Modification History
Release 3
This is the third release of this skill set in TLI10 Transport and Logistics Training Package Version 3.0.
Units revised. Equivalent to previous version of the skill set.
Description
This skill set targets anyone required to plan and implement track possession protection as part of their job role as a protection officer; it is not aligned to any specific qualification and can be achieved separately.
Pathways Information
Licensing/Regulatory Information
Readers should ensure that they have also read the part of the Training Package that outlines licensing and regulatory requirements.
Skill Set Requirements
A total of 4 units of competency must be completed. |
|
Unit /s |
|
TLIF2080C |
Safely access the rail corridor |
TLIF3083B |
Conduct track protection assessment |
TLIC2081A |
Pilot rail traffic within work on track authority limits |
TLIL3084A |
Implement a local possession authority |
Target Group
This is a skill set used in the role of possession protection officer within the general rail infrastructure environment that is required to plan and implement track possession protection.
Suggested words for Statement of Attainment
These competencies from the TLI10 Transport and Logistics Training Package (Version 3) meet the needs of protection officer duties. The competencies are drawn from a nationally endorsed Training Package, and provide the skills and knowledge for a person working as a possession protection officer operating within the general rail infrastructure environment. |