^

 
 

Qualification details

CPC31220 - Certificate III in Wall and Ceiling Lining (Release 2)

Summary

Usage recommendation:
Current
Mapping:
MappingNotesDate
Supersedes and is equivalent to CPC31211 - Certificate III in Wall and Ceiling LiningSupersedes and is equivalent to CPC31211 Certificate III in Wall and Ceiling Lining. 26/Nov/2020

Release Status:
Replaced
Releases:
ReleaseRelease date
(View details for release 4) 22/Jun/2021
(View details for release 3) 06/May/2021
2 (this release) 15/Jan/2021
(View details for release 1) 27/Nov/2020


Training packages that include this qualification

Replaced release

You are currently viewing the components related to release 2.
The current release is release 4View release 4 details.

Units of competency

CodeSort Table listing Units of Competency by the Code columnTitleSort Table listing Units of Competency by the Title columnUsage RecommendationSort Table listing Units of Competency by the Usage Recommendation columnEssentialSort Table listing Units of Competency by the Essential column
CPCCPB3012 - Cut and fix paper-faced cornicesCut and fix paper-faced cornicesCurrentCore
CPCCPB3020 - Match, mitre and install cast ornamental cornicesMatch, mitre and install cast ornamental cornicesCurrentElective
CPCCWC2001 - Complete penetrations and flashingsComplete penetrations and flashingsCurrentElective
CPCCPB3005 - Fix ceiling sheets to external protected areasFix ceiling sheets to external protected areasCurrentCore
CPCCWC3002 - Install and finish plasterboard and fibre cement sheeting to arch substrateInstall and finish plasterboard and fibre cement sheeting to arch substrateCurrentElective
CPCCCM2012 - Work safely at heightsWork safely at heightsCurrentCore
CPCCPB3007 - Apply levels of finish standards to planning and inspection of own workApply levels of finish standards to planning and inspection of own workCurrentCore
CPCCPB3016 - Install and finish columnsInstall and finish columnsCurrentElective
CPCCPB3027 - Install ceiling insulation productsInstall ceiling insulation productsCurrentElective
BSBESB301 - Investigate business opportunitiesInvestigate business opportunitiesCurrentElective
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 10 of 46

Classifications

SchemeCodeClassification value
ANZSCO Identifier 333211 Plasterer (Wall and Ceiling) 
ASCED Qualification/Course Field of Education Identifier 0403 Building 
Qualification/Course Level of Education Identifier 514 Certificate III 
Taxonomy - Industry Sector N/A Building Trades 
Taxonomy - Occupation N/A Plasterer,Wall and Ceiling Liner 

Classification history

SchemeCodeClassification valueStart dateEnd date
ANZSCO Identifier 333211 Plasterer (Wall and Ceiling) 27/Nov/2020 
ASCED Qualification/Course Field of Education Identifier 0403 Building 27/Nov/2020 
Qualification/Course Level of Education Identifier 514 Certificate III 27/Nov/2020 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Release 2

This version first released with CPC Construction, Plumbing and Services Training Package Release 6.1.

Unit code corrected in elective list: CPCSHP3007 Install prefabricated internal shopfitting units to CPCSHP3007 Install prefabricated internal shopfitting units.

Release 1

This version first released with CPC Construction, Plumbing and Services Training Package Release 5.0.

Supersedes and is equivalent to CPC31211 Certificate III in Wall and Ceiling Lining. Updated to meet the Standards for Training Packages.

Qualification Description

This qualification provides a trade outcome in wall and ceiling lining for residential and commercial construction work. The qualification has core unit of competency requirements that cover common skills for the construction industry, as well as the specialist field of work wall and ceiling liner. Wall and ceiling liners apply and fix linings for non-structural walls and ceilings.

Occupational titles may include:

  • Wall and ceiling liner
  • Drywaller
  • Plasterer.

State and territory jurisdictions may have different licensing, legislative, regulatory or certification requirements. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.

This qualification is suitable for an Australian apprenticeship pathway.

Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work, is required by anyone carrying out construction work. Achievement of CPCCWHS1001 Prepare to work safely in the construction industry meets this requirement.

Entry Requirements

There are no entry requirements for this qualification.

