Modification History
Not Applicable
Description
This qualification provides an occupational outcome in draining.
Occupational titles may include:
- Drainer.
The qualification has core and elective units of competency that include units common to other qualifications in the plumbing industry, as well as specialist drainage units of competency.
The plumbing industry strongly affirms that training and assessment leading to recognition of skills must be undertaken in a real or very closely simulated workplace environment and this qualification requires all units of competency to be delivered in this context.
Completion of the general induction training program specified by the National Code of Practice for Induction Training for Construction Work (ASCC 2007) is required before entering a construction work site. Achievement of unit CPCCOHS1001A covers this requirement.
Pathways Information
Not Applicable
Licensing/Regulatory Information
Not Applicable
Entry Requirements
Not Applicable
Employability Skills Summary
EMPLOYABILITY SKILLS QUALIFICATION SUMMARY |
|
Employability skill |
Industry /enterprise requirements for this qualification include : |
Communication |
|
Teamwork |
|
Problem solving |
|
Initiative and enterprise |
|
Planning and organising |
|
Self management |
|
Learning |
|
Technology |
|
Packaging Rules
Packaging rules
To achieve this qualification, the candidate must demonstrate competency in:
- 22 units of competency:
- 18 core units
- 4 elective units.
Core units
CPCPCM2002A |
Carry out interactive workplace communication |
CPCPCM2004A |
Read plans and calculate plumbing quantities |
CPCPCM2011A |
Apply first aid in the workplace |
CPCPCM2021A |
Work effectively in the plumbing and services sector |
CPCPCM2023A |
Carry out OHS requirements |
CPCPCM2025A |
Handle and store plumbing materials |
CPCPCM2026A |
Use plumbing hand and power tools |
CPCPCM2027A |
Carry out levelling |
CPCPCM2030A |
Mark out materials |
CPCPCM2034A |
Carry out simple concreting and rendering |
CPCPDR2011A |
Locate and clear blockages |
CPCPDR2012A |
Install domestic treatment plants |
CPCPDR2014A |
Install stormwater and sub-soil drainage systems |
CPCPDR2015A |
Drain work site |
CPCPDR2016A |
Install prefabricated inspection openings and enclosures |
CPCPDR3012A |
Install below ground sanitary drainage systems |
CPCPDR3013A |
Install on-site disposal systems |
RIICCM210A |
Install trench support |
Elective units
CPCPCM2018A |
Cut and join sheet metal |
CPCPCM2033A |
Weld using arc welding equipment |
CPCPCM2019A |
Cut using oxy-LPG-acetylene equipment |
CPCPCM2022A |
Weld using oxy-acetylene equipment |
CPCPCM3012A |
Weld plastic pipe using fusion method |
CPCPDR2013A |
Maintain effluent disinfection systems |
CPCPDR3011A |
Plan layout of a residential sanitary drainage system |
CPCPWT3019A |
Install water pipe systems |
CPCPRF2013A |
Collect and store roof water |
CPCPSN3015A |
Install pre-treatment facilities |