^

 
 

Unit of competency details

AHCSAW302 - Implement erosion and sediment control measures (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Supersedes and is equivalent to AHCSAW302A - Implement erosion and sediment control measuresThis unit is equivalent to AHCSAW302A Implement erosion and sediment control measures 26/Jun/2016
Is superseded by AHCSAW304 - Implement erosion and sediment control measuresChanges to Application and Performance Criteria for clarity. Updated Foundation Skills, Performance Evidence, Knowledge Evidence and Assessment Conditions 23/Dec/2020

Releases:
ReleaseRelease date
1 1 (this release) 27/Jun/2016


Training packages that include this unit

CodeSort Table listing Training packages that include this unit by the Code columnTitleSort Table listing Training packages that include this unit by the Title columnRelease
AHC - Agriculture, Horticulture and Conservation and Land Management Training PackageAgriculture, Horticulture and Conservation and Land Management Training Package 1.0-5.0 
BSB - Business Services Training PackageBusiness Services Training Package 3.0-6.1 
CPP - Property Services Training PackageProperty Services Training Package 10.0-17.0 
FWP - Forest and Wood Products Training PackageForest and Wood Products Training Package 3.0-6.3 
NWP - National Water Training PackageNational Water Training Package 3.0-4.3 

Qualifications that include this unit

CodeSort Table listing Qualifications that include this unit by the Code columnTitleSort Table listing Qualifications that include this unit by the Title columnUsage RecommendationRelease
AHC31616 - Certificate III in Lands, Parks and WildlifeCertificate III in Lands, Parks and WildlifeSuperseded1-3 
AHC31716 - Certificate III in Natural Area RestorationCertificate III in Natural Area RestorationSuperseded
NWP30219 - Certificate III in Water Industry OperationsCertificate III in Water Industry OperationsSuperseded1-4 
BSB42315 - Certificate IV in Environmental Management and SustainabilityCertificate IV in Environmental Management and SustainabilitySuperseded2-3 
AHC32316 - Certificate III in Conservation EarthworksCertificate III in Conservation EarthworksSuperseded
CPP30719 - Certificate III in Waste ManagementCertificate III in Waste ManagementCurrent1-4 
AHC31416 - Certificate III in Conservation and Land ManagementCertificate III in Conservation and Land ManagementSuperseded1-3 
CPP40919 - Certificate IV in Waste ManagementCertificate IV in Waste ManagementCurrent1-2 
AHC33816 - Certificate III in PermacultureCertificate III in PermacultureSuperseded1-2 
FWP30116 - Certificate III in Forest Growing and ManagementCertificate III in Forest Growing and ManagementSuperseded2-3 
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 10 of 10

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 050999 Environmental Studies, N.e.c.  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 050999 Environmental Studies, N.e.c.  14/Oct/2016 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Unit of competency

Modification History

Release

TP Version

Comment

1

AHCv1.0

Initial release

Application

This unit of competency describes the skills and knowledge required to construct, install and maintain a range of measures specified on erosion and sediment control plans.

This unit applies to individuals who work under broad direction and take responsibility for their own work including limited responsibility for the work of others.

No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.

Pre-requisite Unit

Nil.

Unit Sector

Soil and Water Conservation (SAW)

Elements and Performance Criteria

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for implementation and construction

1.1 Confirm that erosion and sediment control plan and schedule of works match site conditions

1.2 Identify survey pegs and site indicators on site

1.3 Match equipment and tools to program works and terrain on site

1.4 Verify work readiness of selected equipment and tools

1.5 Assess and minimise risks to others and the environment

1.6 Select and use appropriate personal protective equipment

1.7 Select materials to complete proposed works in line with construction schedule

2. Carry out implementation and construction

2.1 Plan work sequence

2.2 Construct earthworks

2.3 Install erosion and sediment control products and materials

3. Carry out repairs and maintenance procedures

3.1 Monitor site, identify issues and carry out repairs as necessary

3.2 Complete maintenance procedures as required

3.4 Clean and store machinery, tools and equipment

3.5 Complete work records

Foundation Skills

Foundation Skills essential to performance are explicit in the performance criteria of this unit of competency.

Range of Conditions

Unit Mapping Information

This unit is equivalent to AHCSAW302A Implement erosion and sediment control measures

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=c6399549-9c62-4a5e-bf1a-524b2322cf72

 

Assessment requirements

Modification History

Release

TP Version

Comment

1

AHCv1.0

Initial release

Performance Evidence

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

  • construct, install and maintain a range of erosion and sediment control measures
  • identify hazards and implement safe work procedures
  • prepare for implementation and construction
  • read and follow plans to carry out implementation and construction
  • identify survey pegs and site indicators on site and on the plans
  • carry out repairs and maintenance procedures to enterprise standards
  • select equipment and materials appropriate for the task
  • operate equipment and machinery according to safe work practices and manufacturer instructions
  • clean and store equipment, machinery and tools according to organisational requirements

Knowledge Evidence

The candidate must demonstrate knowledge of:

  • materials cartage pollution control
  • sequence of working and timing/duration
  • work health and safety issues relating to the equipment and the site
  • equipment used
  • materials suitable for constructing erosion and sediment control measures and where to source them on site
  • limitations of structures including timing of maintenance, structure life cycle, specifications and standards

Assessment Conditions

Assessors must satisfy current standards for RTOs.

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=c6399549-9c62-4a5e-bf1a-524b2322cf72