Unit of competency details

AHCSAW301A - Construct conservation earthworks (Release 1)

Summary

Usage recommendation:
Superseded
Mapping:
MappingNotesDate
Is superseded by and equivalent to AHCSAW301 - Construct conservation earthworksThis unit is equivalent to AHCSAW301A Construct conservation earthworks 26/Jun/2016
Supersedes RTD3205A - Construct conservation earthworks09/Jun/2011

Releases:
ReleaseRelease date
1 1 (this release) 10/Jun/2011

Training packages that include this unit

Qualifications that include this unit

CodeSort Table listing Qualifications that include this unit by the Code columnTitleSort Table listing Qualifications that include this unit by the Title columnUsage RecommendationRelease
AHC31410 - Certificate III in Conservation and Land ManagementCertificate III in Conservation and Land ManagementSuperseded1-4 
AHC31710 - Certificate III in Natural Area RestorationCertificate III in Natural Area RestorationSuperseded1-3 
AHC32310 - Certificate III in Conservation EarthworksCertificate III in Conservation EarthworksSuperseded
RII20209 - Certificate II in Surface Extraction OperationsCertificate II in Surface Extraction OperationsSuperseded
RII20213 - Certificate II in Surface Extraction OperationsCertificate II in Surface Extraction OperationsSuperseded1-3 
RII20215 - Certificate II in Surface Extraction OperationsCertificate II in Surface Extraction OperationsSuperseded
RII20609 - Certificate II in Mining Field/Exploration OperationsCertificate II in Mining Field/Exploration OperationsSuperseded2-3 
RII20613 - Certificate II in Mining / Field ExplorationCertificate II in Mining / Field ExplorationSuperseded1-3 
RII20615 - Certificate II in Mining / Field ExplorationCertificate II in Mining / Field ExplorationSuperseded
RII30112 - Certificate III in Surface Extraction OperationsCertificate III in Surface Extraction OperationsSuperseded
RII30113 - Certificate III in Surface Extraction OperationsCertificate III in Surface Extraction OperationsSuperseded1-4 
RII30115 - Certificate III in Surface Extraction OperationsCertificate III in Surface Extraction OperationsSuperseded
RII30611 - Certificate III in Small Mining OperationsCertificate III in Small Mining OperationsSuperseded2-3 
RII30613 - Certificate III in Small Mining OperationsCertificate III in Small Mining OperationsSuperseded1-3 
RII30615 - Certificate III in Small Mining OperationsCertificate III in Small Mining OperationsDeleted
RII30809 - Certificate III in Civil Construction Plant OperationsCertificate III in Civil Construction Plant OperationsSuperseded2-3 
RII30813 - Certificate III in Civil Construction Plant OperationsCertificate III in Civil Construction Plant OperationsSuperseded1-3 
RII30815 - Certificate III in Civil Construction Plant OperationsCertificate III in Civil Construction Plant OperationsSuperseded
RII31209 - Certificate III in Civil FoundationsCertificate III in Civil FoundationsSuperseded
RII31213 - Certificate III in Civil FoundationsCertificate III in Civil FoundationsSuperseded
Items per page 10 | 20 | 50 | 100
Displaying items 1 - 20 of 21

Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 040399 Building, N.e.c.  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 040399 Building, N.e.c.  04/Nov/2011 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Modification History

Not Applicable

Unit Descriptor

Unit descriptor 

This unit covers the construction of conservation earthworks and defines the standard required to: determine job requirements from plans and specifications; assess machinery and equipment requirements; construct planned earthworks; apply final finishing techniques.

Application of the Unit

Application of the unit 

This unit applies to workers who use specialised earthmoving techniques completed to fine tolerances. Construction is often carried out using a single earthmoving machine in varied conditions and terrains that requires the plant operator to develop skills that are unique to this sector. The use and operation of machinery and equipment used to construct these works is covered by separate units.

Licensing/Regulatory Information

Not Applicable

Pre-Requisites

Prerequisite units 

Employability Skills Information

Employability skills 

This unit contains employability skills.

Elements and Performance Criteria Pre-Content

Not Applicable

Elements and Performance Criteria

ELEMENT 

PERFORMANCE CRITERIA 

1. Prepare for construction

1.1. Confirm construction details and sequence.

1.2. Identify and locate worksite, site indicators and survey pegs.

1.3. Confirm work readiness of machinery and equipment.

1.4. Assess and minimise risks to others and the environment.

1.5. Select and use appropriate personal protective equipment.

1.6. Verify that equipment and attachments match terrain and program tasks.

2. Carry out work

2.1. Follow industry endorsed earthwork methods and patterns for specific machines.

2.2. Monitor and maintain optimum machinery loads in accordance with prevailing conditions.

2.3. Ensure that safe machinery operating techniques are deployed to match terrain, site conditions other operators and workers.

2.4. Ensure that excavation, transport, dumping and compaction of material is conducted in accordance with industry practice.

3. Apply finish techniques

3.1. Finish batters and surfaces in accordance with job requirements and industry practice.

3.2. Retain site features and vegetation in accordance with work plan/schedule.

3.3. Clear site and remove debris in accordance with work plan/schedule.

3.4. Complete topsoiling of disturbed areas and surfaces in accordance with industry standards and plan/schedule.

4. Finalise work

4.1. Complete work records.

4.2. Clean and store Personal Protective Equipment (PPE) and application equipment in accordance with manufacturer's specification and Occupational Health and Safety (OHS) requirements.

Required Skills and Knowledge

REQUIRED SKILLS AND KNOWLEDGE 

This section describes the skills and knowledge required for this unit.

Required skills 

  • identify hazards and implement safe operating procedures
  • prepare for construction
  • carry out planned earthworks and minimise damage to natural areas
  • apply finishing techniques
  • use literacy skills to read, interpret and follow organisational policies and procedures, follow sequenced written instructions, record accurately and legible information collected and select and apply procedures for a range of tasks
  • use oral communication skills/language competence to fulfil the job role as specified by the organisation, including questioning techniques, active listening, clarifying information and consulting with supervisors as required
  • use numeracy skills to estimate, calculate and record routine workplace measures
  • use interpersonal skills to work with and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge 

  • erosion and sediment control standards and principles
  • erosion control and design principles
  • natural area protection (particularly topsoil) and rehabilitation principles
  • soils and soil formation
  • principles of conservation earthwork construction including catchment management and soils
  • earthmoving principles
  • levels and levelling
  • natural area protection (including topsoil) and rehabilitation
  • types and application of personal protective equipment
  • legislation and regulations including Occupational Health and Safety (OHS) in relation to conservation earthwork construction
  • risk factors including human health, environmental damage
  • erosion and sedimentation control principles and practices
  • environmental impacts and controls for constructing conservation earthworks
  • OHS and environmental legislative and enterprise requirements.

Evidence Guide

EVIDENCE GUIDE 

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment 

Critical aspects for assessment and evidence required to demonstrate competency in this unit 

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

  • determine job requirements from plans and specifications
  • assess machinery and equipment requirements
  • construct planned earthworks
  • apply final finishing techniques.

Context of and specific resources for assessment 

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.

Range Statement

RANGE STATEMENT 

The range statement relates to the unit of competency as a whole.

Earthworks may include:

  • the range of conservation earthworks on rural lands including:
  • contour banks
  • waterways
  • dams
  • drainage structures
  • This unit does not include construction of access tracks or seismic lines, maintenance of fire breaks or land clearing.

Unit Sector(s)

Unit sector 

Soil and water conservation

Co-requisite units

Co-requisite units 

Competency field

Competency field