Modification History
Release |
Comment |
Release 1 |
Replaces AURR346931A Water test a vessel Unit code updated to meet policy requirements Reference to OHS legislation replaced with new WHS legislation |
Unit Descriptor
Unit descriptor |
This unit of competency describes the skills and knowledge required to water test a vessel so as to meet specific customer performance specifications and ensure conformity to statutory regulations. It requires the ability to establish customer requirements, conduct pre-water safety inspection, water test and repair failed system and components, and complete work processes. No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication. |
Application of the Unit
Application of the unit |
This unit applies to individuals who undertake the water testing of a vessel after service, repair or installation work to ensure that the work meets specific customer performance specifications and conformity to statutory regulations. |
Licensing/Regulatory Information
Not applicable.
Pre-Requisites
Not applicable.
Employability Skills Information
Employability skills |
This unit contains employability skills. |
Elements and Performance Criteria Pre-Content
Elements describe the essential outcomes of a unit of competency. |
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge section and the range statement. Assessment of performance is to be consistent with the evidence guide. |
Elements and Performance Criteria
ELEMENT |
PERFORMANCE CRITERIA |
1. Prepare for work |
1.1. Establish vessel configuration performance to be checked with customer 1.2. Select test procedure and equipment required for water testing 1.3. Check manufacturer and component supplier specifications 1.4. Check equipment and tools for safe and effective operation 1.5. Locate workplace health and safety (WHS) requirements, including personal safety needs, for the work activity |
2. Conduct pre-water test safety inspection |
2.1. Check safety of vessel according to industry regulations and guidelines, WHS and environmental legislation, and enterprise policies and procedures 2.2. Repair systems and components that fail the safety inspection prior to vessel leaving mooring |
3. Water test vessel |
3.1. Test and document engine performance 3.2. Test and document propulsion unit 3.3. Test and document hull and hull fittings 3.4. Compare water test performance data with manufacturer and component supplier specifications 3.5. Prepare customer test report and recommend any additional repairs and/or modifications required 3.6. Present vessel to customer as required by workplace procedures 3.7. Carry out all activities according to industry regulations and guidelines, WHS and environmental legislation, and enterprise policies and/or procedures |
4. Clean up work area and maintain equipment |
4.1. Collect and store material that can be reused 4.2. Remove waste and scrap following workplace procedures 4.3. Clean and inspect equipment and work area for serviceable condition in accordance with workplace procedures 4.4. Tag unserviceable equipment and faults identified in accordance with workplace requirements 4.5. Complete operator maintenance in accordance with manufacturer and component supplier specifications and site procedures 4.6. Maintain tooling and equipment in accordance with workplace procedures |
Required Skills and Knowledge
REQUIRED SKILLS AND KNOWLEDGE |
This section describes the skills and knowledge required for this unit. |
Required skills |
Required skills include:
|
Required knowledge |
Required knowledge includes:
|
Evidence Guide
EVIDENCE GUIDE |
|
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package. |
|
Overview of assessment |
|
Critical aspects for assessment and evidence required to demonstrate competency in this unit |
Assessors must be satisfied that the candidate can competently and consistently:
|
Context of , and specific resources for assessment |
|
Method of assessment |
|
Guidance information for assessment |
Assessment processes and techniques must be culturally sensitive and appropriate to the language and literacy capacity of the candidate and the work being performed. |
Range Statement
RANGE STATEMENT |
|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included. |
|
Water testing |
Water testing may include:
|
Factors influencing vessel performance |
Factors influencing vessel performance may include:
|
Safety check of vessel |
Safety check of vessel my include:
|
Test report |
Test report may include:
|
Tooling and equipment |
Tooling and equipment may include:
|
Safe operating procedures |
Safe operating procedures may include:
|
Information /documents |
Information/documents may include:
|
Legislative requirements |
Legislative requirements are to be in accordance with applicable commonwealth, state or territory legislation, regulations, certification requirements and codes of practice, and may include:
|
WHS requirements |
WHS requirements are to be in accordance with applicable commonwealth, state or territory legislation and regulations, and organisational safety policies and procedures, and may include:
|
Environmental requirements |
Environmental requirements may include:
|
Organisational policies and procedures |
Organisational policies and procedures may include:
|
Unit Sector(s)
Unit sector |
Marine |
Co-requisite units
Not applicable.
Competency field
Competency field |
Technical |