheeting and wall cladding

CPCPRF2023A

Collect and store roof water

CPCPRF3021A

Receive roofing materials

CPCPRF3022A

Fabricate and install roof drainage components

CPCPRF3023A

Fabricate and install external flashings

CPCPRF3024A

Install roof components

CPCPRF3026A

Install composite roof systems

Gas services stream

CPCPCM2048A

Cut and join sheet metal

CPCPGS3046A

Install LPG systems in caravans, mobile homes and mobile workplaces

CPCPGS3047A

Install LPG systems in marine craft

CPCPGS3048A

Install gas pressure control equipment

CPCPGS3049A

Install Type A gas appliance flues

CPCPGS3051A

Purge consumer piping

CPCPGS3053A

Disconnect and reconnect Type A gas appliances

CPCPGS3054A

Calculate and install natural ventilation for Type A gas appliances

CPCPGS3056A

Install gas piping systems

CPCPGS3057A

Size consumer gas piping systems

CPCPGS3059A

Install LPG storage of aggregate storage capacity up to 500 litres

CPCPGS3061A

Install and commission Type A gas appliances

Elective units  

Mechanical services stream

CPCCCM2008B

Erect and dismantle restricted height scaffolding

CPCCCM2010B

Work safely at heights

CPCCCM3001C

Operate elevated work platforms

CPCCOHS2001A

Apply OHS requirements, policies and procedures in the construction industry

CPCCPB3015A

Install acoustic and thermal environmental protection systems

CPCCRI3001A

Operate personnel and materials hoists

CPCCST2005A

Carry out load slinging of off-site materials

CPCPCM2049A

Cut using oxy-LPG-acetylene equipment

CPCPMS3032A

Select and fit insulation and sheathing

CPCPMS3034A

Install medical gas pipeline systems

CPCPMS3035A

Install and test ducting systems

CPCPMS3036A

Install air handling units

CPCPMS3037A

Install and test split system air conditioning

CPCPMS3038A

Install air conditioning control equipment

CPCPMS3039A

Maintain mechanical services equipment

CPCPMS3040A

Install and maintain evaporative air cooling systems

CPCPMS3041A

Install domestic solid fuel burning appliances

CPCPRF3023A

Fabricate and install external flashings

MEM05049B

Perform routine gas tungsten arc welding

MEM05050B

Perform routine gas metal arc welding

MEM10009B

Install refrigeration and air conditioning plant and equipment

MEM10010B

Install pipework and pipework assemblies

MEM18086B

Test, recover, evacuate and charge refrigeration systems

RIICCM210D

Install trench support

UEENEEE101A

Apply Occupational Health and Safety regulations, codes and practices in the workplace

UEENEEJ102A

Prepare and connect refrigerant tubing and fittings

UEENEEJ105A

Position, assemble and start up single head split air conditioning and water heating heat pump systems

UEENEEJ172A

Recover, pressure test, evacuate, charge and leak test refrigerants – split systems

