Unit of competency details

AHCPER317 - Build with earth, straw and reclaimed materials (Release 1)

Summary

Usage recommendation:
Deleted
The Deleted usage recommendation was implemented on 13 June 2017 to describe training components that have no replacement. Enrolments in training components and statements of attainment or qualifications issued before 13 June 2017 are valid. For any components marked as deleted after 13 June 2017, the applicable transition/teach-out periods apply. For specific questions regarding the enrolment, delivery or issuance of a statement of attainment/qualification, please contact your training regulator.
Mapping:
MappingNotesDate
DeletedDeleted from AHC Agriculture, Horticulture and Conservation and Land Management Training Package12/Feb/2021

Releases:
ReleaseRelease date
1 1 (this release) 27/Jun/2016


Classifications

SchemeCodeClassification value
ASCED Module/Unit of Competency Field of Education Identifier 040301 Building Science And Technology  

Classification history

SchemeCodeClassification valueStart dateEnd date
ASCED Module/Unit of Competency Field of Education Identifier 040301 Building Science And Technology  14/Oct/2016 
The content being displayed has been produced by a third party, while all attempts have been made to make this content as accessible as possible it cannot be guaranteed. If you are encountering issues following the content on this page please consider downloading the content in its original form

Unit of competency

Modification History

Release

TP Version

Comment

1

AHCv1.0

Initial release

Application

This unit of competency describes the skills and knowledge required to build with earth, straw and reclaimed materials, using techniques that use local earth, straw and rock, and that turn problems into solutions by converting waste, surplus or low embodied energy materials into solid and serviceable structures.

All work is carried out to comply with workplace procedures. Individuals observe manufacturer’s specifications and follow operating instructions when using tools and equipment.

This unit applies to individuals who take responsibility for their own work and for the quality of the work of others. They use discretion and judgement in the selection, allocation and use of available resources.

No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.

Pre-requisite Unit

Nil.

Unit Sector

Permaculture (PER)

Elements and Performance Criteria

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Research building methods

1.1 Research appropriate building methods to decide which methods will be appropriate for the project

1.2 Review the availability of materials locally and their suitability for the chosen method

1.3 Consult experts and tradespeople to confirm suitability of chosen building method and materials

2. Prepare for the building project

2.1 Collect materials on site

2.2 Obtain labour support and engage experts where necessary

2.3 Clear the site and mark out the area

3. Build with earth, straw and reclaimed materials

3.1 Using the chosen method, commence building the structure

3.2 Use reclaimed materials where possible and ensure that they are structurally suitable

3.3 Use natural finishes and treatments where possible and appropriate

4. Limit and re-use surplus and waste materials

4.1 Ensure that the surplus or waste materials are stockpiled or stored for future re-use where possible

4.2 Demonstrate appropriate uses for all available materials and share and swap with other projects where possible

4.3 Limit the amount of waste material removed from the site and ensure that it goes to a new use rather than to landfill wherever possible

5. Check quality of work and clean-up site

5.1 Inspect quality of finished works and ensure the standard of the finished built structure is appropriate to the permaculture design drawings and specifications

5.2 Clean up debris from structure and site

5.3 Clean and store tools and equipment

Foundation Skills

Foundation Skills essential to performance are explicit in the performance criteria of this unit of competency.

Range of Conditions

Unit Mapping Information

New unit.

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=c6399549-9c62-4a5e-bf1a-524b2322cf72

 

Assessment requirements

Modification History

Release

TP Version

Comment

1

AHCv1.0

Initial release

Performance Evidence

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

  • research building methods
  • prepare for the building project
  • build with earth, straw and/or reclaimed materials
  • limit and re-use surplus and waste materials
  • ensure the standard of the finished built structure is appropriate to the permaculture design

Knowledge Evidence

The candidate must demonstrate knowledge of:

  • permaculture principles regarding structures and the built environment
  • Building methods, such as
  • mud brick
  • straw bale
  • cobb & light earth
  • rammed earth (Pise)
  • wattle and daub
  • stabilised/compressed earth brick
  • earth ship
  • aerated concrete
  • compressed paper and timber fibres
  • wool brick
  • air dried timber
  • structural issues
  • planning issues
  • properties of materials and suitability of local soils and timbers for building uses
  • environmental, logistical and safety factors, such as:
  • issues related to harvesting and milling of local timbers
  • possible contaminants in or on materials
  • weight and size of materials and their transport to the site
  • reclaimed materials, such as:
  • commercial timber off-cuts and wastes
  • demolition materials (timbers, windows and doors, plumbing fittings, roofing materials, bricks and other masonry items)
  • railway sleepers, telegraph poles, bridge timbers and other heavy reclaimed timbers
  • metal mesh and grill-work (fridge and oven shelves, wire baskets, fence panels, bed frames and bases, chicken wire, aviary mesh, pig/dog wire and other wire mesh products in small or large quantities)
  • reinforcing mesh and rods, trench mesh
  • pallets and packaging crates
  • shipping containers, ex-transport carriages, old cars, trailers and caravans
  • mirrors
  • bottles (glass and plastic)
  • ceramics and flower pots
  • car & truck tyres, windscreens, panels and seats
  • machinery parts
  • drums and cans
  • palings and weatherboards
  • reclaimed concrete
  • typical permaculture structures, such as
  • garden structures and features
  • fences and trellising
  • animal housing and shelters
  • seating and garden walls
  • retaining walls and small dam walls (including observing all regulatory conditions)
  • sheds or small outbuildings (including observing all regulatory conditions)
  • components of houses or other buildings ((including observing all regulatory conditions and work with professionals on larger structures)
  • the correct use of hand and power tools and other work health and safety requirements associated with installing structures and features
  • techniques for working with reclaimed materials such as de-nailing, stripping old paint, dressing timber
  • WHS considerations associated with recycled materials such as identification of lead paint, broken glass, rusty metal, chemically treated materials
  • comparative environmental implications associated with excavation and construction activity
  • safe lifting and transporting techniques
  • appropriate use of personal protective clothing and equipment (PPE)
  • appropriate use and installation of safety signs and barriers
  • site access points
  • implication of alteration to water flow during and after construction

Assessment Conditions

Assessors must satisfy current standards for RTOs. Assessors must also hold a nationally accredited Certificate III (or higher) in Permaculture. Completion of a Permaculture Design Course (PDC) is not sufficient at this level.

Links

Companion Volume implementation guides are found in VETNet - https://vetnet.gov.au/Pages/TrainingDocs.aspx?q=c6399549-9c62-4a5e-bf1a-524b2322cf72