Modification History
Release |
Action |
Core/Elective |
Details |
Points |
3 |
Update |
Group A |
HLTCPR211A Perform CPR |
10 |
4 |
Update |
Elective |
HLTAID001 - Provide cardiopulmonary resuscitation |
10 |
4 |
Edit |
Core |
Correct title of UEENEEK142A - Apply environmentally and sustainable procedures in the energy sector |
20 |
Description
Scope
The installation, commissioning and de-commissioning of single head, split air conditioning and heat pumps systems to a prescribed routine where the maximum plant capacity for each system does not exceed 18 kWr.
This includes wall hung, floor and ceiling suspended, cassette and ducted fan coil split systems and water heating heat pump systems. This qualification excludes competencies required for service, repair, maintenance, diagnostic/fault finding and electrical work or the safe and proper installation of commercial refrigeration, air conditioning and heat pump plant and equipment.
Note: 1. The letter “r” denotes “refrigeration” or cooling capacity, not electrical input power.
2. The Ozone Protection and Synthetic Greenhouse Gas Legislation Amendment Bill 2003 and the Ozone Protection and Synthetic Gas Management Regulations apply to this qualification. Prior to planning the delivery of any training and/or assessment activities all legislative and regulatory requirements shall be identified and included.
^ From 1 July 2022 the elective unit HLTAID001 must no longer be delivered and will be replaced in the Packaging Rules by the unit HLTAID009 - for more information see: https://asqa.gov.au/news-events/news/reminder-about-superseded-hlt-first-aid-units
Pathways Information
Not Applicable
Licensing/Regulatory Information
Not Applicable
Entry Requirements
Not Applicable
Employability Skills Summary
Not Applicable
Packaging Rules
Completion requirements
The requirements for granting this qualification will be met when competency is demonstrated and achieved for:
- All the Core competency standard units, defined in the Core Competency Standard Units table below and
- A combination of Elective competency standard units to achieve a total weighting of 20 points in accordance with the Elective Competency Standard Units table below.
Core Competency Standard Units All Core competency standard units to be achieved |
Weighting Points |
|
UEENEEE038B |
Participate in development and follow a personal competency development plan |
20 |
UEENEEE101A |
Apply Occupational Health and Safety regulations, codes and practices in the workplace |
20 |
UEENEEE102A |
Fabricate, assemble and dismantle utilities industry components |
40 |
UEENEEE105A |
Fix and secure electrotechnology equipment |
20 |
UEENEEE107A |
Use drawings, diagrams, schedules, standards, codes and specifications |
40 |
UEENEEE137A |
Document and apply measures to control OHS risks associated with electrotechnology work |
20 |
UEENEEJ102A |
Prepare and connect refrigerant tubing and fittings |
30 |
UEENEEJ105A |
Position, assemble and start up single head split air conditioning and water heating heat pump systems |
70 |
UEENEEJ172A |
Recover, pressure test, evacuate, charge and leak test refrigerants - split systems |
60 |
UEENEEK142A |
Apply environmentally and sustainable procedures in the energy sector |
20 |
Total points in core |
340 |
Elective Competency Standard Units Complete Elective units to achieve a total of weighting of 20 points from the following groups: |
||||
Group |
Minimum points |
Maximum points |
||
A |
Imported and Common Elective Units Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 2. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points. |
0 |
20 |
|
B |
Qualification Elective Units You may select all your elective units from this Group |
0 |
20 |
|
Group A – Imported and Common Elective Units You may complete units to a maximum weighting of 20 |
Weighting Points |
|||
UEENEEC001B |
Maintain documentation |
20 |
||
UEENEEC002B |
Source and purchase material/parts for installation or service jobs |
20 |
||
UEENEEC008B |
Receive and store materials and equipment for electrotechnology work |
20 |
||
UEENEEC010B |
Deliver a service to customers |
20 |
||
UEENEEE020B |
Provide basic instruction in the use of electrotechnology apparatus |
20 |
||
CPCCOHS1001A |
Work safely in the construction industry |
10 |
||
HLTAID001 ^ HLTAID009 |
Provide cardiopulmonary resuscitation Provide cardiopulmonary resuscitation (must be delivered from 1 July 2022) |
10 |
||
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 2. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points. Note: For further information see Application of the NQC Flexibility Formula, UEE11 Electrotechnology Training Package, Version 1, Volume 1 Qualification Framework |
Up to 20 points |
Group B – Qualification Elective Units You may complete units to a maximum weighting of 20 You may select all your elective units from this Group |
Weighting Points |
|
UEENEEJ104A |
Establish the basic operating conditions of air conditioning systems |
20 |
UEENEEP024A |
Attach cords and plugs to electrical equipment for connection to a single phase 230 Volt supply |
20 |
UEENEEP026A |
Conduct in-service safety testing of electrical cord connected equipment and cord assemblies |
20 |
Note:
1. Pre-requisite pathways shall be identified and met for all elective units selected.
2. In selecting elective units considerations to career planning advice should be given to units that form part of a pre-requisite pathway for the progression to achieve particular competencies or qualification at a higher level.
END OF QUALIFICATION