Water stream

AHCIRG306

Troubleshoot irrigation systems

CPCCCM2008B

Erect and dismantle restricted height scaffolding

CPCCCM2010B

Work safely at heights

CPCCCM3001C

Operate elevated work platforms

CPCCOHS2001A

Apply OHS requirements, policies and procedures in the construction industry

CPCCPB3015A

Install acoustic and thermal environmental protection systems

CPCCRI3001A

Operate personnel and materials hoists

CPCCST2005A

Carry out load slinging of off-site materials

CPCPCM2048A

Cut and join sheet metal

CPCPCM2049A

Cut using oxy-LPG-acetylene equipment

CPCPFS2022A

Install portable fire equipment

CPCPFS3034A

Install control valve assemblies, actuating devices and local alarms

CPCPFS3037A

Install domestic and residential life safety sprinkler systems

CPCPFS3038A

Test and maintain fire hydrant and hose reel installations

CPCPFS3045A

Fit off sprinkler heads, controls and ancillary equipment

CPCPIG2021A

Design domestic urban irrigation systems

CPCPIG3021A

Set out, install and commission irrigation systems

CPCPIG3022A

Install and commission domestic irrigation pumps

CPCPMS3031A

Fabricate and install steel pressure piping

CPCPMS3032A

Select and fit insulation and sheathing

CPCPMS3033A

Install small bore heating systems

CPCPMS3040A

Install and maintain evaporative air cooling systems

CPCPRF2023A

Collect and store roof water

CPCPWT3024A

Install and maintain domestic water treatment equipment

CPCPWT3028A

Install water services

CPCPWT3029A

Install water pipe systems

CPCPWT3030A

Install home fire sprinkler systems

MEM05049B

Perform routine gas tungsten arc welding

MEM05050B

Perform routine gas metal arc welding

RIICCM210D

Install trench support

Sanitary stream

CPCCCM2008B

Erect and dismantle restricted height scaffolding

CPCCCM2010B

Work safely at heights

CPCCCM3001C

Operate elevated work platforms

CPCCOHS2001A

Apply OHS requirements, policies and procedures in the construction industry

CPCCPB3015A

Install acoustic and thermal environmental protection systems

CPCCRI3001A

Operate personnel and materials hoists

CPCCST2005A

Carry out load slinging of off-site materials

CPCPCM2049A

Cut using oxy-LPG-acetylene equipment

CPCPDR2022A

Install domestic treatment plants

CPCPDR2023A

Maintain effluent disinfection systems

CPCPDR2024A

Install stormwater and sub-soil drainage systems

CPCPDR2025A

Drain work site

CPCPDR2026A

Install prefabricated inspection openings and enclosures

CPCPDR3022A

Install below ground sanitary drainage systems

CPCPDR3023A

Install on-site disposal systems

CPCPMS3032A

Select and fit insulation and sheathing

CPCPSN3025A

Install pre-treatment facilities

CPCPSN3026A

Install sewerage pumpsets

RIICCM210D

Install trench support

Drainage stream

CPCCST2005A

Carry out load slinging of off-site materials

CPCPCM2048A

Cut and join sheet metal

CPCPCM2049A

Cut using oxy-LPG-acetylene equipment

CPCPDR2023A

Maintain effluent disinfection systems

CPCPSN3025A

Install pre-treatment facilities

CPCPWT3029A

Install water pipe systems

Roofing stream

CPCCCM2008B

Erect and dismantle restricted height scaffolding

CPCCCM2010B

Work safely at heights

CPCCCM3001C

Operate elevated work platforms

CPCCOHS2001A

Apply OHS requirements, policies and procedures in the construction industry

CPCCPB3015A

Install acoustic and thermal environmental protection systems

CPCCRI3001A

Operate personnel and materials hoists

CPCCST2005A

Carry out load slinging of off-site materials

CPCPCM2049A

Cut using oxy-LPG-acetylene equipment

CPCPRF2024A

Fabricate roof coverings for curved structures

CPCPRF3025A

Install roof coverings to curved roof structures

MEM05049B

Perform routine gas tungsten arc welding

MEM05050B

Perform routine gas metal arc welding

RIICCM210D

Install trench support

Gas services stream

CPCCCM2008B

Erect and dismantle restricted height scaffolding

CPCCCM2010B

Work safely at heights

CPCCCM3001C

Operate elevated work platforms

CPCCOHS2001A

Apply OHS requirements, policies and procedures in the construction industry

CPCCRI3001A

Operate personnel and materials hoists

CPCCST2005A

Carry out load slinging of off-site materials

CPCPCM2049A

Cut using oxy-LPG-acetylene equipment

CPCPGS3050A

Install Type B gas appliance flues

CPCPGS3052A

Maintain Type A gas appliances

CPCPGS3055A

Install gas sub-meters

CPCPGS3060A

Install LPG storage of aggregate storage capacity exceeding 500 litres and less than 8KL

CPCPMS2021A

Assemble mechanical services components

CPCPMS3031A

Fabricate and install steel pressure piping

CPCPMS3033A

Install small bore heating systems

CPCPMS3035A

Install and test ducting systems

CPCPMS3036A

Install air handling units

MEM05049B

Perform routine gas tungsten arc welding

MEM05050B

Perform routine gas metal arc welding

RIICCM210D

Install trench support

Custom Content Section

Not applicable.