Packaging Rules

To achieve this qualification, the candidate must demonstrate competency in:

  • 29 units of competency:
  • 22 core units
  • 7 elective units.

Electives must be selected as follows:

  • all seven units from the electives listed below, or
  • five units from the electives listed below, plus two units selected from any current training package or accredited course as long as they contribute to a valid, industry-supported vocational outcome, maintain the integrity of the AQF level of this qualification and do not duplicate the outcome of another unit used to achieve this qualification.

Prerequisite units 

An asterisk (*) against a unit code below indicates that there is a prerequisite requirement that must be met. Prerequisite unit(s) must be assessed before assessment of any unit of competency with an asterisk. Check the unit of competency for information on specific prerequisite requirements. All prerequisite requirements are packaged in the qualification.

Core units 

CPCCCA3014*

Construct and install bulkheads

CPCCCA3026*

Assemble partitions

CPCCOM2001

Read and interpret plans and specifications

CPCCCM2012*

Work safely at heights

CPCCOM1012

Work effectively and sustainably in the construction industry

CPCCOM1013

Plan and organise work

CPCCOM1014

Conduct workplace communication

CPCCOM1015

Carry out measurements and calculations

CPCCPB3001*

Fix standard plasterboard wall sheets

CPCCPB3002*

Fix standard plasterboard ceiling sheets

CPCCPB3003*

Fix battens

CPCCPB3004*

Fix wet area sheets

CPCCPB3005*

Fix ceiling sheets to external protected areas

CPCCPB3006*

Fix fibre cement board

CPCCPB3007*

Apply levels of finish standards to planning and inspection of own work

CPCCPB3008*

Mix plastering compounds

CPCCPB3009*

Finish plasterboard joints manually

CPCCPB3010*

Manually sand plaster work

CPCCPB3012*

Cut and fix paper-faced cornices

CPCCWC3003*

Install dry wall passive fire-rated systems

CPCCWC3004*

Install suspended ceilings

CPCCWHS2001

Apply WHS requirements, policies and procedures in the construction industry

Elective units 

BSBESB301

Investigate business opportunities

BSBESB407

Manage finances for new business ventures

CPCCCA3001*

Carry out general demolition of minor building structures

CPCCCA3010*

Install windows and doors

CPCCCM2006

Apply basic levelling procedures

CPCCCM2007*

Use explosive power tools

CPCCCM2008*

Erect and dismantle restricted height scaffolding

CPCCCM3001

Operate elevated work platforms up to 11 metres

CPCCPB3014*

Install bulk insulation and pliable membrane products

CPCCPB3015*

Install acoustic and thermal environmental protection systems

CPCCPB3016*

Install and finish columns

CPCCPB3017*

Rectify faults in drywall applications

CPCCPB3018*

Use vacuum and electric sanding equipment to finish plaster work

CPCCPB3019*

Inspect equipment for serviceability

CPCCPB3020*

Match, mitre and install cast ornamental cornices

CPCCPB3021*

Install and fix residential acoustic plaster products

CPCCPB3022*

Use mechanical jointing equipment to finish joints

CPCCPB3027*

Install ceiling insulation products

CPCCSP3003*

Apply trowelled texture coat finishes

CPCCSP3005*

Install pre-cast decorative mouldings

CPCCWC2001*

Complete penetrations and flashings

CPCCWC3001*

Install and finish plasterboard and fibre cement sheeting to curved wall and ceiling substrates

CPCCWC3002*

Install and finish plasterboard and fibre cement sheeting to arch substrates

CPCSHP3007*

Install prefabricated internal shopfitting units

Qualification Mapping Information

CPC Construction, Plumbing and Services Training Package 5.0 

CPC08 Construction, Plumbing and Services Training Package 

Comments 

E/NE 

CPC31220 Certificate III in Wall and Ceiling Lining

CPC31211

Certificate III in Wall and Ceiling Lining

Supersedes and is equivalent to CPC31211 Certificate III in Wall and Ceiling Lining.

Updated to meet the Standards for Training Packages 2012.

E

Links

The Companion Volume Implementation Guide for the CPC Construction, Plumbing and Services Training Package is available at - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=7e15fa6a-68b8-4097-b099-030a5569b1ad